← Back
Over six families without stores
37-17 34 AVENUE
QUEENS · BIN 4010373
💬 Discuss this project
1926Year Built
4Stories
C1Building Class
R5Zoning
10,200 sfGross Floor Area
12Units
Rent Stabilized20 Open Violations 18 unresolved · 2 paperwork only ▸
Over six families without stores · Owner of record: 37-17 34TH AVENUE LLC · 2,925 sf lot · 3.49 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof3p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PJC HOLDING1407/08/2026
37-17 34TH AVENUE LLC103/22/2026
ALMA REALTY203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/06/2024$2.6M—P.J.C. HOLDING CORP. → 37-17 34TH AVENUE LLC$255/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THE MTM DESIGN GROUP, LLC306/24/2026
NEW YORK ENGINEERING ASSOC., P.C.207/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P C403/21/2026
CONSTRUCTION PERMIT SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEPTUNE MECHANICAL INCPlumbing207/08/2026
CEL TECH ELECTRIC INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THE MTM DESIGN GROUP, LLC1319506/24/2026
NEW YORK ENGINEERING ASSO851207/10/2025
Building Lifecycle
All (87)Filed (5)Permit Issued (3)Signed Off (2)Violation (60)Inspection (3)Objection (6)Special Inspection (8)
08/06/2026
Objection resolved — Resolved
07/09/2026
Objection raised — Other
06/24/2026
Filed — Alteration
Modification to existing VERIZON site. Replace 6 RRHs, remove 3 RRHs, install 3 OVPs, replace 4 antennas, remove 1 equipment cabinet, and install 1 platform with 3 cabinets on the roof.
Q00835502-P1
05/06/2026
Violation issued (HPD, open)
A
12/08/2025
Signed off — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING. INSTALL NEW GAS HOT WATER HEATER.
Q01250477-I1
12/05/2025
Signed off — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING. INSTALL NEW GAS HOT WATER HEATER.
Q01250477-S1
10/27/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/20/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/15/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/31/2025
Permit issued — Boiler Equipment
Q01250477-I1-BE
07/31/2025
Permit issued — Plumbing
Q01250477-S1-PL
07/10/2025
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING. INSTALL NEW GAS HOT WATER HEATER.
Q01250477-I1
07/10/2025
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING. INSTALL NEW GAS HOT WATER HEATER.
Q01250477-S1
07/10/2025
Special inspection requirement — Maintenance information
LOUIS ARENA
07/02/2025
Special inspection requirement — Heating Systems
LOUIS ARENA
07/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
07/02/2025
Special inspection requirement — Maintenance information
LOUIS ARENA
07/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
07/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
07/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
07/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
06/24/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/11/2025
Violation issued (HPD, open)
A
11/29/2024
Violation issued (HPD, closed)
I
06/30/2024
Violation issued (HPD, open)
C
02/20/2024
Violation issued (HPD, open)
B
02/20/2024
Violation issued (HPD, open)
A
02/20/2024
Violation issued (HPD, open)
A
02/20/2024
Violation issued (HPD, open)
A
02/20/2024
Violation issued (HPD, open)
B
01/16/2024
Objection resolved — Addressed
01/10/2024
Objection raised — Inspections
01/02/2024
Objection resolved — Addressed
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/04/2023
Objection raised — Other
05/31/2023
Filed — Alteration
Modification to existing VERIZON site. Replace 6 RRHs, remove 3 RRHs, install 3 OVPs, replace 4 antennas, remove 1 equipment cabinet, and install 1 platform with 3 cabinets on the roof.
