Two family converted from one family
109-15 34 AVENUE
QUEENS · BIN 4042822
💬 Discuss this project
1910Year Built
2.5Stories
B3Building Class
R5Zoning
2,322 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 4,067 sf lot · 0.57 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
CellarUnder Construction1p · 1 filing · 12 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GINO O. LONGO, ARCHITECT303/23/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VITELLO SEWER W.M H&P SERPlumbing208/20/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GINO O. LONGO ARCHITETCT331204/14/2025
Building Lifecycle
All (21)Filed (3)Permit Issued (2)Violation (3)Inspection (3)Objection (8)Special Inspection (2)
08/19/2026
Permit issued — Plumbing
Q01165455-S1-PL
03/23/2026
Filed — Alteration
APPLICATION FILED FOR (1) NEW 2-PIECE BATHROOM AT ATTIC LEVEL.
Q01165455-S2
03/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/19/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/13/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/22/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/21/2026
Permit issued — Plumbing
Q01165455-I1-PL
05/28/2025
Objection resolved — Addressed
05/28/2025
Objection resolved — Addressed
04/17/2025
Objection raised — Scope
04/17/2025
Objection raised — Cost
04/14/2025
Filed — Alteration
APPLICATION FILED FOR (1) NEW 2-PIECE BATHROOM AT ATTIC LEVEL.
Q01165455-S1
04/04/2025
Objection resolved — Addressed
03/03/2025
Objection resolved — Addressed
02/20/2025
Objection raised — Scope
02/20/2025
Objection raised — Zoning
02/14/2025
Filed — Alteration
APPLICATION FILED FOR (1) NEW 2-PIECE BATHROOM AT ATTIC LEVEL.
Q01165455-I1
01/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GINO LONGO
04/24/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/24/2008
Violation issued (ECB, closed)
Construction
04/24/2008
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedVITELLO SEWER W.M H&P SER08/19/2026
DOB NOWPlumbingSigned-offVITELLO SEWER W.M H&P SER01/21/2026
BISPLISSUEDTHE PLUMBING CO INC10/17/2006
BIS—ISSUEDGOLDSMITH CONSTRUCTION CORP08/11/2006
1 project · most recent 03/23/2026
Water/Sanitary
FiledStatusContractorScope
03/23/2026Permit IssuedVITELLO SEWER W.M H&P SERWater/Sanitary
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/19/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/13/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/22/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
03/06/2026Fire-Resistant Penetrations and Joints—special
01/10/2025Fire-Resistant Penetrations and JointsGINO LONGOspecial
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026Q01165455-S2Request digital key ↗
08/20/2026Q01165455-I1Request digital key ↗
08/20/2026Q01165455-S1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION6
05/14/2025402435753Open ↗
09/26/2024402435753Open ↗
09/24/2024402435753Open ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026Q01165455-I1Open ↗
08/13/2026Q01165455-S2Open ↗
▸BISVERIFY TAX LOT1
06/18/2024402435753Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
06/17/2024402435753Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026Q01165455-S2Open ↗
08/20/2026Q01165455-S1Open ↗
08/20/2026Q01165455-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/29/2026Q01165455-I1Open ↗
▸Trade Schedules & Equipment2
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
06/17/2024402435753Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
06/17/2024402435753Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
09/26/2024402435753Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026Q01165455-S2Open ↗
08/20/2026Q01165455-S1Open ↗
08/20/2026Q01165455-I1Open ↗
▸Inspections & Test Reports4
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-011
06/17/2024402435753Open ↗
▸BIS* DRYWELL INST RET/DET : TR1-DRYWELL RS16-P110.131
06/17/2024402435753Open ↗
▸BIS* CONCRETE 27-6031
06/17/2024402435753Open ↗
▸BIS* SOIL PERCOLATE TEST-DRY WELL RS16-P1131
06/17/2024402435753Open ↗
▸Approvals, Objections & Sign-offs3
▸BISSCHEDULE A - OCCUPANCY / USE2
09/24/2024402435753Open ↗
06/05/2024402435753Open ↗
▸BISFINAL CONSTRUCTION SIGNOFF1
10/21/2024402435753Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT (FINAL): PW31
06/18/2024402435753Open ↗
▸Filing & Intake Forms1
▸BISADDITIONAL INFORMATION1
06/18/2024402435753Open ↗
▸Other Documents3
▸BIS* FIRE STOPS 27-3451
06/17/2024402435753Open ↗
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
06/17/2024402435753Open ↗
▸BIS* * SUBGRADE 27-723,DIRC 15/711
06/17/2024402435753Open ↗