← Back
Two family converted from one family
24-16 83 STREET
QUEENS · BIN 4023950
💬 Discuss this project
1940Year Built
2Stories
B3Building Class
R4BZoning
—Gross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 0.94 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 12 docs
Cellar3p · 1 filing · 12 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
H G LEE ARCHITECT PC103/18/2025
Building Lifecycle
All (49)Filed (1)Violation (5)Objection (23)Special Inspection (20)
01/18/2026
Special inspection requirement — Maintenance information
01/12/2026
Objection resolved — Resolved
12/07/2025
Special inspection requirement — Electric vehicle service equipment requirements
11/06/2025
Objection raised — Energy
10/10/2025
Objection resolved — Addressed
09/28/2025
Objection resolved — Addressed
09/28/2025
Objection resolved — Addressed
09/28/2025
Objection resolved — Addressed
09/28/2025
Objection resolved — Addressed
09/26/2025
Objection raised — Cost
09/14/2025
Objection resolved — Addressed
09/14/2025
Objection resolved — Addressed
09/14/2025
Objection resolved — Addressed
09/14/2025
Objection resolved — Addressed
09/13/2025
Special inspection requirement — Interior lighting power
09/13/2025
Special inspection requirement — Energy Code Compliance Inspections
09/13/2025
Special inspection requirement — Metering
09/13/2025
Special inspection requirement — Permanent certificate
09/05/2025
Objection raised — Zoning
09/05/2025
Objection raised — Zoning
09/05/2025
Objection raised — Zoning
09/05/2025
Objection raised — Admin
09/05/2025
Objection raised — Structural
09/05/2025
Objection raised — Zoning
09/05/2025
Objection raised — Scope
09/05/2025
Objection raised — Zoning
07/10/2025
Objection resolved — Addressed
03/31/2025
Objection raised — Scope
03/31/2025
Objection raised — Zoning
03/18/2025
Filed — Alteration CO
APPLICATION HEREWITH FILED FOR A CHANGE IN CERTIFICATE OF OCCUPANCY 1.PROPOSED CONVERSION OF 1 TO 2 FAMILY WITH A HORIZONTAL EXTENSION AT REAR OF BUILDING. 2.PROPOSED INTERIOR RENOVATION ON ALL FLOORS. 3. REPLACE WINDOWS ON EXISTING FRONT FACADE.
Q01189665-I1
03/17/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
03/17/2025
Special inspection requirement — Subgrade Inspections
03/17/2025
Special inspection requirement — Structural Wood Frame
03/17/2025
Special inspection requirement — Fenestration areas
03/17/2025
Special inspection requirement — Insulation placement and R values
03/17/2025
Special inspection requirement — Air barrier - visual inspection
03/17/2025
Special inspection requirement — Fenestration air leakage
03/05/2025
Special inspection requirement — Masonry
03/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/04/2025
Special inspection requirement — Fire-Resistance Rated Construction
03/04/2025
Special inspection requirement — Final
03/04/2025
Special inspection requirement — Concrete - Cast-In-Place
03/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/04/2025
Special inspection requirement — Footing and Foundation
01/23/2025
Violation issued (ECB, closed)
Construction
01/23/2025
Violation issued (ECB, closed)
Construction
01/23/2025
Violation issued (ECB, closed)
Unknown
01/23/2025
Violation issued (ECB, closed)
Construction
11/03/1993
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDARIANA CONTRACTING INC04/22/1994
BISOTISSUEDDORIC CONSTR. GROUP INCTORS CORP01/13/1994
1 project · most recent 03/18/2025
Gas
FiledStatusContractorScope
03/18/2025——Gas
1 project · most recent 03/01/2025
General Wiring
FiledStatusContractorScope
03/01/2025Permit IssuedAZTECA LIGHTING & ELEC INGeneral Wiring
1 project · most recent 03/18/2025
Masonry
FiledStatusContractorScope
03/18/2025——Masonry
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
01/18/2026Maintenance information—energy_progress
12/07/2025Electric vehicle service equipment requirements—energy_progress
09/13/2025Interior lighting power—energy_progress
09/13/2025Energy Code Compliance Inspections—progress
09/13/2025Metering—energy_progress
09/13/2025Permanent certificate—energy_progress
03/17/2025Fenestration and door U-factor and product ratings—energy_progress
03/17/2025Subgrade Inspections—special
03/17/2025Structural Wood Frame—progress
03/17/2025Fenestration areas—energy_progress
03/17/2025Insulation placement and R values—energy_progress
03/17/2025Air barrier - visual inspection—energy_progress
03/17/2025Fenestration air leakage—energy_progress
03/05/2025Masonry—special
03/04/2025Fire-Resistant Penetrations and Joints—special
03/04/2025Fire-Resistance Rated Construction—progress
03/04/2025Final—progress
03/04/2025Concrete - Cast-In-Place—special
03/04/2025Structural Stability – Alterations of existing buildings—special
03/04/2025Footing and Foundation—progress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026Q01189665-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026Q01189665-I1Open ↗
08/13/2026Q01189665-S1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01189665-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01189665-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/20/2026Q01189665-S1Open ↗
08/20/2026Q01189665-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01189665-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/20/2026Q01189665-I1Open ↗
08/20/2026Q01189665-S1Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q01189665-I1Open ↗
▸Other Documents4
▸DOB NOWPlot Diagram1
08/13/2026Q01189665-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/20/2026Q01189665-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01189665-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01189665-I1Open ↗