| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 03/01/2024 | Permit Issued | NY DYNAMIC CONSTRUCTION C | Air Conditioning Systems, Heating Systems, Ventilation Systems | Cooling Guardian RAC13L48B23S 48,000 BTU · Condensing Unit ×4 Heating Guardian RFCX30BP10MP22 30,000 BTU · Ahu ×4 Ventilation Hampton Bay 7114-01 50 CFM · Exhaust Fan ×16 Delta Breeze SMT150 150 CFM · Exhaust Fan ×4 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/01/2024 | Signed-off | GREGG NY PLUMBING, INC | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/12/2025 | Complete | BRANDL ELECTRIC INC. | 1 meters, 1 new_meters |
| 04/24/2023 | Complete | WCK ELECTRIC CORP. | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/01/2024 | Signed-off | GREGG NY PLUMBING, INC | Steel, Wood |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 10/25/2022 | $1.8M | — | ANDREW J. TUNICK, CO TRUSTEE → Private party | $608/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| BORIS BALKHIYEV, PE | 1 | 10/21/2025 |
| CL ENGINEERING P.C. | 8 | 03/01/2024 |
| Representative | Filings | Most Recent |
|---|---|---|
| METRO DESIGN CONSULTANTS INC | 16 | 03/21/2026 |
| Advanced Solar Solutions | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| NY DYNAMIC CONSTRUCTION C | General Contractor | 5 | 07/08/2026 |
| ADVANCED SOLAR SOLUTIONS | General Contractor | 2 | 03/21/2026 |
| LXC CONSTRUCTION INC | General Contractor | 1 | 07/08/2026 |
| GREGG NY PLUMBING, INC | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| MB INSPECTIONS, CORP. | 8703 | 1 | 10/21/2025 |
| CL ENGINEERING P.C. | 6781 | 6 | 03/01/2024 |
| TRIANGLE INSPECTION & TES | 7495 | 2 | 03/01/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Solar | Signed-off | ADVANCED SOLAR SOLUTIONS | 11/05/2025 |
| DOB NOW | Plumbing | Signed-off | GREGG NY PLUMBING, INC | 05/12/2023 |
| DOB NOW | Foundation | Permit Issued | NY DYNAMIC CONSTRUCTION C | 04/28/2023 |
| DOB NOW | Curb Cut | Signed-off | NY DYNAMIC CONSTRUCTION C | 04/27/2023 |
| DOB NOW | Construction Fence | Signed-off | NY DYNAMIC CONSTRUCTION C | 04/25/2023 |
| DOB NOW | Construction Fence | Signed-off | LXC CONSTRUCTION INC | 11/01/2022 |
| BIS | — | ISSUED | NA | 03/25/1999 |
| BIS | OT | ISSUED | NA | 03/25/1999 |
| Date | Type | Result | Report |
|---|---|---|---|
| 06/04/2024 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 05/08/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 04/30/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 01/25/2024 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 01/12/2024 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 10/30/2023 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 09/29/2023 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 09/29/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/15/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 10/16/2025 | Final | BORIS BALKHIYEV | progress |
| 10/16/2025 | Air barrier - visual inspection | BORIS BALKHIYEV | energy_progress |
| 10/16/2025 | Structural Stability – Alterations of existing buildings | BORIS BALKHIYEV | special |
| 10/16/2025 | Fire-Resistant Penetrations and Joints | BORIS BALKHIYEV | special |
| 10/16/2025 | Energy Code Compliance Inspections | BORIS BALKHIYEV | progress |
| 03/11/2024 | Fire-Resistant Penetrations and Joints | CHRISTIAN LOZADA | special |
| 03/11/2024 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | CHRISTIAN LOZADA | special |
| 03/11/2024 | Energy Code Compliance Inspections | CHRISTIAN LOZADA | progress |
| 03/11/2024 | Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities | Rajasekhar Sakhamuri | special |
| 03/11/2024 | HVAC-R and service water heating equipment | CHRISTIAN LOZADA | energy_progress |
| 03/11/2024 | HVAC-R and service water heating system controls | CHRISTIAN LOZADA | energy_progress |
| 03/11/2024 | HVAC-R and service water piping design and insulation | CHRISTIAN LOZADA | energy_progress |
| 03/11/2024 | Maintenance information | CHRISTIAN LOZADA | energy_progress |
| 03/01/2024 | Masonry | CHRISTIAN LOZADA | special |
| 03/01/2024 | Mechanical Systems | CHRISTIAN LOZADA | special |
| 03/01/2024 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | CHRISTIAN LOZADA | special |
| 03/01/2024 | Structural Cold-Formed Steel | CHRISTIAN LOZADA | special |
| 03/01/2024 | Structural Stability – Alterations of existing buildings | CHRISTIAN LOZADA | special |
| 03/01/2024 | Structural Steel - Details | CHRISTIAN LOZADA | special |
| 03/01/2024 | Structural Steel - High Strength Bolting | CHRISTIAN LOZADA | special |
| 03/01/2024 | Subgrade Inspections | CHRISTIAN LOZADA | special |
| 03/01/2024 | Subsurface Investigations (Borings/Test Pits) | Rajasekhar Sakhamuri | special |
| 03/01/2024 | Energy Code Compliance Inspections | CHRISTIAN LOZADA | progress |
| 03/01/2024 | Final | CHRISTIAN LOZADA | progress |
| 03/01/2024 | Fire-Resistance Rated Construction | CHRISTIAN LOZADA | progress |