← Back
Three families
26-04 14 PLACE
QUEENS · BIN 4020569
💬 Discuss this project
1987Year Built
3Stories
C0Building Class
R5Zoning
2,952 sfGross Floor Area
3Units
Rent Stabilized0 Open Violations
Three families · Owner of record: PROAVLIO LLC · 2,397 sf lot · 1.23 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 314p · 1 filing · 20 docs
Floor 214p · 1 filing · 20 docs
Floor 114p · 1 filing · 20 docs
Cellar15p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PROAVLIO LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GEORGIOS G GEORGOPOULOS, R.A.506/06/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRODIGY CONSTRUCTION INCGeneral Contractor307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GEORGIOS G. GEORGOPOULOS,1192506/06/2024
Building Lifecycle
All (55)Filed (5)Permit Issued (2)Signed Off (2)Violation (3)Inspection (3)Objection (10)Special Inspection (30)
04/15/2026
Signed off — Alteration CO
Amend existing CofO to convert existing enclosed garage to an additional bedroom for existing first floor apartment and as shown on plans filed herewith. No change in building bulk.
Q07996789-I1
02/18/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Georgios Georgopoulos
06/18/2024
Special inspection requirement — Interior lighting power
Georgios Georgopoulos
06/18/2024
Special inspection requirement — Fenestration air leakage
Georgios Georgopoulos
06/18/2024
Special inspection requirement — Air barrier - visual inspection
Georgios Georgopoulos
06/18/2024
Special inspection requirement — Fenestration areas
Georgios Georgopoulos
06/18/2024
Special inspection requirement — Fire-Resistance Rated Construction
Georgios Georgopoulos
06/18/2024
Special inspection requirement — Energy Code Compliance Inspections
Georgios Georgopoulos
06/18/2024
Special inspection requirement — Masonry
Georgios Georgopoulos
06/06/2024
Filed — Alteration CO
Amend existing CofO to convert existing enclosed garage to an additional bedroom for existing first floor apartment and as shown on plans filed herewith. No change in building bulk.
Q07996789-P3
06/03/2024
Special inspection requirement — Fenestration air leakage
Georgios Georgopoulos
06/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Georgios Georgopoulos
06/03/2024
Special inspection requirement — Masonry
Georgios Georgopoulos
06/03/2024
Special inspection requirement — Energy Code Compliance Inspections
Georgios Georgopoulos
06/03/2024
Special inspection requirement — Fire-Resistance Rated Construction
Georgios Georgopoulos
06/03/2024
Special inspection requirement — Interior lighting power
Georgios Georgopoulos
06/03/2024
Special inspection requirement — Air barrier - visual inspection
Georgios Georgopoulos
06/03/2024
Special inspection requirement — Fenestration areas
Georgios Georgopoulos
12/06/2023
Filed — Alteration CO
Amend existing CofO to convert existing enclosed garage to an additional bedroom for existing first floor apartment and as shown on plans filed herewith. No change in building bulk.
Q07996789-P2
11/17/2023
Special inspection requirement — Masonry
Georgios Georgopoulos
11/17/2023
Special inspection requirement — Fenestration areas
Georgios Georgopoulos
11/17/2023
Special inspection requirement — Fenestration air leakage
Georgios Georgopoulos
11/17/2023
Special inspection requirement — Air barrier - visual inspection
Georgios Georgopoulos
11/17/2023
Special inspection requirement — Interior lighting power
Georgios Georgopoulos
11/17/2023
Special inspection requirement — Energy Code Compliance Inspections
Georgios Georgopoulos
11/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Georgios Georgopoulos
11/17/2023
Special inspection requirement — Fire-Resistance Rated Construction
Georgios Georgopoulos
07/07/2023
Signed off — Alteration CO
Amend existing CofO to convert existing enclosed garage to an additional bedroom for existing first floor apartment and as shown on plans filed herewith. No change in building bulk.
Q07996789-S1
06/14/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/26/2023
Permit issued — Mechanical Systems
Q07996789-S1-MS
05/10/2023
Filed — Alteration CO
Amend existing CofO to convert existing enclosed garage to an additional bedroom for existing first floor apartment and as shown on plans filed herewith. No change in building bulk.
Q07996789-S1
05/09/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Georgios Georgopoulos
05/09/2023
Special inspection requirement — HVAC-R and service water heating system controls
Georgios Georgopoulos
05/09/2023
Special inspection requirement — HVAC-R and service water heating equipment
Georgios Georgopoulos
05/08/2023
Special inspection requirement — Final
Georgios Georgopoulos
05/08/2023
Special inspection requirement — Mechanical Systems
Georgios Georgopoulos
05/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Georgios Georgopoulos
04/27/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
04/18/2023
Objection resolved — Addressed
03/02/2023
Objection raised — Scope
02/23/2023
Filed — Alteration CO
Amend existing CofO to convert existing enclosed garage to an additional bedroom for existing first floor apartment and as shown on plans filed herewith. No change in building bulk.
