Condo, residential unit in elevator building
Malibu Condominium
51-33 GOLDSMITH STREET · BIN 4057301
💬 Discuss this project
1962Year Built
6Stories
R4Building Class
R6BZoning
35,567 sfGross Floor Area
62Units
LL97 CoveredRent Stabilized0 Open ViolationsFISP: SAFE
Condo, residential unit in elevator building · 13,000 sf lot · 2.74 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
RoofUnder Construction5p · 2 filings · 7 docs
Floor 1Under Construction1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DOMNITCH MANAGEMENT809/07/2026
PARK CONTRACTING GROUP308/29/2026
JASCO407/08/2026
MALIBU CONDOMINIUM1403/22/2026
MARTIN DOMHITCH/MALIBU CO103/22/2026
PJB CONSTRUCTION203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALWAYS FAST SERVICES CORP208/05/2026
CATALDO ENGINEERING, P.C.106/25/2026
SRL ASSOCIATES104/28/2023
SYED ENGINEERING, P.C.109/28/2021
WRG ENGINEERING, P.C.107/26/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DEPARTMENT OF DESIGN & CONSTRUCTION203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BELLET CONSTRUCTION CO.INGeneral Contractor207/08/2026
PARK CONTRACTING GROUPGeneral Contractor208/06/2026
BRW CONTRACTING INCGeneral Contractor109/07/2026
JASCO, INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CATALDO ENGINEERING, P.C.2174106/25/2026
AA BUILDING & INSPECTION1519104/28/2023
FRAME DESIGN AND CONSTRUC7971104/28/2023
WRG ENGINEERING, P.C.4403107/26/2021
Building Lifecycle
All (80)Filed (6)Permit Issued (6)Signed Off (3)Facade (FISP) (15)Violation (32)Objection (8)Special Inspection (10)
09/03/2026
Permit issued — General Construction
Q01421494-I1-GC
08/05/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q01440458-I1
08/05/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01440459-I1
08/05/2026
Permit issued — Sidewalk Shed
Q01440458-I1-SH
08/05/2026
Permit issued — Supported Scaffold
Q01440459-I1-SF
06/25/2026
Filed — Alteration
Q01421494-I1
06/24/2026
Special inspection requirement — Final
Thomas Cataldo
06/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
Thomas Cataldo
11/21/2025
Violation issued (HPD, closed)
I
01/03/2024
Signed off — Alteration
Install new cap sheet roof on the garage. Existing roof membrane to remain in place. Change existing roof drains.
Q00857719-I1
11/24/2023
Violation issued (HPD, closed)
I
07/06/2023
Permit issued — General Construction
Q00857719-I1-GC
05/26/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
SURESH WARREN
05/03/2023
Objection raised — Energy
05/03/2023
Objection resolved — Addressed
05/03/2023
Objection raised — Admin
05/03/2023
Objection resolved — Addressed
05/03/2023
Objection raised — Scope
05/03/2023
Objection resolved — Addressed
05/03/2023
Objection raised — Inspections
05/03/2023
Objection resolved — Addressed
04/28/2023
Filed — Alteration
Install new cap sheet roof on the garage. Existing roof membrane to remain in place. Change existing roof drains.
Q00857719-I1
04/12/2023
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
04/11/2023
Special inspection requirement — Final
Sean Lenahan
07/28/2022
Signed off — Alteration
Q00599007-I1
07/25/2022
Signed off — Alteration
Facade Restoration Project to address LL11 deficiencies
Q00557327-I1
07/18/2022
Cycle 9 facade report signed — SAFE
06/20/2022
Cycle 9 facade report submitted
06/15/2022
Cycle 9 facade inspection completed
03/14/2022
Cycle 9 facade report signed — UNSAFE
02/18/2022
Cycle 9 facade report submitted
02/18/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/18/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/16/2022
Cycle 9 facade inspection completed
09/29/2021
Permit issued — Sidewalk Shed
Q00599007-I1-SH
09/28/2021
Filed — Alteration
Q00599007-I1
09/23/2021
Special inspection requirement — Final
RAFI HAMID
08/24/2021
Permit issued — General Construction
Q00557327-I1-GC
07/26/2021
Filed — Alteration
Facade Restoration Project to address LL11 deficiencies
Q00557327-I1
07/21/2021
Special inspection requirement — Insulation placement and R values
Winston Garcia
07/21/2021
Special inspection requirement — Final
Winston Garcia
07/19/2021
Special inspection requirement — Masonry
Winston Garcia
07/19/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Winston Garcia
01/19/2017
Cycle 8 facade report submitted
01/19/2017
Cycle 8 facade report signed — SWARMP
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/05/2016
Cycle 8 facade inspection completed
06/10/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/09/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/24/2014
Violation issued (HPD, closed)
B
12/24/2014
Violation issued (HPD, closed)
B
12/24/2014
Violation issued (HPD, closed)
C
05/30/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/30/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/22/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/03/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/15/2012
Cycle 7 facade report submitted
02/09/2012
Cycle 7 facade report signed — SAFE
02/06/2012
Cycle 7 facade inspection completed
01/01/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBRW CONTRACTING INC09/03/2026
DOB NOWSidewalk ShedPermit IssuedPARK CONTRACTING GROUP08/05/2026
DOB NOWSupported ScaffoldPermit IssuedPARK CONTRACTING GROUP08/05/2026
