| Firm | Filings | Most Recent |
|---|---|---|
| RAS PE CONSULTING ENGINEERS | 4 | 05/23/2022 |
| AMERILAND BROOK LLC | 5 | 03/24/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| AMERILAND BROOK LLC | 6 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| TT&T CONSTRUCTION INC | General Contractor | 4 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| G ENGINEERING PC | 7778 | 1 | 08/14/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | TT&T CONSTRUCTION INC | 05/12/2022 |
| DOB NOW | Construction Fence | Permit Issued | TT&T CONSTRUCTION INC | 03/28/2022 |
| DOB NOW | General Construction | Signed-off | TT&T CONSTRUCTION INC | 03/02/2022 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/20/2021 | — | — | Air Conditioning Systems, Associated Ducts and Piping, Heating Systems | Cooling Mitsubishi Electric MXZ-8C48NAHZ2 48,000 BTU · Split System ×4 MXZ-4C36NAHZ2-U1 36,000 BTU · Split System ×3 MXZ-4C36NAHZ2 36,000 BTU · Split System ×2 PKA-A12HA7 12,000 BTU · Split System ×1 Heating Navien NCB-190/080H 80,000 BTU · Boiler ×10 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/21/2021 | — | — | 126 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/21/2021 | — | — | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/14/2022 | Permit Issued | TT&T CONSTRUCTION INC | Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/24/2022 | Permit Issued | TT&T CONSTRUCTION INC | Fence |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 05/17/2022 | Subgrade Inspections | — | special |
| 05/17/2022 | Concrete - Cast-In-Place | — | special |
| 05/17/2022 | Structural Stability – Alterations of existing buildings | — | special |
| 05/17/2022 | Underpinning | — | special |
| 05/17/2022 | Footing and Foundation | — | progress |
| 05/17/2022 | Final | — | progress |
| 05/17/2022 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 03/30/2022 | Structural Stability – Alterations of existing buildings | — | special |
| 03/30/2022 | Concrete - Cast-In-Place | — | special |
| 02/14/2022 | Final | — | progress |
| 02/13/2022 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 02/13/2022 | Structural Stability – Alterations of existing buildings | — | special |
| 02/12/2022 | Final | XIAOHONG ZHAO | progress |
| 08/21/2021 | Permanent certificate | — | energy_progress |
| 08/21/2021 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 08/21/2021 | Metering | — | energy_progress |
| 08/21/2021 | HVAC-R and service water heating equipment | — | energy_progress |
| 08/21/2021 | Sprinkler Systems | — | special |
| 08/21/2021 | Fire-Resistant Penetrations and Joints | — | special |
| 08/21/2021 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | — | special |
| 08/21/2021 | Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities | — | special |
| 08/21/2021 | Subsurface Investigations (Borings/Test Pits) | TONY ONYEAGORO | special |
| 08/21/2021 | Energy Code Compliance Inspections | — | progress |
| 08/21/2021 | HVAC-R and service water heating system controls | — | energy_progress |
| 08/21/2021 | Maintenance information | — | energy_progress |