← Back
Two stories - detached, small or mid-size
52-41 72 PLACE
QUEENS · Maspeth · BIN 4057682
💬 Discuss this project
1925Year Built
1Stories
A1Building Class
R4-1Zoning
2,200 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · Owner of record: ECO VISTA DEVELOPMENT, LLC · 2,500 sf lot · 0.88 FAR built · Flood zone X
Locations of Work
StructuralElectricalFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 2 filings · 20 docs
Floor 2Under Construction1 filing · 20 docs
Floor 1Under Construction1 filing · 20 docs
CellarUnder Construction1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ECO VISTA DEVELOPMENT3309/15/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOM PETERSEN ARCHITECT, LLC108/24/2026
FANG ARCHITECT607/29/2026
TIMES BUILDINGS ENGINEERING SERVICE112/07/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FANG ARCHITECT203/21/2026
MEIYUN CHEN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW HO XIN DEVELOPMENT INCGeneral Contractor1009/07/2026
GOLDEN TIGER CONST. INCGeneral Contractor204/09/2026
SOLAR CONTRACTING LLCGeneral Contractor109/01/2026
TRI STATE PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854108/24/2026
FANG ARCHITECT5513407/29/2026
TRIANGLE INSPECTION & TES7495202/03/2026
Building Lifecycle
All (60)Filed (9)Permit Issued (13)Signed Off (2)Inspection (6)Special Inspection (30)
09/11/2026
Signed off — New Building
PLUMBING & SPRINKLER WORK FOR 2-STORY 2-FAMILY BUILDING.
Q01199903-S4
09/03/2026
Permit issued — Curb Cut
Q01199903-S2-CC
08/31/2026
Permit issued — Solar
Q01450112-I1-SL
08/24/2026
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.
Q01450112-I1
08/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
08/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
08/23/2026
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
08/23/2026
Special inspection requirement — Final
TOM PETERSEN
08/03/2026
Permit issued — Mechanical Systems
Q01199903-S4-MS
07/29/2026
Filed — New Building
PLUMBING & SPRINKLER WORK FOR 2-STORY 2-FAMILY BUILDING.
Q01199903-S4
07/23/2026
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
DEZHANG FANG
07/23/2026
Special inspection requirement — Ventilation and air distribution system
DEZHANG FANG
06/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/09/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/19/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/11/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
05/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/07/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/12/2026
Permit issued — Foundation
Q01199903-I1-EA
03/11/2026
Permit issued — Foundation
Q01199903-I1-GC
03/10/2026
Permit issued — Foundation
Q01199903-I1-ST
02/06/2026
Special inspection requirement — Heating Systems
DEZHANG FANG
02/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
02/06/2026
Special inspection requirement — Maintenance information
DEZHANG FANG
02/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
02/06/2026
Special inspection requirement — Duct leakage testing, insulation and design
DEZHANG FANG
02/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
02/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
02/06/2026
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
02/03/2026
Filed — New Building
PLUMBING & SPRINKLER WORK FOR 2-STORY 2-FAMILY BUILDING.
Q01199903-P1
02/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
02/02/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
DEZHANG FANG
02/02/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
02/02/2026
Special inspection requirement — Sprinkler Systems
DEZHANG FANG
02/02/2026
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
02/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
02/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
02/02/2026
Special inspection requirement — Maintenance information
DEZHANG FANG
02/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
01/15/2026
Permit issued — Plumbing
Q01199903-S3-PL
12/24/2025
Filed — New Building
PLUMBING & SPRINKLER WORK FOR 2-STORY 2-FAMILY BUILDING.
Q01199903-S2
12/16/2025
Permit issued — Foundation
Q01199903-I1-FO
12/12/2025
Permit issued — Structural
Q01199903-I1-GC
10/21/2025
Permit issued — Construction Fence
Q01180614-I1-FN
10/09/2025
Filed — New Building
PLUMBING & SPRINKLER WORK FOR 2-STORY 2-FAMILY BUILDING.
Q01199903-S3
09/22/2025
Special inspection requirement — Mechanical Systems
DEZHANG FANG
09/22/2025
Special inspection requirement — Final
DEZHANG FANG
05/19/2025
Special inspection requirement — Electric vehicle service equipment requirements
DEZHANG FANG
05/19/2025
Special inspection requirement — Interior lighting power
DEZHANG FANG
04/14/2025
Filed — New Building
PLUMBING & SPRINKLER WORK FOR 2-STORY 2-FAMILY BUILDING.
Q01199903-I1
04/08/2025
Special inspection requirement — Maintenance information
DEZHANG FANG
04/08/2025
Special inspection requirement — Metering
DEZHANG FANG
04/08/2025
Special inspection requirement — Protection of exposed foundation insulation
DEZHANG FANG
02/27/2025
Signed off — Full Demolition
file temporary construction fence.
Q01094147-I1
02/24/2025
Permit issued — Construction Fence
Q01180614-I1-FN
02/14/2025
Filed — Alteration
INSTALL TEMPORARY CONSTRUCTION FENCE.
