← Back
Two family frame
56-09 62 AVENUE
QUEENS · BIN 4059498
💬 Discuss this project
1930Year Built
2Stories
B2Building Class
R4Zoning
2,000 sfGross Floor Area
2Units
Two family frame · 2,800 sf lot · 0.71 FAR built · Flood zone X
Locations of Work
Architecture
Roof2p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOM PETERSEN ARCHITECT, LLC105/01/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CENTURION SOLAR ENERGYGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854105/01/2024
Building Lifecycle
All (12)Filed (1)Permit Issued (1)Signed Off (1)Objection (4)Special Inspection (5)
11/26/2024
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
Q01040284-I1
05/29/2024
Permit issued — Solar
Q01040284-I1-SL
05/16/2024
Objection resolved — Addressed
05/16/2024
Objection resolved — Addressed
05/08/2024
Objection raised — Other
05/08/2024
Objection raised — Other
05/01/2024
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
Q01040284-I1
04/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
04/23/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
04/23/2024
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
04/23/2024
Special inspection requirement — Final
TOM PETERSEN
04/23/2024
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offCENTURION SOLAR ENERGY05/29/2024
1 project · most recent 05/01/2024
FiledStatusContractorScope
05/01/2024CompleteBERGER QUALITY ELEC'L CON—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/23/2024Fire-Resistant Penetrations and JointsTOM PETERSENspecial
04/23/2024Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
04/23/2024Energy Code Compliance InspectionsTOM PETERSENprogress
04/23/2024FinalTOM PETERSENprogress
04/23/2024Air barrier - visual inspectionTOM PETERSENenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/22/2026Q01040284-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/29/2026Q01040284-I1Open ↗
08/29/2026Q01040284-I1Open ↗
08/29/2026Q01040284-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026Q01040284-I1Open ↗
08/29/2026Q01040284-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01040284-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01040284-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01040284-I1Open ↗