← Back
One family attached or semi-detached
22-65 21 STREET
QUEENS · BIN 4019484
💬 Discuss this project
1920Year Built
2Stories
A5Building Class
R5BZoning
1,364 sfGross Floor Area
1Units
One family attached or semi-detached · Owner of record: NORMA MARDACH 2018 IRRV INCOME ONLY TRUS T · 2,000 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DAVI ARCHITECTURE, PC709/18/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J AND R CAMPO CONSTR INCGeneral Contractor807/08/2026
A.D.S. PLBG AND HTG INCPlumbing207/08/2026
H-BUILDER INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DAVI ARCHITECTURE, PC5168609/18/2024
C.M. TESTING LABORATORY,1352206/11/2024
Building Lifecycle
All (85)Filed (7)Permit Issued (9)Signed Off (3)Inspection (4)Objection (32)Special Inspection (30)
06/17/2025
Signed off — Alteration
General interior renovation and proposed enlargement at 1st floor
Q00679613-I1
09/19/2024
Signed off — Alteration
General interior renovation and proposed enlargement at 1st floor
Q00679613-S1
09/19/2024
Special inspection requirement — Mechanical Systems
Benedetto Davi
09/19/2024
Special inspection requirement — Heating Systems
Benedetto Davi
09/19/2024
Special inspection requirement — Final
Benedetto Davi
09/19/2024
Special inspection requirement — Energy Code Compliance Inspections
Benedetto Davi
09/19/2024
Special inspection requirement — Maintenance information
Benedetto Davi
09/19/2024
Special inspection requirement — HVAC-R and service water heating system controls
Benedetto Davi
09/19/2024
Special inspection requirement — HVAC-R and service water heating equipment
Benedetto Davi
09/19/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Benedetto Davi
09/18/2024
Filed — Alteration
General interior renovation and proposed enlargement at 1st floor
Q00679613-P2
08/16/2024
Special inspection requirement — Lighting controls
Benedetto Davi
08/16/2024
Special inspection requirement — Masonry
Benedetto Davi
08/16/2024
Special inspection requirement — Concrete - Cast-In-Place
Benedetto Davi
08/16/2024
Special inspection requirement — Structural Cold-Formed Steel
JOHN SEMIOLI
08/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benedetto Davi
08/16/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Benedetto Davi
08/16/2024
Special inspection requirement — Structural Steel - Details
JOHN SEMIOLI
08/16/2024
Special inspection requirement — Final
Benedetto Davi
08/16/2024
Special inspection requirement — Energy Code Compliance Inspections
Benedetto Davi
08/16/2024
Special inspection requirement — Fenestration areas
Benedetto Davi
08/16/2024
Special inspection requirement — Insulation placement and R values
Benedetto Davi
08/16/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Benedetto Davi
08/16/2024
Special inspection requirement — Lighting in dwelling units
Benedetto Davi
08/13/2024
Objection resolved — Addressed
08/13/2024
Special inspection requirement — Energy Code Compliance Inspections
Benedetto Davi
08/10/2024
Special inspection requirement — Heating Systems
Benedetto Davi
08/10/2024
Special inspection requirement — Mechanical Systems
Benedetto Davi
08/10/2024
Special inspection requirement — Energy Code Compliance Inspections
Benedetto Davi
08/10/2024
Special inspection requirement — Final
Benedetto Davi
08/10/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Benedetto Davi
08/10/2024
Special inspection requirement — Maintenance information
Benedetto Davi
08/10/2024
Special inspection requirement — HVAC-R and service water heating equipment
Benedetto Davi
08/10/2024
Special inspection requirement — HVAC-R and service water heating system controls
Benedetto Davi
06/20/2024
Objection resolved — Addressed
06/17/2024
Objection raised — Inspections
06/17/2024
Objection raised — Scope
06/12/2024
Signed off — Alteration
Install and replace plumbing fixtures as per plans filed herewith
Q00679614-I1
06/11/2024
Filed — Alteration
General interior renovation and proposed enlargement at 1st floor
Q00679613-P1
03/06/2024
Permit issued — General Construction
Q00679613-I1-GC-CX
03/05/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/22/2024
Permit issued — Mechanical Systems
Q00679613-S1-MS
02/20/2024
Filed — Alteration
Install and replace plumbing fixtures as per plans filed herewith
Q00679614-P1
02/15/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/02/2024
Permit issued — Plumbing
Q00679614-I1-PL
11/21/2023
Permit issued — Structural
Q00679613-I1-GC-CX
11/01/2023
Permit issued — Construction Fence
Q00774998-I1-FN
08/03/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/04/2023
