← Back
Two stories - detached, small or mid-size
33-24 86 STREET
QUEENS · BIN 4035205
💬 Discuss this project
1940Year Built
2.75Stories
A1Building Class
R5Zoning
—Gross Floor Area
1Units
Two stories - detached, small or mid-size · 0.71 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 3Under Construction5p · 1 filing · 20 docs
Floor 2Under Construction3p · 1 filing · 20 docs
Floor 1Under Construction3p · 1 filing · 20 docs
CellarUnder Construction8p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
INNOSPARK DESIGN409/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AARON MCDONALD ARCHITECT408/07/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILDWISE CONSTRUCTION GRGeneral Contractor106/07/2026
W.R. PLBG AND HTG CORPPlumbing106/07/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AARON MCDONALD ARCHITECT5118408/07/2026
Building Lifecycle
All (31)Filed (4)Permit Issued (2)Inspection (4)Special Inspection (21)
08/07/2026
Filed — Alteration
INSTALL NEW BOILER AND PLUMBING FIXTURES IN THE EXISTING 3 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q01407944-P3
08/07/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Aaron McDonald
08/07/2026
Special inspection requirement — Energy Code Compliance Inspections
Aaron McDonald
08/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
Aaron McDonald
08/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Aaron McDonald
08/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
Aaron McDonald
08/04/2026
Filed — Alteration
INSTALL NEW BOILER AND PLUMBING FIXTURES IN THE EXISTING 3 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q01407944-P2
08/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Aaron McDonald
08/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Aaron McDonald
08/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
Aaron McDonald
08/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Aaron McDonald
08/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
Aaron McDonald
07/24/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/21/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/05/2026
Permit issued — Plumbing
Q01407944-S1-PL
06/05/2026
Permit issued — Mechanical Systems
Q01407944-I1-GC-CX
06/03/2026
Filed — Alteration
INSTALL NEW BOILER AND PLUMBING FIXTURES IN THE EXISTING 3 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q01407944-S1
06/02/2026
Filed — Alteration
INSTALL NEW BOILER AND PLUMBING FIXTURES IN THE EXISTING 3 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q01407944-I1
06/02/2026
Special inspection requirement — Permanent certificate
Aaron McDonald
06/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Aaron McDonald
06/02/2026
Special inspection requirement — Interior lighting power
Aaron McDonald
06/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Aaron McDonald
06/02/2026
Special inspection requirement — Energy Code Compliance Inspections
Aaron McDonald
06/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
Aaron McDonald
06/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
Aaron McDonald
06/02/2026
Special inspection requirement — Insulation placement and R values
Aaron McDonald
06/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
Aaron McDonald
05/27/2026
Special inspection requirement — Final
Aaron McDonald
05/27/2026
Special inspection requirement — Mechanical Systems
Aaron McDonald
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedW.R. PLBG AND HTG CORP06/05/2026
DOB NOWMechanical SystemsPermit IssuedBUILDWISE CONSTRUCTION GR06/05/2026
BISOTISSUEDKAMTECH RESTORATION CORP03/03/2022
1 project · most recent 08/07/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/07/2026Permit IssuedBUILDWISE CONSTRUCTION GRAir Conditioning Systems
1 project · most recent 08/07/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/07/2026Permit IssuedW.R. PLBG AND HTG CORPGas, Water/Sanitary
3 projects · most recent 07/01/2026
General Wiring
FiledStatusContractorScope
07/01/2026Permit IssuedKJK ELECTRIC INCGeneral Wiring
04/08/2022CompleteBERGER QUALITY ELEC'L CON—
04/06/2022CompleteBERGER QUALITY ELEC'L CON1 meters
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/07/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/24/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/21/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/10/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
08/07/2026Fire-Resistant Penetrations and JointsAaron McDonaldspecial
08/07/2026Energy Code Compliance InspectionsAaron McDonaldprogress
08/07/2026HVAC-R and service water heating equipmentAaron McDonaldenergy_progress
08/07/2026HVAC-R and service water piping design and insulationAaron McDonaldenergy_progress
08/07/2026HVAC-R and service water heating system controlsAaron McDonaldenergy_progress
08/04/2026Fire-Resistant Penetrations and JointsAaron McDonaldspecial
08/04/2026Energy Code Compliance InspectionsAaron McDonaldprogress
08/04/2026HVAC-R and service water heating system controlsAaron McDonaldenergy_progress
08/04/2026HVAC-R and service water piping design and insulationAaron McDonaldenergy_progress
08/04/2026HVAC-R and service water heating equipmentAaron McDonaldenergy_progress
06/02/2026Permanent certificateAaron McDonaldenergy_progress
06/02/2026Fire-Resistant Penetrations and JointsAaron McDonaldspecial
06/02/2026Interior lighting powerAaron McDonaldenergy_progress
06/02/2026HVAC-R and service water piping design and insulationAaron McDonaldenergy_progress
06/02/2026Energy Code Compliance InspectionsAaron McDonaldprogress
06/02/2026Fire-Resistance Rated ConstructionAaron McDonaldprogress
06/02/2026HVAC-R and service water heating system controlsAaron McDonaldenergy_progress
06/02/2026Insulation placement and R valuesAaron McDonaldenergy_progress
06/02/2026HVAC-R and service water heating equipmentAaron McDonaldenergy_progress
05/27/2026FinalAaron McDonaldprogress
05/27/2026Mechanical SystemsAaron McDonaldspecial
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/16/2026Q01407944-P2Request digital key ↗
08/16/2026Q01407944-I1Request digital key ↗
08/16/2026Q01407944-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
10/05/2022440706461Open ↗
03/01/2022440706461Open ↗
▸BISWORK PERMIT APPLICATION1
03/03/2022440706461Open ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026Q01407944-I1Open ↗
09/01/2026Q01407944-I1Open ↗
09/01/2026Q01407944-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/16/2026Q01407944-P2Open ↗
08/16/2026Q01407944-P3Open ↗
08/16/2026Q01407944-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q01407944-I1Open ↗
09/01/2026Q01407944-P3Open ↗
08/24/2026Q01407944-P1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
03/01/2022440706461Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
03/01/2022440706461Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/16/2026Q01407944-P3Open ↗
08/16/2026Q01407944-P2Open ↗
08/16/2026Q01407944-P1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/01/2022440706461Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
12/05/2023440706461Open ↗
03/01/2022440706461Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/05/2023440706461Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
03/01/2022440706461Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
12/05/2023440706461Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
12/05/2023440706461Open ↗
03/01/2022440706461Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/06/2023440706461Open ↗
▸BISFINAL ELECTRICAL SIGNOFF1
12/06/2023440706461Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/05/2023440706461Open ↗
03/01/2022440706461Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION3
09/05/2023440706461Open ↗
08/22/2023440706461Open ↗
03/16/2023440706461Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/01/2022440706461Open ↗
▸Other Documents1
▸BISTax Abatement Miscellaneous1
12/06/2023440706461Open ↗