← Back
Elevator cooperative
Impact Real Estate Management
34-49 81 STREET · BIN 4029199
💬 Discuss this project
1949Year Built
6Stories
D4Building Class
R7-1Zoning
90,000 sfGross Floor Area
126Units
LL97 CoveredRent Stabilized87 Open Violations 86 unresolved · 1 paperwork only ▸
Elevator cooperative · Owner of record: 81-05 TENANT5S LTD. · 31,000 sf lot · 2.9 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
925 UNION STREET TENANTS CORP.1107/08/2026
81-05 TENANT5 S LTD503/22/2026
81-05 TENANTS/ B.L. MANAG303/22/2026
B L MANAGEMENT203/22/2026
B.L. MANAGEMENT AGENT103/22/2026
81-05 TENANTS LTD. COOP203/22/2026
81-05 TENANTH LTD COOP HO103/22/2026
THE WOODSTOCK COOP C/O B.103/22/2026
81 05 TENANTS LTD103/22/2026
SHALLU CONSTRUCTION303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EVOLVE ARCHITECTURE STUDIO PLLC107/15/2026
NEW YORK ENGINEERING ASSOC., P.C.302/01/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BASS ELECTRICAL CORP.Electrical103/22/2026
CLEMENT CHAMBERSElectrical103/21/2026
COUNTY ELECL CONTRACTOR IElectrical103/22/2026
BAUER MECHANCIAL LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851302/01/2024
Building Lifecycle
All (82)Filed (4)Permit Issued (2)Violation (60)Inspection (2)Objection (2)Special Inspection (12)
08/17/2026
Objection resolved — Resolved
08/11/2026
Objection raised — Other
07/15/2026
Filed — Alteration
FILING A GC APPLICATION FOR APARTMENT 5Y TO RENOVATE, ENLARGE, AND RECONFIGURE ONE BATHROOM. REPLACE (2)PLUMBING FIXTURES, AND RELOCATE/REPLACE (1) PLUMBING FIXTURE AS PER PLANS. NO CHANGE TO USE, EGRESS OROCCUPANCY IS PROPOSED UNDER THIS APPLICATION.
Q01418045-I1
06/29/2026
Violation issued (HPD, open)
A
06/29/2026
Violation issued (HPD, open)
A
06/29/2026
Violation issued (HPD, open)
B
06/29/2026
Violation issued (HPD, open)
A
06/29/2026
Violation issued (HPD, open)
B
06/29/2026
Violation issued (HPD, open)
B
06/29/2026
Violation issued (HPD, open)
A
06/29/2026
Violation issued (HPD, open)
A
06/29/2026
Violation issued (HPD, open)
A
06/29/2026
Violation issued (HPD, open)
A
06/29/2026
Violation issued (HPD, open)
A
03/07/2026
Violation issued (HPD, closed)
A
03/07/2026
Violation issued (HPD, open)
B
03/07/2026
Violation issued (HPD, open)
B
03/07/2026
Violation issued (HPD, open)
B
03/07/2026
Violation issued (HPD, open)
B
03/07/2026
Violation issued (HPD, open)
B
03/07/2026
Violation issued (HPD, closed)
A
11/17/2025
Violation issued (HPD, open)
B
11/17/2025
Violation issued (HPD, closed)
A
11/17/2025
Violation issued (HPD, open)
B
11/17/2025
Violation issued (HPD, closed)
A
11/17/2025
Violation issued (HPD, closed)
C
11/17/2025
Violation issued (HPD, open)
B
08/12/2025
Violation issued (ECB, open)
Plumbing
06/11/2025
Violation issued (HPD, closed)
A
12/02/2024
Violation issued (HPD, closed)
I
08/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/15/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/01/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/08/2024
Permit issued — Plumbing
Q00943284-S1-PL
02/05/2024
Special inspection requirement — Tenant Protection Plan Compliance
02/05/2024
Special inspection requirement — Heating Systems
LOUIS ARENA
02/05/2024
Special inspection requirement — Maintenance information
LOUIS ARENA
02/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
02/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
02/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
02/01/2024
Filed — Alteration
Q00943284-P1
01/25/2024
Special inspection requirement — Heating Systems
LOUIS ARENA
01/25/2024
Special inspection requirement — Tenant Protection Plan Compliance
01/25/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
01/25/2024
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
01/25/2024
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
01/25/2024
Special inspection requirement — Maintenance information
LOUIS ARENA
12/27/2023
Violation issued (HPD, open)
C
11/14/2023
Permit issued — Boiler Equipment
Q00943284-I1-BE
11/06/2023
Filed — Alteration
Q00943284-S1
11/04/2023
Filed — Alteration
Q00943284-I1
11/03/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/25/2023
Violation issued (HPD, closed)
C
08/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/31/2023
Violation issued (HPD, open)
C
03/31/2023
Violation issued (HPD, open)
A
03/31/2023
Violation issued (HPD, open)
A
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMIDWOOD-RAFTERY PLBG &HTG02/08/2024
DOB NOWBoiler EquipmentSigned-offG. BAUER, INC11/14/2023
BISOTISSUEDGLENWOOD CONSTRUCTION COR10/17/2016
BISOTISSUEDGLENWOOD CONSTRUCTION COR05/26/2016
BISOTISSUEDSHALLU CONSTRUCTION CORP02/06/2014
3 projects · most recent 03/05/2025
General Wiring Boiler Controls
FiledStatusContractorScope
03/05/2025CompleteCOUNTY ELECL CONTRACTOR IBoiler Controls
06/12/2023CompleteBASS ELECTRICAL CORP.General Wiring
06/12/2023CompleteBASS ELECTRICAL CORP.General Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/01/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
02/05/2024Tenant Protection Plan Compliance—special
02/05/2024Heating SystemsLOUIS ARENAspecial
02/05/2024Maintenance informationLOUIS ARENAenergy_progress
02/05/2024HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
02/05/2024HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
02/05/2024HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
01/25/2024Heating SystemsLOUIS ARENAspecial
01/25/2024Tenant Protection Plan Compliance—special
01/25/2024HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
01/25/2024HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
01/25/2024HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
01/25/2024Maintenance informationLOUIS ARENAenergy_progress
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026Q00943284-S1Request digital key ↗
08/23/2026Q00943284-I1Request digital key ↗
08/23/2026Q00943284-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION3
10/21/2016440297466Open ↗
04/04/2016440297466Open ↗
02/10/2014420891495Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
04/04/2016440297466Open ↗
09/11/2013420891495Open ↗
▸DOB NOWLPC Approval/Permit1
08/16/2026Q01418045-I1Open ↗
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026Q00943284-I1Open ↗
08/23/2026Q00943284-S1Open ↗
08/23/2026Q00943284-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026Q00943284-I1Open ↗
08/23/2026Q00943284-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026Q00943284-I1Open ↗
08/23/2026Q00943284-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/04/2016440297466Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/11/2013420891495Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/04/2016440297466Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/11/2013420891495Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
09/11/2013420891495Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/04/2016440297466Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
04/04/2016440297466Open ↗
▸Environmental & Asbestos5
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
04/04/2016440297466Open ↗
01/07/2014420891495Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026Q00943284-S1Open ↗
08/16/2026Q01418045-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/23/2026Q00943284-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/04/2016440297466Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/11/2013420891495Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/04/2016440297466Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/04/2016440297466Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/07/2014420891495Open ↗
▸BISLANDMARKS APPROVAL1
04/04/2016440297466Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
04/04/2016440297466Open ↗
09/11/2013420891495Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
09/11/2013420891495Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/04/2016440297466Open ↗