← Back
Primarily 3 family with 1 store or office
53-07 ROOSEVELT AVENUE
QUEENS · BIN 4030807
💬 Discuss this project
1920Year Built
3Stories
S3Building Class
R6Zoning
2,843 sfGross Floor Area
4Units
Rent Stabilized11 Open Violations 10 unresolved · 1 paperwork only ▸
Primarily 3 family with 1 store or office · Owner of record: 5307 ROOSEVELT, LLC · 1,406 sf lot · 2.02 FAR built · Flood zone X
Locations of Work
Mechanical
Cellar1p · 1 filing · 9 docs
1 job · most recent 11/18/2019
General Wiring
FiledStatusContractorScope
11/18/2019CompleteACCURATE ELEC'L CORP.General Wiring
Building Lifecycle
All (48)Filed (5)Permit Issued (4)Signed Off (3)Violation (17)Inspection (4)Special Inspection (15)
01/22/2026
Signed off — Alteration
APPLICATION FILED TO INSTALL NEW TYPE I KITCHEN HOOD ON 1ST FLOOR,ROOFTOP EXHAUST FAN, MAKE-UP AIR UNIT AND DUCTWORK, AND SPLIT AC SYSTEM AS PER PLANS. FIRE SUPPRESSION SYSTEM FILED SEPARATELYWITH THE FDNY. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Q01112324-I1
11/24/2025
Signed off — Alteration
APPLICATION FILED TO INSTALL NEW TYPE I KITCHEN HOOD ON 1ST FLOOR,ROOFTOP EXHAUST FAN, MAKE-UP AIR UNIT AND DUCTWORK, AND SPLIT AC SYSTEM AS PER PLANS. FIRE SUPPRESSION SYSTEM FILED SEPARATELYWITH THE FDNY. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Q01112324-S1
11/24/2025
Signed off — Alteration
APPLICATION FILED TO INSTALL NEW TYPE I KITCHEN HOOD ON 1ST FLOOR,ROOFTOP EXHAUST FAN, MAKE-UP AIR UNIT AND DUCTWORK, AND SPLIT AC SYSTEM AS PER PLANS. FIRE SUPPRESSION SYSTEM FILED SEPARATELYWITH THE FDNY. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Q01112324-S2
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/16/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/12/2025
Filed — Alteration
APPLICATION FILED TO INSTALL NEW TYPE I KITCHEN HOOD ON 1ST FLOOR,ROOFTOP EXHAUST FAN, MAKE-UP AIR UNIT AND DUCTWORK, AND SPLIT AC SYSTEM AS PER PLANS. FIRE SUPPRESSION SYSTEM FILED SEPARATELYWITH THE FDNY. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Q01112324-P1
09/09/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/18/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/13/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
SOHAIL HUMAYUN
08/12/2025
Special inspection requirement — Mechanical Systems
SOHAIL HUMAYUN
08/12/2025
Special inspection requirement — Energy Code Compliance Inspections
SOHAIL HUMAYUN
08/12/2025
Special inspection requirement — Final
SOHAIL HUMAYUN
08/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
SOHAIL HUMAYUN
08/12/2025
Special inspection requirement — Ventilation and air distribution system
SOHAIL HUMAYUN
08/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SOHAIL HUMAYUN
06/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/09/2025
Violation issued (ECB, open)
Construction
04/30/2025
Permit issued — General Construction
Q01112324-I1-GC
03/24/2025
Permit issued — Plumbing
Q01112324-S1-PL
12/20/2024
Permit issued — Mechanical Systems
Q01112324-S2-MS
11/24/2024
Filed — Alteration
APPLICATION FILED TO INSTALL NEW TYPE I KITCHEN HOOD ON 1ST FLOOR,ROOFTOP EXHAUST FAN, MAKE-UP AIR UNIT AND DUCTWORK, AND SPLIT AC SYSTEM AS PER PLANS. FIRE SUPPRESSION SYSTEM FILED SEPARATELYWITH THE FDNY. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Q01112324-S1
11/04/2024
Filed — Alteration
APPLICATION FILED TO INSTALL NEW TYPE I KITCHEN HOOD ON 1ST FLOOR,ROOFTOP EXHAUST FAN, MAKE-UP AIR UNIT AND DUCTWORK, AND SPLIT AC SYSTEM AS PER PLANS. FIRE SUPPRESSION SYSTEM FILED SEPARATELYWITH THE FDNY. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Q01112324-S2
09/22/2024
Filed — Alteration
APPLICATION FILED TO INSTALL NEW TYPE I KITCHEN HOOD ON 1ST FLOOR,ROOFTOP EXHAUST FAN, MAKE-UP AIR UNIT AND DUCTWORK, AND SPLIT AC SYSTEM AS PER PLANS. FIRE SUPPRESSION SYSTEM FILED SEPARATELYWITH THE FDNY. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Q01112324-I1
09/16/2024
Special inspection requirement — Energy Code Compliance Inspections
SOHAIL HUMAYUN
09/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOHAIL HUMAYUN
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/06/2023
Violation issued (ECB, closed)
Zoning
03/06/2023
Violation issued (ECB, open)
Construction
03/08/2022
Violation issued (HPD, closed)
A
10/23/2019
Permit issued — Boiler Equipment
Q00238159-I1-BE
10/14/2019
Filed — Alteration
Replacement of existing gas fired heating boiler with new boiler. Connected to existing gas service meter and new gas piping
Q00238159-I1
10/01/2019
Special inspection requirement — Heating Systems
JOSEPH BOTTA
10/01/2019
Special inspection requirement — HVAC and service water heating system controls
JOSEPH BOTTA
10/01/2019
Special inspection requirement — HVAC and service water heating equipment
JOSEPH BOTTA
10/01/2019
Special inspection requirement — Maintenance information
JOSEPH BOTTA
10/01/2019
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH BOTTA
09/19/2019
Violation issued (ECB, closed)
Boilers
10/24/2018
Violation issued (HPD, closed)
I
11/22/2016
Violation issued (HPD, closed)
I
10/16/2015
Violation issued (HPD, closed)
I
12/13/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/27/2001
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/04/1998
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/29/1995
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/07/1994
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ANGEL CONSTRUCTION C807/08/2026
ANGEL DEVELOPMENT INC DBA ANGEL CON303/22/2026
5307 ROOSEVELT, LLC603/22/2026
GUADALUPE GROCERY INC.103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOHAIL HUMAYUN P E INC409/12/2025
JOSEPH BOTTA, PE, PC110/14/2019
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DIRNO CORPORATIONGeneral Contractor104/09/2026
F A M BUILDERS LLCGeneral Contractor107/08/2026
MARATHON MECHANICAL LLCPlumbing107/08/2026
TT MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOHAIL HUMAYUN P E INC8457409/12/2025
SD TESTING & INSPECTION S7010109/22/2024
JOSEPH BOTTA, PE, PC1139110/14/2019
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offF A M BUILDERS04/30/2025
DOB NOWPlumbingSigned-offTT MECHANICAL CORP03/24/2025
DOB NOWMechanical SystemsSigned-offDIRNO CORPORATION12/20/2024
DOB NOWBoiler EquipmentPermit IssuedMARATHON MECHANICAL LLC10/23/2019
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/16/2025Pass-Final General Construction Non-Directive 14PassView ↗
09/09/2025Fail-Final General Construction Non-Directive 14FailView ↗
08/18/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
08/13/2025Tenant Protection Plan Compliance—special
08/12/2025HVAC-R and service water heating system controlsSOHAIL HUMAYUNenergy_progress
08/12/2025Mechanical SystemsSOHAIL HUMAYUNspecial
08/12/2025Energy Code Compliance InspectionsSOHAIL HUMAYUNprogress
08/12/2025FinalSOHAIL HUMAYUNprogress
08/12/2025HVAC-R and service water heating equipmentSOHAIL HUMAYUNenergy_progress
08/12/2025Ventilation and air distribution systemSOHAIL HUMAYUNenergy_progress
08/12/2025HVAC-R and service water piping design and insulationSOHAIL HUMAYUNenergy_progress
09/16/2024Energy Code Compliance InspectionsSOHAIL HUMAYUNprogress
09/16/2024Fire-Resistant Penetrations and JointsSOHAIL HUMAYUNspecial
10/01/2019Heating SystemsJOSEPH BOTTAspecial
10/01/2019HVAC and service water heating system controls JOSEPH BOTTAenergy_progress
10/01/2019HVAC and service water heating equipment JOSEPH BOTTAenergy_progress
10/01/2019Maintenance informationJOSEPH BOTTAenergy_progress
10/01/2019Fire-Resistant Penetrations and JointsJOSEPH BOTTAspecial
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch4
08/18/2026Q01112324-S1Request digital key ↗
08/18/2026Q01112324-S2Request digital key ↗
08/18/2026Q01112324-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment1
08/28/2026Q00238159-I1Request digital key ↗
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature10
09/23/2026Q00238159-I1Open ↗
09/23/2026Q00238159-I1Open ↗
09/23/2026Q00238159-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/13/2026Q01112324-S1Open ↗
08/13/2026Q00238159-I1Open ↗
08/13/2026Q01112324-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026Q00238159-I1Open ↗
09/23/2026Q00238159-I1Open ↗
09/01/2026Q01112324-S1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026Q00238159-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/13/2026Q01112324-S1Open ↗
08/13/2026Q00238159-I1Open ↗
08/13/2026Q01112324-I1Open ↗
Showing 3 of 5 on file for this type