← Back
Elevator apt, semi-fireproof without stores
42-16 80 STREET
QUEENS · BIN 4037982
💬 Discuss this project
1940Year Built
6Stories
D1Building Class
R7BZoning
83,705 sfGross Floor Area
107Units
LL97 CoveredRent Stabilized1 Open Violation ▸
Elevator apt, semi-fireproof without stores · Owner of record: 42-16, LLC · 28,336 sf lot · 2.95 FAR built · Flood zone X
Locations of Work
Structural
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 3 docs
3 jobs · most recent 03/19/2026
FiledStatusContractorScope
03/19/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
03/05/2026CompleteRICHARD NEU—
10/04/2018CompleteZEV ELECTRIC CORP.—
1 job · most recent 03/06/2026
Sidewalk Shed
FiledStatusContractorScope
03/06/2026Signed-offA & H INSTALLATION INCSidewalk Shed
1 job · most recent 03/06/2026
Suspended Scaffold
FiledStatusContractorScope
03/06/2026Permit IssuedFAMOUS RESTORATION INCSuspended Scaffold
1 job · most recent 03/06/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
03/06/2026Permit IssuedFAMOUS RESTORATION INCSuspended Scaffold (SC)
Building Lifecycle
All (72)Filed (3)Permit Issued (4)Signed Off (1)Violation (60)Objection (2)Special Inspection (2)
08/11/2026
Signed off — Alteration
FACADE REPAIR INCLUDING LINTEL REPLACMENT, PARAPET WALL REPLACEMENT AND BRICK REPOINTING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01365380-I1
06/26/2026
Violation issued (ECB, closed)
Elevators
05/27/2026
Permit issued — Sidewalk Shed
Q01367970-I1-SH
03/18/2026
Permit issued — Suspended Scaffold
Q01368416-I1-SC
03/11/2026
Objection resolved — Addressed
03/10/2026
Objection raised — Other
03/06/2026
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01367970-I1
03/06/2026
Filed — Alteration
INSTALLATION OF OUTRIGGER FOR FACADE REPAIR.
Q01368416-I1
03/06/2026
Permit issued — Sidewalk Shed
Q01367970-I1-SH
03/03/2026
Permit issued — General Construction
Q01365380-I1-GC
03/01/2026
Filed — Alteration
FACADE REPAIR INCLUDING LINTEL REPLACMENT, PARAPET WALL REPLACEMENT AND BRICK REPOINTING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01365380-I1
03/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
FAZAL BANGASH
02/27/2026
Special inspection requirement — Final
FAZAL BANGASH
02/05/2026
Violation issued (HPD, closed)
A
02/05/2026
Violation issued (HPD, closed)
B
02/05/2026
Violation issued (HPD, closed)
A
02/05/2026
Violation issued (HPD, closed)
A
02/05/2026
Violation issued (HPD, closed)
C
12/17/2025
Violation issued (HPD, closed)
C
10/15/2025
Violation issued (HPD, closed)
C
10/15/2025
Violation issued (HPD, closed)
C
10/15/2025
Violation issued (HPD, closed)
B
10/15/2025
Violation issued (HPD, closed)
A
10/15/2025
Violation issued (HPD, closed)
B
10/15/2025
Violation issued (HPD, closed)
C
10/15/2025
Violation issued (HPD, closed)
B
10/15/2025
Violation issued (HPD, closed)
B
10/15/2025
Violation issued (HPD, closed)
B
01/20/2024
Violation issued (HPD, closed)
C
10/16/2022
Violation issued (HPD, closed)
C
10/16/2022
Violation issued (HPD, closed)
C
09/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/15/2020
Violation issued (HPD, closed)
A
12/15/2020
Violation issued (HPD, closed)
C
12/15/2020
Violation issued (HPD, closed)
B
12/15/2020
Violation issued (HPD, closed)
B
12/15/2020
Violation issued (HPD, closed)
A
10/28/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/07/2020
Violation issued (ECB, closed)
Elevators
09/10/2018
Violation issued (ECB, closed)
Elevators
12/21/2017
Violation issued (HPD, closed)
A
05/19/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/19/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/31/2015
Violation issued (HPD, closed)
B
01/31/2015
Violation issued (HPD, closed)
B
01/31/2015
Violation issued (HPD, closed)
B
05/13/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/13/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/27/2013
Violation issued (HPD, closed)
A
03/27/2013
Violation issued (HPD, closed)
C
03/27/2013
Violation issued (HPD, closed)
A
03/27/2013
Violation issued (HPD, closed)
A
03/27/2013
Violation issued (HPD, closed)
A
03/27/2013
Violation issued (HPD, closed)
A
07/25/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/25/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/03/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/21/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/21/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/01/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 72 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
42-16, LLC303/22/2026
42-16 LLC GREENHILL MGMT103/22/2026
BONNIE MANAGEMENT703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MCHENERY TESTING LAB103/06/2026
BANGASH ASSOCIATES INC.103/01/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A H INSTALLATION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & H INSTALLATION INCGeneral Contractor205/29/2026
FAMOUS RESTORATION INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BANGASH ASSOCIATES INC8488103/01/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offA & H INSTALLATION INC05/27/2026
DOB NOWSuspended ScaffoldPermit IssuedFAMOUS RESTORATION INC03/18/2026
DOB NOWSidewalk ShedSigned-offA H INSTALLATION03/06/2026
DOB NOWGeneral ConstructionSigned-offSE ENERGY03/03/2026
BISPLISSUEDDUAL FUEL PLUMBING & HEATING10/03/1994
BISBLISSUEDA AND C COMBUSTION SERVICES10/03/1994
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
03/01/2026Tenant Protection Plan ComplianceFAZAL BANGASHspecial
02/27/2026FinalFAZAL BANGASHprogress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/17/2026Q01365380-I1Request digital key ↗
08/17/2026Q01367970-I1Request digital key ↗
08/17/2026Q01368416-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026Q01367970-I1Open ↗
08/13/2026Q01365380-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026Q01365380-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026Q01365380-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01365380-I1Open ↗
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/17/2026Q01368416-I1Open ↗
▸DOB NOWCalculations1
08/17/2026Q01368416-I1Open ↗