Filed — Alteration
General interior renovation and proposed enlargement at 1st floor
Q00679613-S1
04/04/2023
Permit issued — General Construction
Q00679613-I1-GC-CX
12/13/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/21/2022
Permit issued — Plumbing
Q00679614-I1-PL
10/28/2022
Permit issued — General Construction
Q00679613-I1-GC-CX
10/24/2022
Permit issued — Construction Fence
Q00774998-I1-FN
09/22/2022
Objection raised — Inspections
09/22/2022
Objection resolved — Addressed
07/18/2022
Objection raised — Inspections
07/18/2022
Objection resolved — Addressed
07/18/2022
Objection raised — Scope
07/18/2022
Objection resolved — Addressed
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJ R CAMPO CONSTR03/06/2024
DOB NOWMechanical SystemsSigned-offH-BUILDER INC02/22/2024
DOB NOWPlumbingSigned-offA.D.S. PLBG AND HTG INC02/02/2024
DOB NOWStructuralSigned-offJ R CAMPO CONSTR11/21/2023
DOB NOWConstruction FencePermit IssuedJ R CAMPO CONSTR11/01/2023
DOB NOWGeneral ConstructionSigned-offJ R CAMPO CONSTR04/04/2023
DOB NOWPlumbingSigned-offA.D.S. PLBG AND HTG INC11/21/2022
DOB NOWGeneral ConstructionSigned-offJ R CAMPO CONSTR10/28/2022
DOB NOWConstruction FencePermit IssuedJ R CAMPO CONSTR10/24/2022
1 project · most recent 12/23/2022
General Wiring
FiledStatusContractorScope
12/23/2022CompleteA ELECTRICAL MAIN SVC INCGeneral Wiring
1 project · most recent 07/14/2022
Fence
FiledStatusContractorScope
07/14/2022Permit IssuedJ AND R CAMPO CONSTR INCFence
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/13/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
09/19/2024Mechanical SystemsBenedetto Davispecial
09/19/2024Heating SystemsBenedetto Davispecial
09/19/2024FinalBenedetto Daviprogress
09/19/2024Energy Code Compliance InspectionsBenedetto Daviprogress
09/19/2024Maintenance informationBenedetto Davienergy_progress
09/19/2024HVAC-R and service water heating system controlsBenedetto Davienergy_progress
09/19/2024HVAC-R and service water heating equipmentBenedetto Davienergy_progress
09/19/2024HVAC-R and service water piping design and insulationBenedetto Davienergy_progress
08/16/2024Lighting controlsBenedetto Davienergy_progress
08/16/2024MasonryBenedetto Davispecial
08/16/2024Concrete - Cast-In-PlaceBenedetto Davispecial
08/16/2024Structural Cold-Formed SteelJOHN SEMIOLIspecial
08/16/2024Fire-Resistant Penetrations and JointsBenedetto Davispecial
08/16/2024Structural Stability – Alterations of existing buildingsBenedetto Davispecial
08/16/2024Structural Steel - DetailsJOHN SEMIOLIspecial
08/16/2024FinalBenedetto Daviprogress
08/16/2024Energy Code Compliance InspectionsBenedetto Daviprogress
08/16/2024Fenestration areasBenedetto Davienergy_progress
08/16/2024Insulation placement and R valuesBenedetto Davienergy_progress
08/16/2024Fenestration and door U-factor and product ratingsBenedetto Davienergy_progress
08/16/2024Lighting in dwelling unitsBenedetto Davienergy_progress
08/13/2024Energy Code Compliance InspectionsBenedetto Daviprogress
08/10/2024Heating SystemsBenedetto Davispecial
08/10/2024Mechanical SystemsBenedetto Davispecial
08/10/2024Energy Code Compliance InspectionsBenedetto Daviprogress
Latest 25 of 44.
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/26/2026Q00679613-P2Request digital key ↗
08/26/2026Q00679613-S1Request digital key ↗
08/26/2026Q00679614-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWRestrictive Declaration/Easement 14
08/13/2026Q00679613-I1Open ↗
08/13/2026Q00679613-P1Open ↗
08/13/2026Q00679614-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00679613-P1Open ↗
08/13/2026Q00679613-I1Open ↗
▸Seals & Professional Certifications40
▸DOB NOWProgress Inspector Seal & Signature17
08/25/2026Q00679613-P2Open ↗
08/25/2026Q00679613-P2Open ↗
08/24/2026Q00679613-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/02/2026Q00679614-P1Open ↗
08/28/2026Q00679614-I1Open ↗
08/25/2026Q00679613-P2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/26/2026Q00679613-S1Open ↗
08/26/2026Q00679613-P1Open ↗
08/26/2026Q00679613-P2Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/26/2026Q00679613-S1Open ↗
08/15/2026Q00679614-I1Open ↗
08/14/2026Q00679613-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00679613-I1Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/13/2026Q00679613-P1Open ↗
08/13/2026Q00679613-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00679613-P1Open ↗
08/13/2026Q00679613-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q00679613-P1Open ↗
08/13/2026Q00679613-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026Q00679613-I1Open ↗