← Back
Primarily 3 family with 1 store or office
31-03 30 AVENUE
QUEENS · BIN 4008598
💬 Discuss this project
1928Year Built
3Stories
S3Building Class
C4-2AZoning
4,884 sfGross Floor Area
4Units
Rent Stabilized6 Open Violations ▸
Primarily 3 family with 1 store or office · Owner of record: GDH REALTY CO · 1,650 sf lot · 2.96 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAFE-SHIELD ENTERPRISES407/08/2026
GDH REALTY1603/22/2026
GHD REALTY203/21/2026
31-03 30 AVE203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GEORGIOS G GEORGOPOULOS, R.A.207/17/2023
ASHRAF CORP102/08/2023
JOHN STACOM ARCHITECTURAL DESIGN212/11/2019
FANG ARCHITECT101/25/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANICO SERVICES203/21/2026
JOHN STACOM ARCHITECTURAL DESIGN203/21/2026
INDESIGN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CELATECH CONSTRUCTION CORGeneral Contractor203/21/2026
FOUR STAR AIR CON'D CO LLGeneral Contractor203/21/2026
AMERICAN STANDARD INTERIOGeneral Contractor107/08/2026
SAFE-SHEILD ENTERPRISE INGeneral Contractor107/08/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NS ENGINEERING & CONSULTI3652112/11/2019
Building Lifecycle
All (47)Filed (6)Permit Issued (5)Signed Off (4)Violation (15)Objection (6)Special Inspection (11)
11/25/2025
Violation issued (HPD, open)
I
11/29/2023
Violation issued (HPD, closed)
I
08/31/2023
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 BUIILDING CODE.
Q00825083-I1
07/28/2023
Special inspection requirement — Fire-Resistance Rated Construction
Georgios Georgopoulos
07/17/2023
Filed — Alteration
PROVIDE EXTERIOR ACRYLIC STUCCO ON TOP OF EXISTING BRICK WALL ON FRONT FACADE OF BUILDING. EXISTING BRICK FACADE TO NOT BE REMOVED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00764858-P1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/23/2023
Special inspection requirement — Fire-Resistance Rated Construction
Georgios Georgopoulos
06/08/2023
Permit issued — General Construction
Q00764858-I1-GC
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/09/2023
Permit issued — Sidewalk Shed
Q00825083-I1-SH
02/08/2023
Filed — Alteration
HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 BUIILDING CODE.
Q00825083-I1
12/12/2022
Objection resolved — Addressed
12/12/2022
Objection resolved — Addressed
12/12/2022
Objection resolved — Addressed
11/18/2022
Violation issued (HPD, closed)
I
08/02/2022
Objection raised — Scope
08/02/2022
Objection raised — Other
08/02/2022
Objection raised — Inspections
07/28/2022
Filed — Alteration
PROVIDE EXTERIOR ACRYLIC STUCCO ON TOP OF EXISTING BRICK WALL ON FRONT FACADE OF BUILDING. EXISTING BRICK FACADE TO NOT BE REMOVED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00764858-I1
05/18/2022
Signed off — Alteration
CONSTRUCTION FENCE FOR DOB JOB APPLICATION #421603928.
Q00087624-I1
05/18/2022
Signed off — Alteration
Proposed installation of new ac units and refrigeration units at roof. Dunnage filed under associated application #421603928.No change to use, egress, or occupancy.
Q00279176-I1
12/13/2019
Permit issued — Mechanical Systems
Q00279176-I1-MS
12/11/2019
Filed — Alteration
Proposed installation of new ac units and refrigeration units at roof. Dunnage filed under associated application #421603928.No change to use, egress, or occupancy.
Q00279176-I1
12/10/2019
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARI MOTWANI
12/10/2019
Special inspection requirement — Final
CLARENCE WEIGOLD, JR
12/10/2019
Special inspection requirement — Energy Code Compliance Inspections
CLARENCE WEIGOLD, JR
12/10/2019
Special inspection requirement — HVAC and service water heating equipment
CLARENCE WEIGOLD, JR
12/10/2019
Special inspection requirement — HVAC and service water heating system controls
CLARENCE WEIGOLD, JR
12/10/2019
Special inspection requirement — Maintenance information
CLARENCE WEIGOLD, JR
12/10/2019
Special inspection requirement — HVAC insulation and sealing
CLARENCE WEIGOLD, JR
12/10/2019
Special inspection requirement — Permanent certificate
CLARENCE WEIGOLD, JR
12/10/2019
Special inspection requirement — Mechanical Systems
NARI MOTWANI
03/01/2019
Signed off — Alteration
Q00121818-I1
02/01/2019
Permit issued — Sign
Q00121818-I1-SG
01/25/2019
Filed — Alteration
Q00121818-I1
11/15/2018
Permit issued — Construction Fence
Q00087624-I1-FN
10/25/2018
Filed — Alteration
CONSTRUCTION FENCE FOR DOB JOB APPLICATION #421603928.
