| Firm | Filings | Most Recent |
|---|---|---|
| W CHAN ENGINEERING PC | 3 | 08/12/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/12/2026 | — | — | Air Conditioning Systems, Ventilation Systems | Cooling Mitsubishi Electric MXZ-3D24NL 30,600 BTU · Heat Pump Outdoor ×5 MXZ-4D30NL 36,000 BTU · Heat Pump Outdoor ×1 MXZ‐5C42NA3 45,000 BTU · Heat Pump Outdoor ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/12/2026 | — | — | 1 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/12/2026 | — | — | Fence |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/31/2026 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 07/31/2026 | Underpinning | — | special |
| 06/25/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 06/25/2026 | Fenestration air leakage | — | energy_progress |
| 06/25/2026 | Shutoff dampers | — | energy_progress |
| 06/25/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 06/25/2026 | Insulation placement and R values | — | energy_progress |
| 06/25/2026 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 06/25/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 06/25/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 06/25/2026 | Air barrier - visual inspection | — | energy_progress |
| 06/25/2026 | Fenestration areas | — | energy_progress |
| 03/30/2026 | Final | — | progress |
| 03/30/2026 | Mechanical Systems | — | special |
| 03/30/2026 | Structural Stability – Alterations of existing buildings | — | special |