| Firm | Filings | Most Recent |
|---|---|---|
| HCN DESIGN | 8 | 08/26/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| N.Y. PREFERRED DEVELOPMENT | General Contractor | 1 | 09/25/2026 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Construction Fence | Permit Issued | N.Y. PREFERRED DEVELOPMENT | 09/24/2026 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/13/2026 | — | — | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/27/2026 | Permit Issued | RICHARD NEU | — |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/11/2026 | Post-installed Anchors | — | special |
| 08/10/2026 | Post-installed Anchors | — | special |
| 08/10/2026 | Subgrade Inspections | — | special |
| 08/10/2026 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 08/10/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 08/10/2026 | Concrete - Cast-In-Place | — | special |
| 08/10/2026 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 05/21/2026 | Electrical motors and elevators | — | energy_progress |
| 05/21/2026 | Lighting controls | — | energy_progress |
| 05/21/2026 | Exterior lighting power | — | energy_progress |
| 05/21/2026 | Interior lighting power | — | energy_progress |
| 05/21/2026 | Lighting in dwelling units | — | energy_progress |
| 05/21/2026 | Metering | — | energy_progress |
| 04/20/2026 | Final | — | progress |
| 04/20/2026 | Concrete - Cast-In-Place | — | special |
| 04/20/2026 | Final | — | progress |
| 04/20/2026 | Masonry | — | special |
| 04/20/2026 | Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities | — | special |
| 04/20/2026 | Structural Cold-Formed Steel | — | special |
| 04/20/2026 | Footing and Foundation | — | progress |
| 04/18/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 04/18/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 04/18/2026 | Post-installed Anchors | — | special |
| 04/18/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 04/18/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |