ECB08/06/2025OBSERVED ONE STORY HORIZONTAL AND VERTICAL ALUMINUM STRUCTURE WITH MULTIPLE WINDOWS BUILT ON THE SECOND FLOOR OF THE EXISTING BUILDING AT EXPOSURE #3. NO PERMIT FOR THIS WORK AT THE TIME OF INSPECTION., OBTAINHearing held — result not yet published$2K proposed
ECB05/16/2025WORK WITHOUT PERMIT: AT TIME OF INSPECTION OBSERVED A ONE STORY HORIZONTAL AND VERTICAL ALUMINUM STRUCTURE WITH MULTIPLE WINDOWS BUILT ON THE SECOND FLOOR OF THE EXISTING BUILDING AT EXOP # 3 THE WORK IS 100% CNothing owed — awaiting certificate of correction
One story - permanent living quarter · 2,100 sf lot · 0.77 FAR built · Flood zone X
WE PROPOSE TO REMOVE THE EXISTING 2ND STORY METAL EXTENSION. FILING TO RESOLVE ECB VIOLATION 39148256H, THERE WILL BE NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.