ECB01/08/2026UPON RESEARCH OF DEPARTMENTAL RECORDS I OBSERVED THE CONTRACTOR RAISED THE ROOF AT THE FRONT OF THE BUILDING CONTRARY TO APPROVED PLANS, NON-CONFORMING WORK POSES A SEVERE THREAT OR HAZARD TO WORKERS AND/OR PUB$2K due
ECB01/06/2026WORK WITHOUT A PERMIT. NOTED: AT THE TIME OF INSPECTION OBSERVED A PROPOSED 2.5 STORY STRUCTURE ERECTED TO 3 STORIES. NO PERMITS IN DOB RECORDS FOR AN 3 STORY STRUCTURE UPON FURTHER RESEARCH. WORK CONTRARY TO A$2K due
ECB01/06/2026FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS. AS NOTED: AT TIME OF INSPECTIONS OBSERVED A 215 STORY BUILDING UNDER ACTIVE ALT, PERMIT (1)01245952 FOR FULL RENOVATION, FULL CR$5K due
DOB01/06/2026STRUCTURE RENDERED NON-COMPLIANT DUE TO FIRE THROUGHOUT THE PREMISES WHICH HAS CAUSED EXTENSIVE FIRE, WATER AND SMOKE DAMAGE. ALSO LEAVING STRUCTURE OPEN TO THE ELEMENTS.
DOB01/06/2026EMERGENCY WORK.BLDG SFFRD A 2ALARM FIRE ON 1/5/26&SUSTAINED STRCTRL DMG.APPRX 80% OF TOP STRY&ROOF PRTLLY CLLPSD.ENTIRE 3RDFL&ALL 2ND STRY WALLS FIRE DMGD W/APPRX 25% OF 3RDFL PRTLLY CLLPSD.LOCK AREAS.1.IMMED FULLY DEMO BLDG,2.ALL WRK TO BE DRCTLY SPRVSD&DRECTD BY ONSITE NYS PE STRCTRL ENG&PERFRMD BY DEMO ENDRSD CNTRCTR
DOB01/06/2026FAILURE TO MAINTAIN DUE TO FIRE.BLDG SFFRD A 2-ALARM FIRE ON 1/5/26& SUSTAIND STRCTE DMG APPRX 80% OF TOP STRY&ROOF PRTLLY CLLPSD BLDG PRTLLY DEMO'D TO 2NDFL LVL&STBLZE UNDR EMERGENCY WORK.1.NYSPE STRCT ENG TO IMMED EVAL ENT BLDG&DSGN RPAIRS,2.FILE FOR RPAIRS BY 7/6/26,3 OBTN PRMTS&STRT WRK BY 7/20/26
Two family converted from one family · 1,900 sf lot · 0.66 FAR built · Flood zone X