← Back
Two family converted from one family
54-26 80 STREET
QUEENS · BIN 4062924
💬 Discuss this project
1940Year Built
1Stories
B3Building Class
R4Zoning
956 sfGross Floor Area
2Units
2 Open Violations ▸
Two family converted from one family · 2,200 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 20 docs
Floor 2Under Construction15p · 3 filings · 20 docs
Floor 1Under Construction14p · 2 filings · 20 docs
CellarUnder Construction9p · 2 filings · 20 docs
Sub-Basement7p · 1 filing · 19 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAYSIDE ENGINEERING PC108/11/2025
ZHENG & ASSOCIATES LLC510/23/2024
JENG ARCHITECT112/03/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ZHENG & ASSOCIATES LLC603/21/2026
YBL NY203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW YORK CONSTRUCTION MA*General Contractor509/12/2026
HP SERVICES INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZHENG & ASSOCIATES LLC7330410/23/2024
JENG ARCHITECT8156112/03/2023
Building Lifecycle
All (72)Filed (7)Permit Issued (6)Signed Off (1)Violation (4)Inspection (2)Objection (22)Special Inspection (30)
09/10/2026
Permit issued — General Construction
Q00843956-I1-GC-CX
04/17/2026
Signed off — Alteration
EMERGENCY SHORING INSTALLATION TO SECURE COMPROMISED PARTY WALL BY ADJACENT PROPERTY OWNER FOR UNPERMITTED CAST-IN-PLACE CONCRETE WALL AGAINST EXISTING PARTY WALL AS PER DOB EMERGENCY WORK ORDER ISSUED ON 11-30-2023
Q00970787-I1
03/11/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/09/2026
Permit issued — Construction Fence
Q00843971-I1-FN
03/05/2026
Violation issued (ECB, closed)
Construction
01/09/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/12/2025
Permit issued — Structural
Q00843956-I1-GC-CX
08/22/2025
Objection raised — Scope
08/22/2025
Objection raised — Energy
08/22/2025
Objection raised — Other
08/22/2025
Objection raised — Other
08/22/2025
Objection raised — Scope
08/22/2025
Objection raised — Scope
08/11/2025
Filed — Alteration
Q01267331-I1
08/11/2025
Special inspection requirement — Final
11/05/2024
Objection raised — Zoning
11/05/2024
Objection resolved — Addressed
10/23/2024
Filed — Alteration CO
HORIZONTAL & VERTICAL ENLARGEMENT FOR (2) FAMILY DWELLING UNIT. OBTAIN NEW C OF O.
Q00843956-P5
07/12/2024
Special inspection requirement — Structural Steel - Details
Jinfar Liu
07/12/2024
Special inspection requirement — Wood – Metal-Plate-Connected Trusses
Jinfar Liu
07/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
07/12/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Jinfar Liu
07/12/2024
Special inspection requirement — Structural Steel - High Strength Bolting
Jinfar Liu
07/12/2024
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
07/12/2024
Special inspection requirement — Structural Wood Frame
Jinfar Liu
07/12/2024
Special inspection requirement — Fire-Resistance Rated Construction
Jinfar Liu
07/12/2024
Special inspection requirement — Footing and Foundation
Jinfar Liu
07/12/2024
Special inspection requirement — Final
Jinfar Liu
07/12/2024
Special inspection requirement — Fenestration areas
Jinfar Liu
07/12/2024
Special inspection requirement — Interior lighting power
Jinfar Liu
07/12/2024
Special inspection requirement — Metering
Jinfar Liu
07/12/2024
Special inspection requirement — Insulation placement and R values
Jinfar Liu
07/12/2024
Special inspection requirement — Fenestration air leakage
Jinfar Liu
07/12/2024
Special inspection requirement — HVAC-R and service water heating system controls
Jinfar Liu
07/12/2024
Special inspection requirement — Air barrier - visual inspection
Jinfar Liu
07/12/2024
Special inspection requirement — Concrete - Cast-In-Place
Jinfar Liu
07/12/2024
Special inspection requirement — Lighting controls
Jinfar Liu
07/12/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Jinfar Liu
07/12/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Jinfar Liu
07/12/2024
Special inspection requirement — HVAC-R and service water heating equipment
Jinfar Liu
07/12/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jinfar Liu
07/12/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
06/18/2024
Filed — Alteration CO
HORIZONTAL & VERTICAL ENLARGEMENT FOR (2) FAMILY DWELLING UNIT. OBTAIN NEW C OF O.
Q00843956-P4
06/03/2024
Special inspection requirement — Final
Jinfar Liu
06/03/2024
Special inspection requirement — Concrete - Cast-In-Place
Jinfar Liu
06/03/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Jinfar Liu
06/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
06/03/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jinfar Liu
01/15/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/06/2023
Permit issued — General Construction
Q00970787-I1-GC
12/03/2023
Filed — Alteration
EMERGENCY SHORING INSTALLATION TO SECURE COMPROMISED PARTY WALL BY ADJACENT PROPERTY OWNER FOR UNPERMITTED CAST-IN-PLACE CONCRETE WALL AGAINST EXISTING PARTY WALL AS PER DOB EMERGENCY WORK ORDER ISSUED ON 11-30-2023
Q00970787-I1
11/27/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/25/2023
Permit issued — Plumbing
Q00843962-I1-PL
09/19/2023
Filed — Alteration
INSTALL PLUMBING FIXTURES AS SHOWN ON PLAN @ O.S.P, BASEMENT, 1ST & 2ND FLOOR.