Q07996789-P1
11/27/2022
Permit issued — General Construction
Q07996789-I1-GC
10/13/2022
Objection resolved — Addressed
10/11/2022
Objection raised — Other
10/03/2022
Objection resolved — Addressed
09/26/2022
Objection resolved — Addressed
09/22/2022
Objection resolved — Addressed
09/14/2022
Objection raised — Energy
09/14/2022
Objection raised — Zoning
09/14/2022
Objection raised — Admin
09/07/2022
Filed — Alteration CO
Amend existing CofO to convert existing enclosed garage to an additional bedroom for existing first floor apartment and as shown on plans filed herewith. No change in building bulk.
Q07996789-I1
03/08/2022
Violation issued (HPD, closed)
A
10/19/2015
Violation issued (HPD, closed)
I
03/03/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offPRODIGY CONSTRUCTION INC05/26/2023
DOB NOWGeneral ConstructionPermit IssuedPRODIGY CONSTRUCTION INC11/27/2022
BISOTISSUEDJN PAPPAS CONSTRUCTION CO12/19/2017
2 projects · most recent 12/27/2024
General Wiring
FiledStatusContractorScope
12/27/2024CompleteERIC & NG ELEC'L, INC.General Wiring
04/03/2023CompleteERIC & NG ELEC'L, INC.—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/18/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/14/2023Pass-Final CND-Occupancy InspectionPassView ↗
04/27/2023Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
06/18/2024Fire-Resistant Penetrations and JointsGeorgios Georgopoulosspecial
06/18/2024Interior lighting powerGeorgios Georgopoulosenergy_progress
06/18/2024Fenestration air leakageGeorgios Georgopoulosenergy_progress
06/18/2024Air barrier - visual inspectionGeorgios Georgopoulosenergy_progress
06/18/2024Fenestration areasGeorgios Georgopoulosenergy_progress
06/18/2024Fire-Resistance Rated ConstructionGeorgios Georgopoulosprogress
06/18/2024Energy Code Compliance InspectionsGeorgios Georgopoulosprogress
06/18/2024MasonryGeorgios Georgopoulosspecial
06/03/2024Fenestration air leakageGeorgios Georgopoulosenergy_progress
06/03/2024Fire-Resistant Penetrations and JointsGeorgios Georgopoulosspecial
06/03/2024MasonryGeorgios Georgopoulosspecial
06/03/2024Energy Code Compliance InspectionsGeorgios Georgopoulosprogress
06/03/2024Fire-Resistance Rated ConstructionGeorgios Georgopoulosprogress
06/03/2024Interior lighting powerGeorgios Georgopoulosenergy_progress
06/03/2024Air barrier - visual inspectionGeorgios Georgopoulosenergy_progress
06/03/2024Fenestration areasGeorgios Georgopoulosenergy_progress
11/17/2023MasonryGeorgios Georgopoulosspecial
11/17/2023Fenestration areasGeorgios Georgopoulosenergy_progress
11/17/2023Fenestration air leakageGeorgios Georgopoulosenergy_progress
11/17/2023Air barrier - visual inspectionGeorgios Georgopoulosenergy_progress
11/17/2023Interior lighting powerGeorgios Georgopoulosenergy_progress
11/17/2023Energy Code Compliance InspectionsGeorgios Georgopoulosprogress
11/17/2023Fire-Resistant Penetrations and JointsGeorgios Georgopoulosspecial
11/17/2023Fire-Resistance Rated ConstructionGeorgios Georgopoulosprogress
05/09/2023HVAC-R and service water piping design and insulationGeorgios Georgopoulosenergy_progress
Latest 25 of 30.
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026Q07996789-P3Request digital key ↗
08/25/2026Q07996789-S1Request digital key ↗
08/25/2026Q07996789-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
05/17/2018421197742Open ↗
12/21/2017421197742Open ↗
08/10/2015421197742Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
01/19/2019421197742Open ↗
▸BISWORK PERMIT APPLICATION1
12/21/2017421197742Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q07996789-I1Open ↗
▸Seals & Professional Certifications38
▸DOB NOWProgress Inspector Seal & Signature22
08/28/2026Q07996789-P3Open ↗
08/28/2026Q07996789-P2Open ↗
08/28/2026Q07996789-P2Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/28/2026Q07996789-P2Open ↗
08/28/2026Q07996789-P3Open ↗
08/28/2026Q07996789-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026Q07996789-I1Open ↗
08/25/2026Q07996789-P1Open ↗
08/25/2026Q07996789-S1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
01/19/2019421197742Open ↗
12/21/2017421197742Open ↗
08/10/2015421197742Open ↗
▸Trade Schedules & Equipment1
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
01/19/2019421197742Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/25/2026Q07996789-P3Open ↗
08/25/2026Q07996789-P2Open ↗
08/14/2026Q07996789-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/16/2016421197742Open ↗
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis2
08/14/2026Q07996789-I1Open ↗
08/13/2026Q07996789-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/19/2019421197742Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/10/2015421197742Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/19/2019421197742Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
01/19/2019421197742Open ↗
08/10/2015421197742Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
12/21/2017421197742Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
08/10/2015421197742Open ↗
▸BISADDITIONAL INFORMATION1
06/07/2018421197742Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification4
08/25/2026Q07996789-P3Open ↗
08/25/2026Q07996789-P2Open ↗
08/14/2026Q07996789-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026Q07996789-I1Open ↗