← Back
Two family converted from one family
44-37 64 STREET
QUEENS · BIN 4053643
💬 Discuss this project
1910Year Built
2.5Stories
B3Building Class
R4-1Zoning
1,254 sfGross Floor Area
2Units
6 Open Violations ▸
Two family converted from one family · 1,900 sf lot · 0.66 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction20p · 3 filings · 20 docs
Floor 2Under Construction36p · 3 filings · 20 docs
Floor 1Under Construction23p · 3 filings · 20 docs
CellarUnder Construction19p · 3 filings · 20 docs
1 job · most recent 12/16/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/16/2025Permit IssuedCUBE BUILDERS GROUP NYAir Conditioning Systems
1 job · most recent 03/17/2025
General Wiring
FiledStatusContractorScope
03/17/2025CompleteKWONG MING ELECTRIC INCGeneral Wiring
2 jobs · most recent 06/22/2026
Steel Concrete Wood
FiledStatusContractorScope
06/22/2026Permit IssuedACER CONSTRUCTION INCSteel, Concrete, Wood
01/28/2026——1 scope_items
Building Lifecycle
All (85)Filed (8)Permit Issued (5)Violation (8)Inspection (1)Objection (38)Special Inspection (25)
09/29/2026
Permit issued — Structural
Q01385769-S2-ST
09/22/2026
Permit issued — General Construction
Q01385769-I1-GC
08/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/25/2026
Special inspection requirement — Fire-Resistance Rated Construction
08/25/2026
Special inspection requirement — Final
08/25/2026
Special inspection requirement — Energy Code Compliance Inspections
08/25/2026
Special inspection requirement — Insulation placement and R values
08/25/2026
Special inspection requirement — Air barrier - visual inspection
08/25/2026
Special inspection requirement — Fenestration air leakage
08/25/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
08/25/2026
Special inspection requirement — Interior lighting power
07/15/2026
Objection resolved — Resolved
07/14/2026
Objection raised — Other
06/30/2026
Objection resolved — Resolved
06/29/2026
Objection resolved — Resolved
06/29/2026
Objection resolved — Resolved
06/23/2026
Objection raised — Other
06/23/2026
Objection raised — Other
06/23/2026
Objection raised — Other
06/22/2026
Filed — Alteration
PROPOSED INTERIOR RENOVATION AND EXTERIOR WORK FOR AN EXISTING 2 FAMILY BUILDING AS PER PLAN. VERTICALLY RAISED THE HEIGHT OF 2ND FLOOR ROOF. NO CHANGE IN EGRESS, USE AND OCCUPANCY.
Q01385769-P1
06/03/2026
Filed — Alteration
PROPOSED INTERIOR RENOVATION AND EXTERIOR WORK FOR AN EXISTING 2 FAMILY BUILDING AS PER PLAN. VERTICALLY RAISED THE HEIGHT OF 2ND FLOOR ROOF. NO CHANGE IN EGRESS, USE AND OCCUPANCY.
Q01385769-S2
04/20/2026
Objection raised — Other
04/20/2026
Objection resolved — Addressed
04/20/2026
Objection raised — Other
04/20/2026
Objection resolved — Addressed
04/20/2026
Objection raised — Other
04/20/2026
Objection resolved — Addressed
04/20/2026
Objection raised — Other
04/20/2026
Objection resolved — Resolved
04/20/2026
Objection raised — Other
04/20/2026
Objection resolved — Addressed
04/20/2026
Objection raised — Other
04/20/2026
Objection resolved — Addressed
04/20/2026
Objection raised — Other
04/20/2026
Objection resolved — Addressed
04/20/2026
Objection raised — Other
04/20/2026
Objection resolved — Addressed
04/20/2026
Objection raised — Other
04/20/2026
Objection resolved — Addressed
04/20/2026
Objection raised — Other
04/20/2026
Objection resolved — Addressed
04/13/2026
Filed — Alteration
PROPOSED INTERIOR RENOVATION AND EXTERIOR WORK FOR AN EXISTING 2 FAMILY BUILDING AS PER PLAN. VERTICALLY RAISED THE HEIGHT OF 2ND FLOOR ROOF. NO CHANGE IN EGRESS, USE AND OCCUPANCY.