Q01180614-I1
12/12/2024
Permit issued — Full Demolition
Q01094147-I1-FD
12/11/2024
Permit issued — Construction Fence
Q01094147-S1-FN
12/07/2024
Filed — Full Demolition
file temporary construction fence.
Q01094147-S1
08/21/2024
Filed — Full Demolition
file temporary construction fence.
Q01094147-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offNEW HO XIN DEVELOPMENT INC09/03/2026
DOB NOWSolarPermit IssuedSOLAR CONTRACTING LLC08/31/2026
DOB NOWMechanical SystemsSigned-offNEW HO XIN DEVELOPMENT INC08/03/2026
DOB NOWFoundationSigned-offNEW HO XIN DEVELOPMENT IN03/12/2026
DOB NOWFoundationPermit IssuedNEW HO XIN DEVELOPMENT IN03/11/2026
DOB NOWFoundationSigned-offNEW HO XIN DEVELOPMENT IN03/10/2026
DOB NOWPlumbingSigned-offDW PLUMBING INC01/15/2026
DOB NOWFoundationSigned-offGOLDEN TIGER CONST. INC12/16/2025
DOB NOWStructuralPermit IssuedGOLDEN TIGER CONST. INC12/12/2025
DOB NOWConstruction FenceSigned-offNEW HO XIN DEVELOPMENT IN10/21/2025
DOB NOWConstruction FenceSigned-offNEW HO XIN DEVELOPMENT IN02/24/2025
DOB NOWFull DemolitionSigned-offNEW HO XIN DEVELOPMENT IN12/12/2024
DOB NOWConstruction FenceSigned-offNEW HO XIN DEVELOPMENT IN12/11/2024
1 project · most recent 07/29/2026
Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
07/29/2026Signed-offTRI STATE PLBG & HTG INCPlumbing-Sprinkler, Storm, Water/Sanitary
2 projects · most recent 08/23/2026
General Wiring
FiledStatusContractorScope
08/23/2026CompleteSOLAR ELEC CONTRACTNG LLC3 meters
04/05/2026CompleteCL ELECTRICAL CORPGeneral Wiring
2 projects · most recent 02/14/2025
Fence
FiledStatusContractorScope
02/14/2025Signed-offNEW HO XIN DEVELOPMENT INFence
12/07/2024Signed-offNEW HO XIN DEVELOPMENT INFence
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/15/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/09/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/19/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/11/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
05/08/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/07/2026Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
08/23/2026Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
08/23/2026Fire-Resistant Penetrations and JointsTOM PETERSENspecial
08/23/2026Energy Code Compliance InspectionsTOM PETERSENprogress
08/23/2026FinalTOM PETERSENprogress
07/23/2026Exhaust and Vent Systems in Plenums and DuctsDEZHANG FANGspecial
07/23/2026Ventilation and air distribution systemDEZHANG FANGenergy_progress
02/06/2026Heating SystemsDEZHANG FANGspecial
02/06/2026Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
02/06/2026Maintenance informationDEZHANG FANGenergy_progress
02/06/2026HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
02/06/2026Duct leakage testing, insulation and designDEZHANG FANGenergy_progress
02/06/2026HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
02/06/2026HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
02/06/2026Energy Code Compliance InspectionsDEZHANG FANGprogress
02/02/2026HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
02/02/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDEZHANG FANGspecial
02/02/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
02/02/2026Sprinkler SystemsDEZHANG FANGspecial
02/02/2026Energy Code Compliance InspectionsDEZHANG FANGprogress
02/02/2026Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
02/02/2026HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
02/02/2026Maintenance informationDEZHANG FANGenergy_progress
02/02/2026HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
09/22/2025Mechanical SystemsDEZHANG FANGspecial
09/22/2025FinalDEZHANG FANGprogress
Latest 25 of 47.
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/25/2026Q01450112-I1Request digital key ↗
08/21/2026Q01094147-S1Request digital key ↗
08/21/2026Q01094147-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/18/2026Q01199903-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/18/2026Q01199903-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/18/2026Q01199903-I1Open ↗
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026Q01450112-I1Open ↗
09/23/2026Q01450112-I1Open ↗
08/28/2026Q01199903-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/25/2026Q01450112-I1Open ↗
08/21/2026Q01094147-S1Open ↗
08/18/2026Q01199903-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026Q01450112-I1Open ↗
09/23/2026Q01450112-I1Open ↗
08/28/2026Q01199903-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWCONTRACTOR SEAL & SIGNATURE1
08/21/2026Q01094147-I1Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWElectric Cut-Off1
08/13/2026Q01094147-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026Q01094147-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026Q01094147-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026Q01094147-I1Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/18/2026Q01199903-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/18/2026Q01199903-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/18/2026Q01199903-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026Q01094147-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026Q01094147-I1Open ↗
▸Other Documents8
▸DOB NOWProperty Ownership Certification2
08/21/2026Q01094147-I1Open ↗
08/18/2026Q01199903-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/18/2026Q01199903-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026Q01094147-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026Q01094147-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026Q01094147-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/18/2026Q01199903-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/18/2026Q01199903-I1Open ↗