Q00843962-I1
09/12/2023
Permit issued — Construction Fence
Q00843971-I1-FN
06/23/2023
Objection raised — Scope
06/23/2023
Objection resolved — Addressed
06/23/2023
Objection raised — Structural
06/23/2023
Objection resolved — Addressed
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNEW YORK CONSTRUCTION MA*09/10/2026
DOB NOWConstruction FencePermit IssuedNEW YORK CONSTRUCTION MA*03/09/2026
DOB NOWStructuralPermit IssuedNEW YORK CONSTRUCTION MA*09/12/2025
DOB NOWGeneral ConstructionSigned-offNEW YORK CONSTRUCTION MA*12/06/2023
DOB NOWPlumbingPermit IssuedHP SERVICES INC10/25/2023
DOB NOWConstruction FencePermit IssuedNEW YORK CONSTRUCTION MA*09/12/2023
BISPLISSUEDLI SHING LAM CORP01/09/2006
1 project · most recent 09/19/2023
Gas Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
09/19/2023Permit IssuedHP SERVICES INCGas, Plumbing-Sprinkler, Storm, Water/Sanitary
1 project · most recent 10/23/2024
Steel Wood
FiledStatusContractorScope
10/23/2024Permit IssuedNEW YORK CONSTRUCTION MA*Steel, Wood
1 project · most recent 03/24/2023
Fence
FiledStatusContractorScope
03/24/2023Permit IssuedNEW YORK CONSTRUCTION MA*Fence
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/11/2026Pass-Final General Construction Non-Directive 14PassView ↗
01/09/2026Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
08/11/2025Final—progress
07/12/2024Structural Steel - DetailsJinfar Liuspecial
07/12/2024Wood – Metal-Plate-Connected TrussesJinfar Liuspecial
07/12/2024Fire-Resistant Penetrations and JointsJinfar Liuspecial
07/12/2024Excavations - Sheeting, Shoring, and BracingJinfar Liuspecial
07/12/2024Structural Steel - High Strength BoltingJinfar Liuspecial
07/12/2024Energy Code Compliance InspectionsJinfar Liuprogress
07/12/2024Structural Wood FrameJinfar Liuprogress
07/12/2024Fire-Resistance Rated ConstructionJinfar Liuprogress
07/12/2024Footing and FoundationJinfar Liuprogress
07/12/2024FinalJinfar Liuprogress
07/12/2024Fenestration areasJinfar Liuenergy_progress
07/12/2024Interior lighting powerJinfar Liuenergy_progress
07/12/2024MeteringJinfar Liuenergy_progress
07/12/2024Insulation placement and R valuesJinfar Liuenergy_progress
07/12/2024Fenestration air leakageJinfar Liuenergy_progress
07/12/2024HVAC-R and service water heating system controlsJinfar Liuenergy_progress
07/12/2024Air barrier - visual inspectionJinfar Liuenergy_progress
07/12/2024Concrete - Cast-In-PlaceJinfar Liuspecial
07/12/2024Lighting controlsJinfar Liuenergy_progress
07/12/2024HVAC-R and service water piping design and insulationJinfar Liuenergy_progress
07/12/2024Fenestration and door U-factor and product ratingsJinfar Liuenergy_progress
07/12/2024HVAC-R and service water heating equipmentJinfar Liuenergy_progress
07/12/2024Structural Stability – Alterations of existing buildingsJinfar Liuspecial
07/12/2024Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
Latest 25 of 58.
▾Documents — 71 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/25/2026Q00843971-I1Request digital key ↗
08/24/2026Q00843962-P1Request digital key ↗
08/24/2026Q00843962-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00843956-P4Open ↗
08/13/2026Q00843956-I1Open ↗
08/13/2026Q00843956-P5Open ↗
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026Q00843962-P1Open ↗
08/13/2026Q00843962-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00843956-I1Open ↗
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026Q00843956-P4Open ↗
09/01/2026Q00843956-P4Open ↗
08/28/2026Q00843962-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026Q00843956-P4Open ↗
09/01/2026Q00843956-P4Open ↗
08/28/2026Q00843962-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/25/2026Q00843971-I1Open ↗
08/23/2026Q00970787-I1Open ↗
08/21/2026Q00843956-P5Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00843956-P4Open ↗
08/13/2026Q00843956-I1Open ↗
08/13/2026Q00843956-P5Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/23/2026Q00970787-I1Open ↗
08/21/2026Q00843956-P4Open ↗
08/21/2026Q00843956-P5Open ↗
Showing 3 of 7 on file for this type
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT5
08/13/2026Q00843956-P5Open ↗
08/13/2026Q00843956-P4Open ↗
08/13/2026Q00843962-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q00843956-I1Open ↗
08/13/2026Q00843962-I1Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial3
08/13/2026Q00843956-P4Open ↗
08/13/2026Q00843956-I1Open ↗
08/13/2026Q00843956-P5Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00843956-P5Open ↗
08/13/2026Q00843956-I1Open ↗
08/13/2026Q00843956-P4Open ↗
▸DOB NOWPlot Diagram3
08/13/2026Q00843956-I1Open ↗
08/13/2026Q00843956-P4Open ↗
08/13/2026Q00843956-P5Open ↗
▸DOB NOWProperty Ownership Certification3
08/21/2026Q00843956-P5Open ↗
08/21/2026Q00843956-P4Open ↗
08/14/2026Q00843956-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00843956-I1Open ↗