← Back
Elevator apt, semi-fireproof without stores
86-19 ELMHURST AVENUE
QUEENS · BIN 4037465
💬 Discuss this project
1964Year Built
6Stories
D1Building Class
R5Zoning
23,200 sfGross Floor Area
38Units
Rent Stabilized11 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: VENUS APARTMENTS, LLC · 4,750 sf lot · 4.88 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MNK ENTERPRISES607/08/2026
WERBER MANAGEMENT707/08/2026
VENUS APARTMENTS903/22/2026
MNK ENTERPRISES NY103/22/2026
WERBER 1996 GRANDCHILD TR103/22/2026
WEBER MGMT LLC / VENUS AP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SCOPE ENGINEERING CONSULTANTS PC107/16/2022
ENTHINK ENGINEERS LLC102/15/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KNS BUILDING RESTORATION INC.203/21/2026
ANZALONE ARCHITECTURE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KNS BUILDING REST. INCGeneral Contractor207/08/2026
MNK ENTERPRISES LLCGeneral Contractor207/08/2026
MNK ENTERPRISES NY INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SCOPE ENGINEERING CONSULT7894107/16/2022
Building Lifecycle
All (97)Filed (3)Permit Issued (6)Signed Off (2)Facade (FISP) (21)Violation (60)Objection (2)Special Inspection (3)
07/22/2026
Violation issued (HPD, closed)
C
07/22/2026
Violation issued (HPD, open)
C
06/26/2025
Violation issued (HPD, closed)
C
05/12/2025
Violation issued (ECB, closed)
Elevators
04/04/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q00680663-I1
11/14/2024
Cycle 9 facade report submitted
11/14/2024
Cycle 9 facade report signed — SAFE
10/21/2024
Cycle 9 facade inspection completed
10/15/2024
Violation issued (HPD, closed)
B
10/15/2024
Violation issued (HPD, closed)
C
08/14/2024
Violation issued (HPD, closed)
C
07/22/2024
Violation issued (HPD, closed)
B
07/22/2024
Violation issued (HPD, open)
C
07/22/2024
Violation issued (HPD, closed)
B
07/22/2024
Violation issued (HPD, closed)
B
07/22/2024
Violation issued (HPD, closed)
B
07/19/2024
Violation issued (HPD, closed)
C
07/12/2024
Violation issued (FDNY_NOV, closed)
05/31/2024
Signed off — Alteration
FACADE REPAIR WORK. SCOPE INCLUDES REPLACEMENT OF CRACKED MASONRY, PARAPET REPLACEMENT, REPLACEMENT OF EXISTING STEEL LINTELS, CONCRETE SILL REPLACEMENT. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION Q00680663.
Q00623894-I1
04/09/2024
Violation issued (ECB, closed)
Construction
02/15/2024
Permit issued — Sidewalk Shed
Q00680663-I1-SH
02/14/2024
Permit issued — Suspended Scaffold
Q01002100-I1-SC
02/07/2024
Filed — Alteration
first renewal for SR 23/1122 transfer of old method paper submission to DOB NOW filing Q01002100 for facade inspection and work
Q01002100-I1
02/05/2024
Permit issued — General Construction
Q00623894-I1-GC
01/18/2024
Cycle 9 facade report submitted
01/18/2024
Cycle 9 facade report signed — UNSAFE
01/03/2024
Cycle 9 facade inspection completed
06/14/2023
Permit issued — General Construction
Q00623894-I1-GC
04/19/2023
Violation issued (HPD, closed)
C
04/19/2023
Violation issued (HPD, open)
C
04/19/2023
Violation issued (HPD, closed)
B
04/19/2023
Violation issued (HPD, closed)
C
04/19/2023
Violation issued (HPD, closed)
C
02/13/2023
Permit issued — Sidewalk Shed
Q00680663-I1-SH
01/25/2023
Cycle 9 facade report signed — UNSAFE
01/24/2023
Cycle 9 facade report submitted
01/20/2023
Cycle 9 facade inspection completed
12/11/2022
Violation issued (HPD, closed)
B
12/11/2022
Violation issued (HPD, closed)
A
12/11/2022
Violation issued (HPD, closed)
B
12/11/2022
Violation issued (HPD, closed)
B
12/11/2022
Violation issued (HPD, closed)
B
12/11/2022
Violation issued (HPD, closed)
A
12/11/2022
Violation issued (HPD, closed)
A
12/11/2022
Violation issued (HPD, closed)
A
12/11/2022
Violation issued (HPD, closed)
C
12/11/2022
Violation issued (HPD, closed)
B
12/11/2022
Violation issued (HPD, closed)
B
12/11/2022
Violation issued (HPD, closed)
B
12/11/2022
Violation issued (HPD, closed)
A
12/11/2022
Violation issued (HPD, closed)
B
12/11/2022
Violation issued (HPD, closed)
B
12/11/2022
Violation issued (HPD, closed)
A
12/11/2022
Violation issued (HPD, closed)
B
12/11/2022
Violation issued (HPD, closed)
B
12/11/2022
Violation issued (HPD, closed)
C
07/22/2022
Objection raised — Inspections
07/22/2022
Objection resolved — Addressed
07/16/2022
Filed — Alteration
FACADE REPAIR WORK. SCOPE INCLUDES REPLACEMENT OF CRACKED MASONRY, PARAPET REPLACEMENT, REPLACEMENT OF EXISTING STEEL LINTELS, CONCRETE SILL REPLACEMENT. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION Q00680663.
Q00623894-I1
05/25/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Paul Henry
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES NY INC02/15/2024
DOB NOWSuspended ScaffoldPermit IssuedKNS BLDG RESTORATION INC02/14/2024
DOB NOWGeneral ConstructionSigned-offKNS BUILDING REST02/05/2024
DOB NOWGeneral ConstructionSigned-offKNS BUILDING REST06/14/2023
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES LLC02/13/2023
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES LLC02/15/2022
BISPLISSUEDA & C HTG SERVICES, INC07/12/2010
BISFBISSUEDA AND C COMBUSTION SERVICES CORP09/26/1994
BISPLISSUEDACE-ATLAS PLBING & HTG09/26/1994
1 project · most recent 02/15/2022
FiledStatusContractorScope
02/15/2022CompleteRICHARD NEU—
1 project · most recent 02/07/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
02/07/2024Permit Issued—Suspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
05/25/2022Structural Stability – Alterations of existing buildingsPaul Henryspecial
11/02/2021MasonryPaul Henryspecial
11/02/2021FinalPaul Henryprogress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/26/2026Q00680663-I1Request digital key ↗
08/23/2026Q01002100-I1Request digital key ↗
08/14/2026Q00623894-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026Q00623894-I1Open ↗
08/23/2026Q00623894-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/26/2026Q00680663-I1Open ↗
08/13/2026Q00623894-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026Q00623894-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q00623894-I1Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026Q01002100-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026Q01002100-I1Open ↗