ECB09/12/2009WORK W/O A PERMIT. WORK NOTED: AT THE FRONT OF PREMISES BRICK PAVING HAS BEEN COMPLETED APPROX 400 S F (25'W X 16'D) ALLOWING STORM WATER TOFLOW TOWARDS THE SIDEWALK/STREET. NO STORM SEWER SYSTEM HAS BEEN INSTANothing owed — awaiting certificate of correction
Five to six families · 2,500 sf lot · 1.95 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)