One story retail building
33-14 23 AVENUE
QUEENS · BIN 4017154
💬 Discuss this project
1931Year Built
1Stories
K1Building Class
R5DZoning
1,080 sfGross Floor Area
1Units
0 Open Violations
One story retail building · 1,800 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
Architecture
Cellar1p · 1 filing · 4 docs
1 job · most recent 07/15/2022
Sprinkler System
FiledStatusContractorScope
07/15/2022Signed-offTHOMAS FAYSprinkler System
1 job · most recent 06/22/2026
Steel Concrete
FiledStatusContractorScope
06/22/2026——Steel, Concrete
Building Lifecycle
All (56)Filed (6)Permit Issued (16)Signed Off (2)Violation (10)Inspection (1)Objection (8)Special Inspection (13)
07/29/2026
Objection resolved — Resolved
07/29/2026
Objection resolved — Resolved
07/29/2026
Objection resolved — Resolved
07/16/2026
Objection raised — Other
07/16/2026
Objection raised — Other
07/16/2026
Objection raised — Other
06/22/2026
Filed — Alteration
INTERIOR RENOVATION AND PARTIAL STRUCTURAL SUPPORT OF AN EXISTING NON COMPLYING LAUNDROMAT. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
Q01412961-I1
06/05/2026
Special inspection requirement — Structural Steel - Details
06/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/05/2026
Special inspection requirement — Final
EMANUEL KAMBANIS
06/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
11/07/2025
Permit issued — Sprinklers
Q00166015-I1-PL
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/10/2024
Permit issued — Sprinklers
Q00166015-I1-PL
06/24/2024
Signed off — Alteration
REPLACE OIL FIRED BOILER WITH TWO OIL FIRED HOT WATER HEATERS. INSTALL TWO (2) OIL BURNERS ON TWO (2) OIL FIRED HOT WATER HEATERS. INSTALL WATER PIPING IN CELLAR FOR WATER HEATERS.
Q00690437-I1
05/13/2024
Signed off — Alteration
INSTALL CHIMNEY LINER IN EXISTING MASONRY CHIMNEY
Q00714426-I1
05/06/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/27/2024
Permit issued — General Construction
Q00714426-I1-GC
01/22/2024
Permit issued — Plumbing
Q00690437-I1-PL
11/02/2023
Permit issued — Sprinklers
Q00166015-I1-EW-SP
09/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
09/19/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
09/18/2023
Filed — Alteration
REPLACE OIL FIRED BOILER WITH TWO OIL FIRED HOT WATER HEATERS. INSTALL TWO (2) OIL BURNERS ON TWO (2) OIL FIRED HOT WATER HEATERS. INSTALL WATER PIPING IN CELLAR FOR WATER HEATERS.
Q00690437-P1
09/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
09/06/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/11/2023
Permit issued — General Construction
Q00714426-I1-GC
02/21/2023
Permit issued — Plumbing
Q00690437-I1-PL
09/30/2022
Permit issued — Sprinklers
Q00166015-I1-PL
09/15/2022
Special inspection requirement — Sprinkler Systems
SIDERIS CARAMINTZOS
09/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SIDERIS CARAMINTZOS
07/26/2022
Objection resolved — Addressed
07/22/2022
Permit issued — Sprinklers
Q00166015-I1-EW-SP
07/19/2022
Objection raised — Other
07/15/2022
Filed — Alteration
PROPOSED TO INSTALL SPRINKLERS SYSTEM FOR CLOTHES COMMERCIAL GAS DRYER AT EXISTING, UNDER CO # 14928, LAUNDROMAT, RESOLVE ECB VIOLATIONS # 35116059R AND ITS ASSOCIATED DOB VIOLATION, INSTALL TWO RPZ AND BRING IN A NEW 2" FIRE SERVICE TO ACCOMODATE THE 10 SPRINKLER HEADS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
Q00166015-P1
05/11/2022
Permit issued — General Construction
Q00714426-I1-GC
05/03/2022
Filed — Alteration
INSTALL CHIMNEY LINER IN EXISTING MASONRY CHIMNEY
Q00714426-I1
04/07/2022
Special inspection requirement — Chimneys and vents
LOUIS ARENA
04/07/2022
Special inspection requirement — Final
LOUIS ARENA
04/07/2022
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
03/17/2022
Filed — Alteration
REPLACE OIL FIRED BOILER WITH TWO OIL FIRED HOT WATER HEATERS. INSTALL TWO (2) OIL BURNERS ON TWO (2) OIL FIRED HOT WATER HEATERS. INSTALL WATER PIPING IN CELLAR FOR WATER HEATERS.
