← Back
Two family frame
59-39 57 DRIVE
QUEENS · BIN 4060133
💬 Discuss this project
1920Year Built
2Stories
B2Building Class
R4-1Zoning
1,760 sfGross Floor Area
2Units
Two family frame · 2,800 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
Nothing on file for this building.
Building Lifecycle
All (15)Filed (1)Permit Issued (6)Signed Off (1)Inspection (1)Special Inspection (6)
06/16/2026
Signed off — Alteration
Q00523472-I1
01/16/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
10/20/2025
Permit issued — General Construction
Q00523472-I1-GC-CX
11/27/2024
Permit issued — General Construction
Q00523472-I1-GC-CX
12/04/2023
Permit issued — General Construction
Q00523472-I1-GC-CX
11/29/2022
Permit issued — Structural
Q00523472-I1-GC-CX
07/20/2022
Permit issued — General Construction
Q00523472-I1-GC-CX
07/26/2021
Permit issued — Structural
Q00523472-I1-GC-CX
06/04/2021
Filed — Alteration
Q00523472-I1
05/17/2021
Special inspection requirement — Structural Cold-Formed Steel
JOHN SEMIOLI
05/17/2021
Special inspection requirement — Structural Steel - Welding
JOHN SEMIOLI
05/17/2021
Special inspection requirement — Final
Michael Mallia
05/17/2021
Special inspection requirement — Fenestration air leakage
Michael Mallia
05/17/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
Michael Mallia
05/17/2021
Special inspection requirement — Interior lighting power
Michael Mallia
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DIPROPERZIO & MALLIA ARCHITECTS,LLP106/04/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
G. FAZIO CONSTRUCTION COGeneral Contractor907/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C.M. TESTING LABORATORY,1352106/04/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offG. FAZIO CONSTRUCTION CO10/20/2025
DOB NOWGeneral ConstructionSigned-offG. FAZIO CONSTRUCTION CO11/27/2024
DOB NOWGeneral ConstructionSigned-offG. FAZIO CONSTRUCTION CO12/04/2023
DOB NOWStructuralSigned-offG. FAZIO CONSTRUCTION CO11/29/2022
DOB NOWGeneral ConstructionSigned-offG. FAZIO CONSTRUCTION CO07/20/2022
DOB NOWStructuralSigned-offG. FAZIO CONSTRUCTION CO07/26/2021
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/16/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
05/17/2021Structural Cold-Formed SteelJOHN SEMIOLIspecial
05/17/2021Structural Steel - WeldingJOHN SEMIOLIspecial
05/17/2021FinalMichael Malliaprogress
05/17/2021Fenestration air leakageMichael Malliaenergy_progress
05/17/2021Fenestration and door U-factor and product ratingsMichael Malliaenergy_progress
05/17/2021Interior lighting powerMichael Malliaenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/27/2026Q00523472-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026Q00523472-I1Open ↗
08/29/2026Q00523472-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026Q00523472-I1Open ↗
08/29/2026Q00523472-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q00523472-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q00523472-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/27/2026Q00523472-I1Open ↗