← Back
Two family frame
67-15 52 AVENUE
QUEENS · BIN 4056090
💬 Discuss this project
1935Year Built
2Stories
B2Building Class
R4-1Zoning
1,968 sfGross Floor Area
2Units
Rent Stabilized0 Open Violations
Two family frame · Owner of record: 6715 MGMT LLC · 5,000 sf lot · 0.39 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Floor 23p · 1 filing · 20 docs
Floor 1
Cellar4p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
6715 MGMT LLC303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/18/2025$1.4M—— → —$699/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Q & F CONSTRUCTION INC.703/25/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Q&F CONSTRUCTION INCGeneral Contractor504/09/2026
THOMAS F. CASH & SONS INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FLUSHING ENGINEERING SERV4373703/25/2026
Building Lifecycle
All (59)Filed (7)Permit Issued (4)Signed Off (4)Violation (3)Inspection (9)Objection (2)Special Inspection (30)
05/05/2026
Signed off — Alteration
PROPOSED GAS AND PLUMBING WORK ON EXIST. 2 -STORY BUILDING IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION. UPDATE NUMBER OF PLUMBING FIXTURES.
Q01230148-I1
05/05/2026
Signed off — Alteration
PROPOSED GAS AND PLUMBING WORK ON EXIST. 2 -STORY BUILDING IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION. UPDATE NUMBER OF PLUMBING FIXTURES.
Q01230148-S3
05/05/2026
Signed off — Alteration
PROPOSED GAS AND PLUMBING WORK ON EXIST. 2 -STORY BUILDING IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION. UPDATE NUMBER OF PLUMBING FIXTURES.
Q01230148-S1
05/05/2026
Signed off — Alteration
Q01274246-I1
03/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
03/27/2026
Special inspection requirement — Energy Code Compliance Inspections
KY FU
03/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
KY FU
03/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
KY FU
03/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
KY FU
03/25/2026
Filed — Alteration
PROPOSED GAS AND PLUMBING WORK ON EXIST. 2 -STORY BUILDING IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION. UPDATE NUMBER OF PLUMBING FIXTURES.
Q01230148-P4
03/17/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
KY FU
03/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
03/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
KY FU
03/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
KY FU
03/03/2026
Special inspection requirement — Energy Code Compliance Inspections
KY FU
02/20/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
11/24/2025
Permit issued — Mechanical Systems
Q01230148-S3-MS
11/12/2025
Permit issued — Structural
Q01274246-I1-ST
11/06/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/06/2025
Inspection — Certified Gas-Gas-Piping-Underground
Certified
View inspection ↗
11/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/09/2025
Objection resolved — Addressed
10/06/2025
Objection raised — Cost
09/22/2025
Filed — Alteration
PROPOSED GAS AND PLUMBING WORK ON EXIST. 2 -STORY BUILDING IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION. UPDATE NUMBER OF PLUMBING FIXTURES.
Q01230148-S3
09/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
09/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
KY FU
09/08/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
KY FU
09/08/2025
Special inspection requirement — Air barrier - visual inspection
KY FU
09/08/2025
Special inspection requirement — Fenestration areas
KY FU
09/08/2025
Special inspection requirement — Fenestration air leakage
KY FU
09/08/2025
Special inspection requirement — Interior lighting power
KY FU
09/08/2025
Special inspection requirement — Concrete - Cast-In-Place
KY FU
09/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
KY FU
09/08/2025
Special inspection requirement — Energy Code Compliance Inspections
KY FU
08/22/2025
Filed — Alteration
Q01274246-I1
08/22/2025
Special inspection requirement — Mechanical Systems
KY FU
08/22/2025
Special inspection requirement — Final
KY FU
08/21/2025
Special inspection requirement — Concrete - Cast-In-Place
KY FU
08/19/2025
Special inspection requirement — Structural Steel - Details
KY FU
08/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
KY FU
08/19/2025
Special inspection requirement — Final
KY FU
07/30/2025
Filed — Alteration
PROPOSED GAS AND PLUMBING WORK ON EXIST. 2 -STORY BUILDING IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION. UPDATE NUMBER OF PLUMBING FIXTURES.
Q01230148-P2
07/29/2025
Filed — Alteration
PROPOSED GAS AND PLUMBING WORK ON EXIST. 2 -STORY BUILDING IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION. UPDATE NUMBER OF PLUMBING FIXTURES.