Q01385769-I1
03/25/2026
Objection resolved — Addressed
03/25/2026
Objection resolved — Addressed
03/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/12/2026
Objection resolved — Addressed
02/20/2026
Objection resolved — Addressed
02/20/2026
Objection resolved — Addressed
02/17/2026
Objection raised — Structural
02/17/2026
Objection raised — Structural
02/17/2026
Objection raised — Energy
02/17/2026
Objection raised — Cost
02/17/2026
Objection raised — Fire_Protection
01/28/2026
Filed — Alteration
Per DOB approved emergency work, partial demolition of the unsafe roof, third floor and second floor caused by fire damage. This application is filed to address V010626CFEU40201BS. No change to use, occupancy or egress.
Q01346727-I1
01/08/2026
Violation issued (ECB, open)
Construction
01/06/2026
Violation issued (ECB, open)
Construction
01/06/2026
Violation issued (ECB, open)
Construction
01/06/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/06/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 85 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CUBE BUILDERS GROUP NY303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/19/2024$750K—Private party → Private party$598/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LIANG ENGINEERING, PLLC206/22/2026
LMW ENGINEERING GROUP LLC206/03/2026
NIC 88 CORP412/16/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor404/09/2026
ACER CONSTRUCTION INCGeneral Contractor209/30/2026
PACIFIC PLBG&HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LMW ENGINEERING GROUP LLC279101/28/2026
NIC DESIGN INC9758312/16/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedACER CONSTRUCTION INC09/29/2026
DOB NOWGeneral ConstructionPermit IssuedACER CONSTRUCTION INC09/22/2026
DOB NOWPlumbingPermit IssuedPACIFIC PLBG&HTG CORP12/29/2025
DOB NOWConstruction FencePermit IssuedCUBE BUILDERS GROUP NY08/21/2025
DOB NOWGeneral ConstructionPermit IssuedCUBE BUILDERS GROUP NY08/20/2025
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/24/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
08/25/2026Fire-Resistant Penetrations and Joints—special
08/25/2026Fire-Resistance Rated Construction—progress
08/25/2026Final—progress
08/25/2026Energy Code Compliance Inspections—progress
08/25/2026Insulation placement and R values—energy_progress
08/25/2026Air barrier - visual inspection—energy_progress
08/25/2026Fenestration air leakage—energy_progress
08/25/2026Fenestration and door U-factor and product ratings—energy_progress
08/25/2026Interior lighting power—energy_progress
10/14/2025Mechanical SystemsEric Sunspecial
10/14/2025Fire-Resistant Penetrations and JointsEric Sunspecial
10/14/2025Fire-Resistance Rated ConstructionEric Sunprogress
10/14/2025Energy Code Compliance InspectionsEric Sunprogress
10/14/2025FinalEric Sunprogress
10/14/2025Insulation placement and R valuesEric Sunenergy_progress
10/14/2025Maintenance informationEric Sunenergy_progress
10/14/2025Interior lighting powerEric Sunenergy_progress
10/14/2025HVAC-R and service water piping design and insulationEric Sunenergy_progress
10/14/2025HVAC-R and service water heating equipmentEric Sunenergy_progress
10/14/2025HVAC-R and service water heating system controlsEric Sunenergy_progress
08/21/2025Fire-Resistant Penetrations and JointsEric Sunspecial
08/21/2025Energy Code Compliance InspectionsEric Sunprogress
08/21/2025HVAC-R and service water piping design and insulationEric Sunenergy_progress
08/21/2025HVAC-R and service water heating equipmentEric Sunenergy_progress
08/21/2025HVAC-R and service water heating system controlsEric Sunenergy_progress
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/29/2026Q01385769-I1Request digital key ↗
08/29/2026Q01385769-P1Request digital key ↗
08/18/2026Q01245952-S1Request digital key ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications36
▸DOB NOWProgress Inspector Seal & Signature22
09/02/2026Q01245952-P2Open ↗
09/02/2026Q01245952-P2Open ↗
09/02/2026Q01245952-P2Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/18/2026Q01245952-I1Open ↗
08/18/2026Q01245952-P1Open ↗
08/18/2026Q01245952-S2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026Q01245952-P2Open ↗
09/02/2026Q01245952-P2Open ↗
08/23/2026Q01245952-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/18/2026Q01245952-I1Open ↗
08/18/2026Q01245952-S1Open ↗
08/18/2026Q01245952-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/16/2026Q01385769-I1Open ↗
08/15/2026Q01385769-S2Open ↗