← Back
Two family brick
23-63 24 STREET
QUEENS · BIN 4018771
💬 Discuss this project
1925Year Built
2Stories
B1Building Class
R5BZoning
2,600 sfGross Floor Area
2Units
0 Open Violations
Two family brick · Owner of record: 23-63 24 ST LLC · 2,400 sf lot · 1.08 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 22p · 1 filing · 8 docs
Floor 1
1 job · most recent 03/27/2024
Gas Water/Sanitary
FiledStatusContractorScope
03/27/2024Signed-offGO PRO PLUMBING AND HEATIGas, Water/Sanitary
Building Lifecycle
All (11)Filed (2)Permit Issued (1)Violation (1)Inspection (5)Special Inspection (2)
05/07/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/26/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VALENTINO POMPEO
03/27/2024
Filed — Alteration
PLUMBING APPLICATION FILED FOR NEW GAS PIPING FOR EXISTING GAS FIXTURES AND NEW STACKED WASHER/ GAS DRYER AND NEW GAS RANGE AT 2ND FLOOR IN EXISTING 2 STORY, 2 FAMILY BUILDING. ALL WORK IS AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, BULK, OCCUPANCY
Q00957919-P1
03/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VALENTINO POMPEO
02/28/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/31/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/31/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/16/2024
Permit issued — Plumbing
Q00957919-I1-PL
11/10/2023
Filed — Alteration
PLUMBING APPLICATION FILED FOR NEW GAS PIPING FOR EXISTING GAS FIXTURES AND NEW STACKED WASHER/ GAS DRYER AND NEW GAS RANGE AT 2ND FLOOR IN EXISTING 2 STORY, 2 FAMILY BUILDING. ALL WORK IS AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, BULK, OCCUPANCY
Q00957919-I1
07/27/2019
Violation issued (ECB, closed)
Construction
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
23-63 24 ST607/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VALENTINO POMPEO ARCHITECT, P.C.203/27/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GO PRO PLUMBING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VALENTINO POMPEO ARCHITEC1013203/27/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offGO PRO PLUMBING AND HEATI01/16/2024
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/07/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/28/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/31/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/31/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
04/08/2024Fire-Resistant Penetrations and JointsVALENTINO POMPEOspecial
03/18/2024Fire-Resistant Penetrations and JointsVALENTINO POMPEOspecial
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026Q00957919-P1Request digital key ↗
08/23/2026Q00957919-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/23/2026Q00957919-P1Open ↗
08/23/2026Q00957919-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/25/2026Q00957919-P1Open ↗
08/29/2026Q00957919-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026Q00957919-I1Open ↗
08/23/2026Q00957919-P1Open ↗