Q00835502-I1
03/27/2023
Violation issued (HPD, closed)
A
11/15/2022
Violation issued (HPD, closed)
I
08/29/2022
Violation issued (HPD, closed)
B
08/29/2022
Violation issued (HPD, closed)
B
08/29/2022
Violation issued (HPD, closed)
B
08/29/2022
Violation issued (HPD, closed)
A
08/29/2022
Violation issued (HPD, closed)
C
08/29/2022
Violation issued (HPD, closed)
B
08/22/2022
Violation issued (HPD, closed)
A
08/22/2022
Violation issued (HPD, closed)
A
08/22/2022
Violation issued (HPD, closed)
C
08/15/2022
Violation issued (HPD, closed)
B
08/15/2022
Violation issued (HPD, closed)
B
08/15/2022
Violation issued (HPD, open)
B
08/15/2022
Violation issued (HPD, closed)
A
08/15/2022
Violation issued (HPD, open)
B
08/15/2022
Violation issued (HPD, closed)
C
08/15/2022
Violation issued (HPD, closed)
C
08/15/2022
Violation issued (HPD, open)
A
08/15/2022
Violation issued (HPD, closed)
C
08/15/2022
Violation issued (HPD, closed)
B
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offNEPTUNE MECHANICAL INC07/31/2025
DOB NOWPlumbingSigned-offNEPTUNE MECHANICAL INC07/31/2025
DOB NOWAntennaPermit IssuedCEL TECH ELECTRIC INC03/25/2020
BISOTISSUEDJACOBS TELECOMMUN. INC10/20/2015
BISOTISSUEDFIVE BOROUGH GEN CONT LLC04/07/2009
BISBLISSUEDALLISON A. HEANEY04/01/2009
BISEQISSUEDM.S.S. CONSTRUCTION CORP03/06/2009
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/27/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/15/2025Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
07/10/2025Maintenance informationLOUIS ARENAenergy_progress
07/02/2025Heating SystemsLOUIS ARENAspecial
07/02/2025Tenant Protection Plan ComplianceLOUIS ARENAspecial
07/02/2025Maintenance informationLOUIS ARENAenergy_progress
07/02/2025HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
07/02/2025HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
07/02/2025Tenant Protection Plan ComplianceLOUIS ARENAspecial
07/02/2025HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch4
08/24/2026Q00835502-P1Request digital key ↗
08/24/2026Q00835502-I1Request digital key ↗
08/19/2026Q01250477-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Antenna1
08/28/2026Q00127379-I1Request digital key ↗
▸Applications & Permits9
▸BISWORK PERMIT APPLICATION5
10/21/2015421171163Open ↗
04/07/2009420037463Open ↗
04/01/2009420001018Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
06/11/2015421171163Open ↗
04/01/2009420001018Open ↗
03/26/2009420037463Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications18
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
10/21/2015421171163Open ↗
10/21/2015421171163Open ↗
06/22/2009420037463Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/28/2026Q00127379-I1Open ↗
08/24/2026Q00835502-P1Open ↗
08/24/2026Q00835502-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/01/2009420001018Open ↗
03/03/2009410230021Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
04/01/2009420001018Open ↗
03/03/2009410230021Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026Q01250477-I1Open ↗
08/23/2026Q01250477-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026Q01250477-I1Open ↗
08/23/2026Q01250477-S1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
04/01/2009420001018Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
04/01/2009420001018Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/28/2026Q00127379-I1Open ↗
08/24/2026Q00835502-I1Open ↗
08/14/2026Q00835502-P1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
03/26/2009420037463Open ↗
03/03/2009410230021Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/11/2015421171163Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/01/2009420001018Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/21/2015421171163Open ↗
10/21/2015421171163Open ↗
▸Approvals, Objections & Sign-offs5
▸BISADMINISTRATIVE OBJECTIONS4
06/11/2015421171163Open ↗
04/01/2009420001018Open ↗
03/26/2009420037463Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/22/2009420037463Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
10/22/2015421171163Open ↗
06/11/2015421171163Open ↗
06/22/2009420037463Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET4
06/11/2015421171163Open ↗
04/01/2009420001018Open ↗
03/26/2009420037463Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION1
10/22/2015421171163Open ↗