← Back
Two family frame
33-25 98 STREET
QUEENS · BIN 4042474
💬 Discuss this project
1910Year Built
2Stories
B2Building Class
R5AZoning
1,928 sfGross Floor Area
2Units
1 Open Violation ▸
Two family frame · 2,630 sf lot · 0.73 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Roof1p · 1 filing · 11 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M-CON ENGINEERING, PC112/04/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUSTAINABLE STRATEGIESGeneral Contractor203/21/2026
BERGER QUALITY ELEC'L CONElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M-CON ENGINEERING7341112/04/2024
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Violation (1)Special Inspection (5)
12/12/2024
Permit issued — Solar
Q01150935-I1-SL
12/04/2024
Filed — Alteration
Q01150935-I1
12/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michelle Contri
12/04/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michelle Contri
12/04/2024
Special inspection requirement — Energy Code Compliance Inspections
Michelle Contri
12/04/2024
Special inspection requirement — Final
Michelle Contri
12/04/2024
Special inspection requirement — Air barrier - visual inspection
Michelle Contri
07/17/2012
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUSTAINABLE STRATEGIES12/12/2024
2 projects · most recent 10/18/2024
FiledStatusContractorScope
10/18/2024Permit IssuedSOURCE ELECTRIC INC1 meters
03/31/2024Permit IssuedBERGER QUALITY ELEC'L CON—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/04/2024Fire-Resistant Penetrations and JointsMichelle Contrispecial
12/04/2024Structural Stability – Alterations of existing buildingsMichelle Contrispecial
12/04/2024Energy Code Compliance InspectionsMichelle Contriprogress
12/04/2024FinalMichelle Contriprogress
12/04/2024Air barrier - visual inspectionMichelle Contrienergy_progress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026Q01150935-I1Request digital key ↗
08/21/2026Q01150935-P1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026Q01150935-I1Open ↗
09/02/2026Q01150935-I1Open ↗
08/24/2026Q01150935-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/21/2026Q01150935-I1Open ↗
08/21/2026Q01150935-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026Q01150935-I1Open ↗
08/24/2026Q01150935-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026Q01150935-I1Open ↗
08/21/2026Q01150935-P1Open ↗