Q01230148-P1
07/18/2025
Special inspection requirement — Fenestration air leakage
KY FU
07/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
07/18/2025
Special inspection requirement — Energy Code Compliance Inspections
KY FU
07/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
KY FU
07/15/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
07/10/2025
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
07/07/2025
Inspection — Pass-Final SD - Up to 9 Requested Floors
Pass
View inspection ↗
07/01/2025
Permit issued — Plumbing
Q01230148-S1-PL
07/01/2025
Violation issued (ECB, closed)
Construction
07/01/2025
Violation issued (ECB, closed)
Construction
07/01/2025
Violation issued (ECB, closed)
Construction
06/12/2025
Filed — Alteration
PROPOSED GAS AND PLUMBING WORK ON EXIST. 2 -STORY BUILDING IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION. UPDATE NUMBER OF PLUMBING FIXTURES.
Q01230148-S1
06/06/2025
Permit issued — General Construction
Q01230148-I1-GC
06/04/2025
Filed — Alteration
PROPOSED GAS AND PLUMBING WORK ON EXIST. 2 -STORY BUILDING IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION. UPDATE NUMBER OF PLUMBING FIXTURES.
Q01230148-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offQ&F CONSTRUCTION INC11/24/2025
DOB NOWStructuralSigned-offQ&F CONSTRUCTION INC11/12/2025
DOB NOWPlumbingSigned-offTHOMAS F. CASH & SONS INC07/01/2025
DOB NOWGeneral ConstructionSigned-offQ&F CONSTRUCTION INC06/06/2025
1 project · most recent 03/25/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/25/2026Signed-offQ&F CONSTRUCTION INCAir Conditioning Systems
Cooling
Gree LIV09HP230V1R32AO 9,000 BTU · Split System ×6
LIV18HP230V1R32AO 18,000 BTU · Split System ×2
MULT30HP230V1R32AO 30,000 BTU · Split System ×1
1 project · most recent 03/25/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/25/2026Signed-offTHOMAS F. CASH & SONS INCGas, Water/Sanitary
2 projects · most recent 03/26/2026
General Wiring
FiledStatusContractorScope
03/26/2026CompleteKJK ELECTRIC INCGeneral Wiring
07/01/2025CompleteKJK ELECTRIC INC—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
03/17/2026Pass-Final General Construction Non-Directive 14PassView ↗
02/20/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
11/06/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/06/2025Certified Gas-Gas-Piping-UndergroundCertifiedView ↗
11/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/06/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/15/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/10/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
07/07/2025Pass-Final SD - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
03/27/2026Fire-Resistant Penetrations and JointsKY FUspecial
03/27/2026Energy Code Compliance InspectionsKY FUprogress
03/27/2026HVAC-R and service water heating equipmentKY FUenergy_progress
03/27/2026HVAC-R and service water heating system controlsKY FUenergy_progress
03/27/2026HVAC-R and service water piping design and insulationKY FUenergy_progress
03/03/2026HVAC-R and service water piping design and insulationKY FUenergy_progress
03/03/2026Fire-Resistant Penetrations and JointsKY FUspecial
03/03/2026HVAC-R and service water heating equipmentKY FUenergy_progress
03/03/2026HVAC-R and service water heating system controlsKY FUenergy_progress
03/03/2026Energy Code Compliance InspectionsKY FUprogress
09/08/2025Fire-Resistant Penetrations and JointsKY FUspecial
09/08/2025Fire-Resistance Rated ConstructionKY FUprogress
09/08/2025Fenestration and door U-factor and product ratingsKY FUenergy_progress
09/08/2025Air barrier - visual inspectionKY FUenergy_progress
09/08/2025Fenestration areasKY FUenergy_progress
09/08/2025Fenestration air leakageKY FUenergy_progress
09/08/2025Interior lighting powerKY FUenergy_progress
09/08/2025Concrete - Cast-In-PlaceKY FUspecial
09/08/2025Structural Stability – Alterations of existing buildingsKY FUspecial
09/08/2025Energy Code Compliance InspectionsKY FUprogress
08/22/2025Mechanical SystemsKY FUspecial
08/22/2025FinalKY FUprogress
08/21/2025Concrete - Cast-In-PlaceKY FUspecial
08/19/2025Structural Steel - DetailsKY FUspecial
08/19/2025Structural Stability – Alterations of existing buildingsKY FUspecial
Latest 25 of 41.
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/17/2026Q01230148-S1Request digital key ↗
08/17/2026Q01230148-P1Request digital key ↗
08/17/2026Q01230148-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications47
▸DOB NOWProgress Inspector Seal & Signature28
09/21/2026Q01230148-S3Open ↗
09/01/2026Q01230148-S1Open ↗
09/01/2026Q01230148-S1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/21/2026Q01230148-S3Open ↗
09/01/2026Q01230148-S1Open ↗
08/24/2026Q01230148-P4Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/17/2026Q01230148-S1Open ↗
08/17/2026Q01230148-P2Open ↗
08/17/2026Q01230148-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/17/2026Q01230148-S1Open ↗
08/17/2026Q01230148-P2Open ↗
08/17/2026Q01230148-I1Open ↗
Showing 3 of 6 on file for this type