← Back
Office with commercial, 1-6 stories
46-11 54 AVENUE
QUEENS · BIN 4058868
💬 Discuss this project
2005Year Built
4Stories
O5Building Class
M2-1Zoning
—Gross Floor Area
1Units
0 Open Violations
Office with commercial, 1-6 stories · Owner of record: 46-17 54TH ROAD REAL · 3.2 FAR built · Flood zone X
Locations of Work
Mechanical
Cellar3p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DANNY 2 CLEANERS507/08/2026
46-17 54TH ROAD REALTY403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M B KIM ARCHITECT P C212/09/2019
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PROSPECT ENGINEERING P.C.2775212/09/2019
Building Lifecycle
All (20)Filed (2)Permit Issued (2)Signed Off (1)Violation (11)Special Inspection (4)
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/01/2021
Signed off — Alteration
NEW INSTALLATION OF OIL-FIRED HIGH PRESSURE STEAM BOILER AND (2) 275 GALLONS OIL STORAGE TANKS AT CELLAR AT BOILER ROOM AT CELLAR AS PER PLAN. EXISTING VENTS UNDER DOB APPLICATION (JOB #: 421371036) TO BE CONNECTED TO NEW OIL FIRED HIGH PRESSURE BOILER.
Q00227965-I1
01/02/2020
Violation issued (ECB, closed)
Plumbing
12/10/2019
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
JUSTIN KIM
12/10/2019
Special inspection requirement — HVAC and service water heating equipment
MOON KIM
12/10/2019
Special inspection requirement — HVAC and service water heating system controls
MOON KIM
12/10/2019
Special inspection requirement — Maintenance information
MOON KIM
12/09/2019
Filed — Alteration
NEW INSTALLATION OF OIL-FIRED HIGH PRESSURE STEAM BOILER AND (2) 275 GALLONS OIL STORAGE TANKS AT CELLAR AT BOILER ROOM AT CELLAR AS PER PLAN. EXISTING VENTS UNDER DOB APPLICATION (JOB #: 421371036) TO BE CONNECTED TO NEW OIL FIRED HIGH PRESSURE BOILER.
Q00227965-P1
11/20/2019
Permit issued — Boiler Equipment
Q00227965-I1-BE
09/16/2019
Permit issued — Boiler Equipment
Q00227965-I1-BE
09/14/2019
Filed — Alteration
NEW INSTALLATION OF OIL-FIRED HIGH PRESSURE STEAM BOILER AND (2) 275 GALLONS OIL STORAGE TANKS AT CELLAR AT BOILER ROOM AT CELLAR AS PER PLAN. EXISTING VENTS UNDER DOB APPLICATION (JOB #: 421371036) TO BE CONNECTED TO NEW OIL FIRED HIGH PRESSURE BOILER.
Q00227965-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedWASOFF PLBG. & UTL.CO INC11/20/2019
DOB NOWBoiler EquipmentPermit IssuedWASOFF PLBG. & UTL.CO INC09/16/2019
BISPLISSUEDWASOFF PLBG & UTILITY CO08/08/2022
BISPLISSUEDWASOFF PLBG & UTILITY CO06/30/2021
BISMHISSUEDM.B.KIM,ARCHITECT,P.C03/12/2019
BISOTISSUEDM.B.KIM,ARCHITECT,P.C01/25/2019
BISPLISSUEDWASOFF PLBG & UTILITY CO01/25/2019
BISPLISSUEDI.M.P. PLBG. & HTG. CORP09/29/2006
BIS—ISSUEDKINGDOM ASSOCIATES INC09/12/2006
BIS—ISSUEDKINGDOM ASSOCIATES INC02/08/2006
BISEQISSUEDKINGDOM ASSOCIATES INC02/08/2006
2 projects · most recent 07/15/2019
General Wiring
FiledStatusContractorScope
07/15/2019CompleteJONG HYUN KIM—
03/18/2019CompleteJONG HYUN KIMGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
12/10/2019Fuel-Oil Storage and Fuel-Oil Piping SystemsJUSTIN KIMspecial
12/10/2019HVAC and service water heating equipment MOON KIMenergy_progress
12/10/2019HVAC and service water heating system controls MOON KIMenergy_progress
12/10/2019Maintenance informationMOON KIMenergy_progress
▾Documents — 112 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Boiler Equipment2
08/28/2026Q00227965-I1Request digital key ↗
08/15/2026Q00227965-P1Request digital key ↗
▸Applications & Permits33
▸BISPLAN / WORK APPROVAL APPLICATION27
05/25/2023421371036Open ↗
05/23/2023421371036Open ↗
06/16/2022421371036Open ↗
Showing 3 of 27 on file for this type
▸BISWORK PERMIT APPLICATION5
08/17/2021421371036Open ↗
03/20/2019421371036Open ↗
01/28/2019421371036Open ↗
Showing 3 of 5 on file for this type
▸BISINTENT TO REVOKE APPROVAL/PERMIT1
02/13/2020421371036Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISZONING DIAGRAM1
02/12/2021440625129Open ↗
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature3
09/23/2026Q00227965-I1Open ↗
09/23/2026Q00227965-I1Open ↗
09/23/2026Q00227965-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/19/2020440625129Open ↗
01/28/2019421371036Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
01/28/2019421371036Open ↗
01/28/2019421371036Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/28/2026Q00227965-I1Open ↗
08/13/2026Q00227965-P1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/19/2020440625129Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/19/2020440625129Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/28/2019421371036Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026Q00227965-I1Open ↗
▸Trade Schedules & Equipment18
▸BISSCHEDULE B - PLUMBING7
06/14/2022421371036Open ↗
06/13/2022421371036Open ↗
06/07/2022421371036Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
01/14/2020421371036Open ↗
01/13/2020421371036Open ↗
11/22/2019421371036Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
11/21/2019421371036Open ↗
09/20/2019421371036Open ↗
04/23/2019421371036Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
02/12/2021440625129Open ↗
09/19/2020440625129Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
09/19/2020440625129Open ↗
01/28/2019421371036Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/28/2026Q00227965-I1Open ↗
08/13/2026Q00227965-P1Open ↗
▸Energy Compliance8
▸BISAS-BUILT ENERGY ANALYSIS2
05/26/2023421371036Open ↗
05/26/2023421371036Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
05/26/2023421371036Open ↗
09/19/2020440625129Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/19/2020440625129Open ↗
▸BISNYCECC ANALYSIS1
09/19/2020440625129Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/28/2019421371036Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00227965-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
05/26/2023421371036Open ↗
09/19/2020440625129Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/19/2020440625129Open ↗
09/20/2019421371036Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/27/2023421371036Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
12/16/2020440625129Open ↗
▸BISLetter of Intent to Revoke1
05/20/2021421371036Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
01/28/2019421371036Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
05/26/2023421371036Open ↗
09/19/2020440625129Open ↗
04/23/2019421371036Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms17
▸BISADDITIONAL INFORMATION13
05/25/2023421371036Open ↗
06/16/2022421371036Open ↗
03/23/2022421371036Open ↗
Showing 3 of 13 on file for this type
▸BISBOROUGH INTAKE FORM2
08/17/2021421371036Open ↗
01/13/2020421371036Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/19/2020440625129Open ↗
▸BISEFILING COVER SHEET1
01/28/2019421371036Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
09/19/2020440625129Open ↗