DOB NOWGeneral ConstructionSigned-offBELLET CONSTRUCTION CO.IN07/06/2023
DOB NOWSidewalk ShedSigned-offJASCO, INC09/29/2021
DOB NOWGeneral ConstructionSigned-offBELLET CONSTRUCTION CO.IN08/24/2021
BISFSISSUEDSTAR INDUSTRIAL SERVICE10/11/2017
BISOTISSUEDLAUNDRO COMBUSTION CORP03/02/2017
BISOTISSUEDJACK PICCINNI INC01/21/2016
BISFSISSUEDAPPROVED OIL CO OF BKLYN11/12/2014
BISPLISSUEDJOSEPH FERRIGNO P&H CO11/12/2014
BISOTISSUEDBELLET CONSTRUCTION CO.IN06/15/2011
BISEQISSUEDP.J.B. CONTRACTING CORP05/06/2011
BISBLISSUEDABILENE, INC03/15/2005
2 projects · most recent 08/05/2026
FiledStatusContractorScope
08/05/2026Permit IssuedRICHARD NEU—
09/29/2021Permit IssuedRICHARD NEU—
2 projects · most recent 08/05/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
08/05/2026Permit IssuedPARK CONTRACTING GROUPSidewalk Shed
08/05/2026Permit IssuedPARK CONTRACTING GROUPScaffold
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
06/24/2026FinalThomas Cataldoprogress
06/24/2026Tenant Protection Plan ComplianceThomas Cataldospecial
05/26/2023Structural Stability – Alterations of existing buildingsSURESH WARRENspecial
04/12/2023Tenant Protection Plan ComplianceYounes Abouyaalaspecial
04/11/2023FinalSean Lenahanprogress
09/23/2021FinalRAFI HAMIDprogress
07/21/2021Insulation placement and R valuesWinston Garciaenergy_progress
07/21/2021FinalWinston Garciaprogress
07/19/2021MasonryWinston Garciaspecial
07/19/2021Fire-Resistant Penetrations and JointsWinston Garciaspecial
▾Documents — 103 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/27/2026Q00557327-I1Request digital key ↗
08/27/2026Q00599007-I1Request digital key ↗
08/16/2026Q01421494-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits16
▸BISWORK PERMIT APPLICATION9
10/19/2017440173492Open ↗
03/09/2017440282800Open ↗
03/09/2017440282800Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
10/19/2017440173492Open ↗
02/25/2017440282800Open ↗
01/19/2016440282800Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications31
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
10/02/2017440282800Open ↗
02/25/2017440282800Open ↗
07/13/2012420352308Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026Q00857719-I1Open ↗
08/16/2026Q01421494-I1Open ↗
08/16/2026Q01440459-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/28/2026Q00599007-I1Open ↗
08/27/2026Q01421494-I1Open ↗
08/27/2026Q00557327-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/27/2026Q01421494-I1Open ↗
08/27/2026Q00557327-I1Open ↗
08/27/2026Q00557327-I1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
01/19/2016440282800Open ↗
11/10/2014440173492Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
01/19/2016440282800Open ↗
11/10/2014440173492Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
02/25/2017440282800Open ↗
05/06/2011420352308Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
01/19/2016440282800Open ↗
11/10/2014440173492Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/06/2011420352308Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
01/19/2016440282800Open ↗
11/10/2014440173492Open ↗
▸BISSCHEDULE B - PLUMBING1
11/10/2014440173492Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
02/19/2015440173492Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
02/19/2015440173492Open ↗
▸Environmental & Asbestos6
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
01/19/2016440282800Open ↗
11/10/2014440173492Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/14/2026Q00857719-I1Open ↗
08/13/2026Q00557327-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
05/06/2011420352308Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/05/2011420302087Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
12/26/2017440173492Open ↗
10/02/2017440282800Open ↗
02/25/2017440282800Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
12/26/2017440173492Open ↗
10/02/2017440282800Open ↗
04/03/2012420302087Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
01/19/2016440282800Open ↗
11/10/2014440173492Open ↗
▸BISTECHNICAL REPORT: ENERGY2
04/03/2012420302087Open ↗
03/23/2011420302087Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
01/19/2016440282800Open ↗
11/10/2014440173492Open ↗
▸BISTR8: Energy Code Progress Inspections1
04/03/2012420302087Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00557327-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/19/2016440282800Open ↗
11/10/2014440173492Open ↗
▸Approvals, Objections & Sign-offs11
▸BISLETTERS - SUPPORTING DOCUMENTATION5
12/26/2017440173492Open ↗
03/09/2017440282800Open ↗
03/09/2017440282800Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
12/26/2017440173492Open ↗
10/26/2017440282800Open ↗
07/13/2012420352308Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
05/06/2011420352308Open ↗
01/05/2011420302087Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
12/26/2017440173492Open ↗
10/02/2017440282800Open ↗
02/25/2017440282800Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms7
▸BISEFILING JOB APPLICATION COVER SHEET2
01/19/2016440282800Open ↗
11/10/2014440173492Open ↗
▸BISEFILING COVER SHEET2
05/06/2011420352308Open ↗
01/05/2011420302087Open ↗
▸BISBOROUGH INTAKE FORM2
12/26/2017440173492Open ↗
10/26/2017440282800Open ↗
▸BISADDITIONAL INFORMATION1
03/06/2017440282800Open ↗