Q00690437-I1
03/17/2022
Permit issued — Plumbing
Q00690437-I1-PL
01/16/2022
Permit issued — Plumbing
Q00166015-I1-EW-SP
01/11/2021
Permit issued — Sprinklers
Q00166015-I1-PL
01/24/2020
Permit issued — Plumbing
Q00166015-I1-PL
11/22/2019
Permit issued — Sprinklers
Q00166015-I1-EW-SP
11/08/2019
Permit issued — Sprinklers
Q00166015-I1-PL
07/29/2019
Filed — Alteration
PROPOSED TO INSTALL SPRINKLERS SYSTEM FOR CLOTHES COMMERCIAL GAS DRYER AT EXISTING, UNDER CO # 14928, LAUNDROMAT, RESOLVE ECB VIOLATIONS # 35116059R AND ITS ASSOCIATED DOB VIOLATION, INSTALL TWO RPZ AND BRING IN A NEW 2" FIRE SERVICE TO ACCOMODATE THE 10 SPRINKLER HEADS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
Q00166015-I1
10/19/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/22/2016
Violation issued (ECB, closed)
Plumbing
09/09/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/08/2015
Violation issued (ECB, closed)
Construction
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/30/2026$1.1M—Private party → 33-14 23 AVE LLC$1,065/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TERRAFORM ARCHITECTURE PLLC106/22/2026
NEW YORK ENGINEERING ASSOC., P.C.309/18/2023
ADS&Y INC.207/15/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NULITE FUEL OIL CO., LTDGeneral Contractor507/08/2026
ANESIS SERVICES CORPFire Protection407/08/2026
AQUEDUCT MECHANICAL CORPPlumbing307/08/2026
GENESIS PLBG AND HTG CORPPlumbing307/08/2026
NULITE FUEL OIL CO LTDPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851309/18/2023
ADS & Y INC3783307/15/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offAQUEDUCT MECHANICAL CORP11/07/2025
DOB NOWSprinklersSigned-offAQUEDUCT MECHANICAL CORP09/10/2024
DOB NOWGeneral ConstructionSigned-offNULITE FUEL OIL CO., LTD03/27/2024
DOB NOWPlumbingSigned-offNULITE FUEL OIL CO LTD01/22/2024
DOB NOWSprinklersSigned-offTHOMAS FAY11/02/2023
DOB NOWGeneral ConstructionSigned-offNULITE FUEL OIL CO., LTD04/11/2023
DOB NOWPlumbingSigned-offNULITE FUEL OIL CO LTD02/21/2023
DOB NOWSprinklersSigned-offAQUEDUCT MECHANICAL CORP09/30/2022
DOB NOWSprinklersSigned-offTHOMAS FAY07/22/2022
DOB NOWGeneral ConstructionSigned-offNULITE FUEL OIL CO., LTD05/11/2022
DOB NOWPlumbingSigned-offNULITE FUEL OIL CO LTD03/17/2022
DOB NOWPlumbingSigned-offTHOMAS FAY01/16/2022
DOB NOWSprinklersSigned-offGENESIS PLBG AND HTG CORP01/11/2021
DOB NOWPlumbingSigned-offGENESIS PLBG AND HTG CORP01/24/2020
DOB NOWSprinklersSigned-offTHOMAS FAY11/22/2019
DOB NOWSprinklersSigned-offGENESIS PLBG AND HTG CORP11/08/2019
BISPLISSUEDDOUG'S PLBG & HTG SERV CO02/02/2018
BISPLISSUEDPLUMBING & HTG DOCTOR INC06/15/2016
BISFBISSUEDGLOBE FUEL OIL CO02/18/1994
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/06/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
06/05/2026Structural Steel - Details—special
06/05/2026Fire-Resistant Penetrations and Joints—special
06/05/2026FinalEMANUEL KAMBANISprogress
06/05/2026Structural Stability – Alterations of existing buildings—special
09/19/2023Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
09/19/2023HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
09/06/2023Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
09/06/2023HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
09/15/2022Sprinkler SystemsSIDERIS CARAMINTZOSspecial
09/15/2022Fire-Resistant Penetrations and JointsSIDERIS CARAMINTZOSspecial
04/07/2022Chimneys and ventsLOUIS ARENAspecial
04/07/2022FinalLOUIS ARENAprogress
04/07/2022Energy Code Compliance InspectionsLOUIS ARENAprogress
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch4
08/26/2026Q00714426-I1Request digital key ↗
08/24/2026Q00690437-P1Request digital key ↗
08/24/2026Q00690437-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
08/26/2026Q00166015-I1Request digital key ↗
08/15/2026Q00166015-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/26/2026Q00166015-I1Request digital key ↗
08/15/2026Q00166015-P1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
09/29/2017421238903Open ↗
11/25/2015421238903Open ↗
▸BISWORK PERMIT APPLICATION2
02/14/2018421238903Open ↗
06/16/2016421238903Open ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/16/2026Q01412961-I1Open ↗
08/13/2026Q00714426-I1Open ↗
08/13/2026Q00166015-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/30/2026Q00166015-I1Open ↗
08/30/2026Q00166015-I1Open ↗
08/28/2026Q00690437-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/28/2026Q01412961-I1Open ↗
08/28/2026Q00690437-I1Open ↗
08/26/2026Q00714426-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
06/16/2016421238903Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
09/29/2017421238903Open ↗
11/25/2015421238903Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/15/2026Q01412961-I1Open ↗
08/13/2026Q00166015-P1Open ↗
08/13/2026Q00166015-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/25/2015421238903Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00690437-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
11/25/2015421238903Open ↗
▸BISSUPERSEDING LETTER1
02/14/2018421238903Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
10/03/2017421238903Open ↗
11/25/2015421238903Open ↗
▸DOB NOWPW3: Cost Affidavit (Before Sign Off)1
08/13/2026Q00166015-I1Open ↗
▸Filing & Intake Forms2
▸BISBOROUGH INTAKE FORM1
09/29/2017421238903Open ↗
▸BISEFILING COVER SHEET1
11/25/2015421238903Open ↗