← Back
Three families
20-58 36 STREET
QUEENS · BIN 4016764
💬 Discuss this project
1980Year Built
2Stories
C0Building Class
R4-1Zoning
2,100 sfGross Floor Area
3Units
Rent Stabilized0 Open Violations
Three families · 2,300 sf lot · 0.91 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 06/05/2025
Gas
FiledStatusContractorScope
06/05/2025Signed-offUNLIMITED PLG SOLUTIONSGas
Building Lifecycle
All (12)Filed (2)Permit Issued (1)Violation (6)Inspection (3)
11/21/2025
Violation issued (HPD, closed)
I
06/11/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/05/2025
Filed — Alteration
AS REQUIRED BY PERIODIC INSPECTION REPORT GPS-1 REMOVE GAS VALVE IN CEILING AND VOLUNTARILY REPLACE EXISTING GAS METER BAR AND GAS PIPING FOM METER TO BOILER AND DRYER IN CELLAR AND DOMESTIC RANGE ON 2ND FLOOR.
Q01208525-P1
05/23/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/22/2025
Permit issued — Plumbing
Q01208525-I1-PL
04/15/2025
Filed — Alteration
AS REQUIRED BY PERIODIC INSPECTION REPORT GPS-1 REMOVE GAS VALVE IN CEILING AND VOLUNTARILY REPLACE EXISTING GAS METER BAR AND GAS PIPING FOM METER TO BOILER AND DRYER IN CELLAR AND DOMESTIC RANGE ON 2ND FLOOR.
Q01208525-I1
11/24/2023
Violation issued (HPD, closed)
I
03/27/2023
Violation issued (HPD, closed)
A
03/03/2022
Violation issued (HPD, closed)
A
04/14/2021
Violation issued (HPD, closed)
A
12/01/2017
Violation issued (HPD, closed)
I
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
G. PEROTTO ASSOCIATES206/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
G PEROTTO ASSOCIATES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UNLIMITED PLG SOLUTIONSPlumbing107/08/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCENTA PLBG & HTG INC04/22/2025
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/11/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Documents — 4 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026Q01208525-P1Request digital key ↗
08/20/2026Q01208525-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/20/2026Q01208525-P1Open ↗
08/20/2026Q01208525-I1Open ↗