Two stories - detached, small or mid-size
49-12 69 STREET
QUEENS · BIN 4056224
💬 Discuss this project
1930Year Built
2Stories
A1Building Class
R4-1Zoning
1,000 sfGross Floor Area
1Units
Rent Stabilized4 Open Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · 2,000 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 15 docs
Floor 21p · 1 filing · 15 docs
Floor 1
1 job · most recent 11/18/2022
Gas Water/Sanitary
FiledStatusContractorScope
11/18/2022Signed-off2M MECHANICAL LLCGas, Water/Sanitary
2 jobs · most recent 03/15/2022
General Wiring
FiledStatusContractorScope
03/15/2022CompleteWCK ELECTRIC CORP.General Wiring
06/26/2020CompleteAGIR ELEC'L LTD. D/B/A—
Building Lifecycle
All (48)Filed (3)Permit Issued (3)Signed Off (2)Violation (24)Inspection (4)Special Inspection (12)
11/25/2025
Violation issued (HPD, open)
I
12/04/2024
Violation issued (HPD, open)
I
11/29/2023
Violation issued (HPD, open)
I
05/02/2023
Signed off — Alteration
Respectfully request to amend application to show gas equipment and drawing to show existing HWH and boiler at cellar level on gas riser diagram.
Q00565695-I1
02/27/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/16/2022
Signed off — Alteration
Q00526618-I1
11/18/2022
Filed — Alteration
Respectfully request to amend application to show gas equipment and drawing to show existing HWH and boiler at cellar level on gas riser diagram.
Q00565695-S1
11/18/2022
Violation issued (HPD, open)
I
07/22/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/03/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/01/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/29/2022
Permit issued — Plumbing
Q00565695-I1-PL
03/25/2022
Permit issued — General Construction
Q00526618-I1-GC
03/25/2022
Permit issued — General Construction
Q00526618-I1-ST
03/17/2022
Violation issued (HPD, closed)
I
08/13/2021
Violation issued (ECB, closed)
Construction
08/13/2021
Violation issued (ECB, closed)
Construction
07/28/2021
Filed — Alteration
Respectfully request to amend application to show gas equipment and drawing to show existing HWH and boiler at cellar level on gas riser diagram.
Q00565695-I1
07/28/2021
Filed — Alteration
Q00526618-I1
07/28/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Albert Munoz
05/28/2021
Special inspection requirement — Air barrier - visual inspection
Albert Munoz
05/27/2021
Special inspection requirement — Masonry
Albert Munoz
05/27/2021
Special inspection requirement — Energy Code Compliance Inspections
Albert Munoz
05/27/2021
Special inspection requirement — Fire-Resistance Rated Construction
Albert Munoz
05/27/2021
Special inspection requirement — Structural Wood Frame
Albert Munoz
05/27/2021
Special inspection requirement — Lighting in dwelling units
Albert Munoz
05/27/2021
Special inspection requirement — Insulation placement and R values
Albert Munoz
05/27/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
Albert Munoz
05/27/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Albert Munoz
05/27/2021
Special inspection requirement — Concrete - Cast-In-Place
Albert Munoz
05/21/2021
Special inspection requirement — Final
Albert Munoz
04/21/2021
Violation issued (HPD, closed)
I
03/04/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/19/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/20/2019
Violation issued (ECB, closed)
Construction
11/20/2019
Violation issued (ECB, closed)
Quality of Life
11/20/2019
Violation issued (ECB, closed)
Quality of Life
11/20/2019
Violation issued (ECB, closed)
Quality of Life
11/20/2019
Violation issued (ECB, closed)
Construction
11/20/2019
Violation issued (ECB, closed)
Quality of Life
11/20/2019
Violation issued (ECB, closed)
Quality of Life
11/20/2019
Violation issued (ECB, closed)
Quality of Life
11/20/2019
Violation issued (ECB, closed)
Quality of Life
11/20/2019
Violation issued (ECB, closed)
Construction
11/20/2019
Violation issued (ECB, closed)
Construction
11/07/2019
Violation issued (HPD, closed)
I
01/08/2018
Violation issued (HPD, closed)
I
05/21/2014
Violation issued (ECB, closed)
Construction
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A M ENGINEERING SERVICES PC311/18/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DFE CONTRACTOR LLCGeneral Contractor207/08/2026
LOUIS DEMICHELEElectrical103/21/2026
WCK ELECTRIC CORP.Electrical103/22/2026
CERTIFIED SERVICES ANDPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AM ENGINEERING SERVICES P7975307/28/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCERTIFIED SERVICES AND03/29/2022
DOB NOWGeneral ConstructionSigned-offDFE CONTRACTOR LLC03/25/2022
DOB NOWGeneral ConstructionSigned-offDFE CONTRACTOR LLC03/25/2022
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/22/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/03/2022Fail-Final General Construction Non-Directive 14FailView ↗
06/01/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
07/28/2021Fire-Resistant Penetrations and JointsAlbert Munozspecial
05/28/2021Air barrier - visual inspectionAlbert Munozenergy_progress
05/27/2021MasonryAlbert Munozspecial
05/27/2021Energy Code Compliance InspectionsAlbert Munozprogress
05/27/2021Fire-Resistance Rated ConstructionAlbert Munozprogress
05/27/2021Structural Wood FrameAlbert Munozprogress
05/27/2021Lighting in dwelling unitsAlbert Munozenergy_progress
05/27/2021Insulation placement and R valuesAlbert Munozenergy_progress
05/27/2021Fenestration and door U-factor and product ratingsAlbert Munozenergy_progress
05/27/2021Fire-Resistant Penetrations and JointsAlbert Munozspecial
05/27/2021Concrete - Cast-In-PlaceAlbert Munozspecial
05/21/2021FinalAlbert Munozprogress
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/27/2026Q00526618-I1Request digital key ↗
08/25/2026Q00565695-I1Request digital key ↗
08/25/2026Q00565695-S1Request digital key ↗
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
01/07/2021421776625Open ↗
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature8
08/24/2026Q00526618-I1Open ↗
08/24/2026Q00526618-I1Open ↗
08/24/2026Q00526618-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/27/2026Q00565695-I1Open ↗
08/24/2026Q00526618-I1Open ↗
08/24/2026Q00526618-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026Q00526618-I1Open ↗
08/13/2026Q00565695-I1Open ↗
08/13/2026Q00565695-S1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/27/2026Q00526618-I1Open ↗
08/13/2026Q00565695-I1Open ↗
08/13/2026Q00565695-S1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/07/2021421776625Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00526618-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
02/07/2021421776625Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
02/07/2021421776625Open ↗
▸Filing & Intake Forms2
▸BISBOROUGH INTAKE FORM1
01/07/2021421776625Open ↗
▸BISEFILING COVER SHEET1
01/07/2021421776625Open ↗