Q00087624-I1
10/01/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/03/2009
Violation issued (ECB, closed)
Unknown
07/27/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/05/2007
Violation issued (ECB, closed)
Construction
05/29/2007
Violation issued (ECB, closed)
Construction
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCELATECH CONSTRUCTION COR06/08/2023
DOB NOWSidewalk ShedSigned-offSAFE-SHEILD ENTERPRISE IN02/09/2023
DOB NOWMechanical SystemsSigned-offFOUR STAR AIR COND CO LL12/13/2019
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC02/01/2019
DOB NOWConstruction FenceSigned-offAMERICAN STANDARD INTERIO11/15/2018
BISOTISSUEDSK SIGN & AWNING SOLUTION02/20/2019
BISPLISSUEDHYDROKINETIC PLBG & HTG I09/28/2018
BISOTISSUEDAMERICAN STANDARD INTERIO09/05/2018
BISOTISSUEDPROPER CONTRACTING CORP07/02/2007
BISOTISSUEDPROPER CONTRACTING CORP05/04/2007
BISEQISSUEDARSENAL SCAFFOLD INC04/23/2007
BISEQISSUEDARSENAL SCAFFOLD INC04/23/2007
1 project · most recent 09/21/2018
General Wiring
FiledStatusContractorScope
09/21/2018CompleteDELTA ELEC'L CONTR'G CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
07/28/2023Fire-Resistance Rated ConstructionGeorgios Georgopoulosprogress
06/23/2023Fire-Resistance Rated ConstructionGeorgios Georgopoulosprogress
12/10/2019Fire-Resistant Penetrations and JointsNARI MOTWANIspecial
12/10/2019FinalCLARENCE WEIGOLD, JRprogress
12/10/2019Energy Code Compliance InspectionsCLARENCE WEIGOLD, JRprogress
12/10/2019HVAC and service water heating equipment CLARENCE WEIGOLD, JRenergy_progress
12/10/2019HVAC and service water heating system controls CLARENCE WEIGOLD, JRenergy_progress
12/10/2019Maintenance informationCLARENCE WEIGOLD, JRenergy_progress
12/10/2019HVAC insulation and sealing CLARENCE WEIGOLD, JRenergy_progress
12/10/2019Permanent certificateCLARENCE WEIGOLD, JRenergy_progress
12/10/2019Mechanical SystemsNARI MOTWANIspecial
▾Documents — 67 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch4
08/28/2026Q00087624-I1Request digital key ↗
08/25/2026Q00825083-I1Request digital key ↗
08/24/2026Q00764858-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sign1
08/28/2026Q00121818-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/28/2026Q00279176-I1Request digital key ↗
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION6
02/23/2022421603928Open ↗
02/07/2022421603928Open ↗
12/23/2021421603928Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION3
02/21/2019421722041Open ↗
10/12/2018421603928Open ↗
10/01/2018421603928Open ↗
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature9
08/27/2026Q00764858-P1Open ↗
08/26/2026Q00764858-I1Open ↗
08/24/2026Q00279176-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/28/2026Q00087624-I1Open ↗
08/28/2026Q00121818-I1Open ↗
08/28/2026Q00279176-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
03/20/2019421722041Open ↗
02/01/2019421722041Open ↗
01/19/2019421603928Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
02/01/2019421722041Open ↗
01/19/2019421603928Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
02/01/2019421722041Open ↗
01/19/2019421603928Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026Q00279176-I1Open ↗
08/24/2026Q00279176-I1Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/19/2019421603928Open ↗
▸BISPLUMBING (PL) SIGNOFF1
04/19/2022421603928Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST1
01/19/2019421603928Open ↗
▸BISTenant Protection Plan and Notes1
01/19/2019421603928Open ↗
▸DOB NOWTenant Protection Plan1
08/28/2026Q00279176-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/28/2026Q00121818-I1Open ↗
08/28/2026Q00279176-I1Open ↗
08/24/2026Q00764858-P1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/19/2019421603928Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
01/19/2019421603928Open ↗
10/12/2018421603928Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
04/19/2022421603928Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
04/19/2022421603928Open ↗
▸BISFENESTRATION AIR LEAKAGE1
04/19/2022421603928Open ↗
▸BISINTERIOR LIGHTING POWER1
04/19/2022421603928Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/19/2022421603928Open ↗
▸BISFENESTRATION AREAS1
04/19/2022421603928Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
04/20/2022421603928Open ↗
03/20/2019421722041Open ↗
▸BISCONSTRUCTION (OT) SIGNOFF1
04/19/2022421603928Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
03/20/2019421722041Open ↗
02/01/2019421722041Open ↗
01/19/2019421603928Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
04/19/2022421603928Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
02/01/2019421722041Open ↗
01/19/2019421603928Open ↗
▸BISADDITIONAL INFORMATION1
02/23/2022421603928Open ↗