Two family converted from one family
23-28 101 STREET
QUEENS · BIN 4040817
💬 Discuss this project
1950Year Built
2Stories
B3Building Class
R3-1Zoning
1,358 sfGross Floor Area
2Units
0 Open Violations
Two family converted from one family · 2,500 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 24p · 1 filing · 20 docs
Floor 14p · 1 filing · 20 docs
Cellar10p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CITY BUILDING CONSULTANTS303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/07/2014$429K—Private party → Private party$316/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCALHEK712/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A&A BUILDING CONSULTANTS INC.1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CITY BUILDING CONSULTANTSGeneral Contractor407/08/2026
SIGNORE & SONS PLBG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCALHEK PC3340410/20/2022
Building Lifecycle
All (40)Filed (7)Permit Issued (3)Signed Off (1)Violation (4)Inspection (4)Objection (18)Special Inspection (3)
12/21/2022
Filed — Alteration CO
Propose to convert from 1 to 2 family and to add horizontal and vertical extension at rear.
Q00567921-P2
12/20/2022
Special inspection requirement — Insulation placement and R values
RAYMOND CALAMARI
11/30/2022
Permit issued — General Construction
Q00567921-I1-GC
11/07/2022
Signed off — Alteration
In cellar: propose tankless HWH, 3 pc bath (lavatory, toilet and shower) floor drain. In 1st FL: propose 3 pc bath (toilet, lavatory, tub) In 2nd FL: propose new kitchen (gas stove and residential sink), relocate 3 pc bath (bathtub, lavatory and toilet)
Q00706059-I1
10/24/2022
Objection resolved — Addressed
10/23/2022
Objection raised — Accessibility
10/20/2022
Filed — Alteration
In cellar: propose tankless HWH, 3 pc bath (lavatory, toilet and shower) floor drain. In 1st FL: propose 3 pc bath (toilet, lavatory, tub) In 2nd FL: propose new kitchen (gas stove and residential sink), relocate 3 pc bath (bathtub, lavatory and toilet)
Q00706059-P3
10/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAYMOND CALAMARI
10/12/2022
Filed — Alteration
In cellar: propose tankless HWH, 3 pc bath (lavatory, toilet and shower) floor drain. In 1st FL: propose 3 pc bath (toilet, lavatory, tub) In 2nd FL: propose new kitchen (gas stove and residential sink), relocate 3 pc bath (bathtub, lavatory and toilet)
Q00706059-P2
10/06/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/19/2022
Filed — Alteration CO
Propose to convert from 1 to 2 family and to add horizontal and vertical extension at rear.
Q00567921-P1
09/19/2022
Filed — Alteration
In cellar: propose tankless HWH, 3 pc bath (lavatory, toilet and shower) floor drain. In 1st FL: propose 3 pc bath (toilet, lavatory, tub) In 2nd FL: propose new kitchen (gas stove and residential sink), relocate 3 pc bath (bathtub, lavatory and toilet)
Q00706059-P1
08/11/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/09/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/27/2022
Special inspection requirement — Insulation placement and R values
RAYMOND CALAMARI
05/25/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/25/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/09/2022
Permit issued — Plumbing
Q00706059-I1-PL
04/30/2022
Violation issued (ECB, closed)
Construction
04/30/2022
Violation issued (ECB, closed)
Construction
04/30/2022
Violation issued (ECB, closed)
Construction
03/25/2022
Filed — Alteration
In cellar: propose tankless HWH, 3 pc bath (lavatory, toilet and shower) floor drain. In 1st FL: propose 3 pc bath (toilet, lavatory, tub) In 2nd FL: propose new kitchen (gas stove and residential sink), relocate 3 pc bath (bathtub, lavatory and toilet)
Q00706059-I1
03/03/2022
Permit issued — General Construction
Q00567921-I1-GC
10/31/2021
Objection raised — Zoning
10/31/2021
Objection resolved — Addressed
10/26/2021
Objection raised — Other
10/26/2021
Objection resolved — Addressed
10/26/2021
Objection raised — Other
10/26/2021
Objection resolved — Addressed
10/24/2021
Objection raised — Zoning
10/24/2021
Objection resolved — Addressed
10/03/2021
Objection raised — Zoning
10/03/2021
Objection resolved — Addressed
09/26/2021
Objection raised — Zoning
09/26/2021
Objection resolved — Addressed
09/26/2021
Objection raised — Zoning
09/26/2021
Objection resolved — Addressed
09/26/2021
Objection raised — Zoning
09/26/2021
Objection resolved — Addressed
09/20/2021
Filed — Alteration CO
Propose to convert from 1 to 2 family and to add horizontal and vertical extension at rear.
Q00567921-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCITY BUILDING CONSULTANTS11/30/2022
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP05/09/2022
DOB NOWGeneral ConstructionPermit IssuedCITY BUILDING CONSULTANTS03/03/2022
1 project · most recent 11/30/2022
General Wiring
FiledStatusContractorScope
11/30/2022CompleteEOS ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/06/2022Pass-Final CND-Occupancy InspectionPassView ↗
08/11/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/25/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/25/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
12/20/2022Insulation placement and R valuesRAYMOND CALAMARIenergy_progress
10/20/2022Fire-Resistant Penetrations and JointsRAYMOND CALAMARIspecial
05/27/2022Insulation placement and R valuesRAYMOND CALAMARIenergy_progress
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/26/2026Q00706059-I1Request digital key ↗
08/26/2026Q00706059-P1Request digital key ↗
08/26/2026Q00706059-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWRestrictive Declaration/Easement 14
08/13/2026Q00706059-P2Open ↗
08/13/2026Q00706059-P3Open ↗
08/13/2026Q00706059-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00567921-P1Open ↗
08/13/2026Q00567921-P2Open ↗
08/13/2026Q00567921-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00567921-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/26/2026Q00706059-P2Open ↗
08/26/2026Q00706059-I1Open ↗
08/26/2026Q00706059-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/30/2026Q00567921-P1Open ↗
08/27/2026Q00567921-P2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026Q00706059-P3Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026Q00567921-P1Open ↗
08/13/2026Q00567921-P2Open ↗
08/13/2026Q00567921-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00567921-P1Open ↗
08/13/2026Q00567921-I1Open ↗
08/13/2026Q00567921-P2Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00567921-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/26/2026Q00706059-I1Open ↗
08/13/2026Q00567921-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00567921-I1Open ↗
▸Other Documents9
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00567921-I1Open ↗
08/13/2026Q00567921-P2Open ↗
08/13/2026Q00567921-P1Open ↗
▸DOB NOWPlot Diagram3
08/13/2026Q00567921-I1Open ↗
08/13/2026Q00567921-P1Open ↗
08/13/2026Q00567921-P2Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q00567921-I1Open ↗
08/13/2026Q00567921-P2Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00567921-I1Open ↗