← Back
Parochial school, yeshiva
Our Lady of Hope Catholic Academy
61-21 ELIOT AVENUE · BIN 4067005
💬 Discuss this project
1963Year Built
3Stories
W2Building Class
R4Zoning
54,700 sfGross Floor Area
1Units
LL97 Covered2 Open Violations ▸
Parochial school, yeshiva · 163,834 sf lot · 0.33 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalGeneral
Roof1p · 1 filing · 19 docs
Floor 116p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OUR LADY OF HOPE R C CHURCH1203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GRM CONSULTANTS LLC105/11/2026
KEMS ENGINEERING AND CONSTRUCTION401/05/2024
TPD ARCHITECTURE, PLLC312/01/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEWSAN CONSULTING803/21/2026
JAM CONSULTANTS, INC.603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ON-TRAC CONSTRUCTION ASSOGeneral Contractor303/21/2026
CRAINE AIR CONDITIONING INCGeneral Contractor203/21/2026
CAMBRIDGE HVAC CORPGeneral Contractor107/08/2026
F1 MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NORMAN C. LOK818105/11/2026
C.M. TESTING LABORATORY,1352212/01/2023
CL ENGINEERING P.C.6781208/24/2023
Building Lifecycle
All (51)Filed (8)Permit Issued (4)Signed Off (4)Violation (9)Inspection (1)Objection (4)Special Inspection (21)
05/20/2026
Signed off — Alteration
Q01399925-I1
05/12/2026
Permit issued — Mechanical Systems
Q01399925-I1-MS
05/11/2026
Filed — Alteration
Q01399925-I1
05/10/2026
Special inspection requirement — Mechanical Systems
NORMAN LOK
05/10/2026
Special inspection requirement — Final
GHANENDRA MISHRA
05/08/2024
Signed off — Alteration
Interior renovation of an existing 1st floor cafeteria as per plans filed herewith. No change to occupancy, use or egress.
Q00873479-I1
01/16/2024
Signed off — Alteration
Gas Connection only for Direct Replacement of Package Rooftop HVAC Unit above the Cafeteria
Q00854968-I1
01/05/2024
Filed — Alteration
Gas Connection only for Direct Replacement of Package Rooftop HVAC Unit above the Cafeteria
Q00854968-P1
01/05/2024
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
01/03/2024
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
12/29/2023
Signed off — Alteration
Direct replacement of package rooftop HVAC Unit above the Cafeteria. Replacement of Ducts and return Grilles in Cafeteria
Q00852311-I1
12/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN SEMIOLI
12/07/2023
Special inspection requirement — Fire-Resistance Rated Construction
JOHN SEMIOLI
12/07/2023
Special inspection requirement — Final
JOHN SEMIOLI
12/01/2023
Filed — Alteration
Interior renovation of an existing 1st floor cafeteria as per plans filed herewith. No change to occupancy, use or egress.
Q00873479-P1
10/20/2023
Special inspection requirement — Final
JOHN SEMIOLI
10/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN SEMIOLI
10/20/2023
Special inspection requirement — Fire-Resistance Rated Construction
JOHN SEMIOLI
09/18/2023
Objection resolved — Addressed
09/18/2023
Objection resolved — Addressed
08/24/2023
Filed — Alteration
Direct replacement of package rooftop HVAC Unit above the Cafeteria. Replacement of Ducts and return Grilles in Cafeteria
Q00852311-P1
08/24/2023
Objection raised — Inspections
08/24/2023
Objection raised — Inspections
08/24/2023
Special inspection requirement — Maintenance information
Steven Bendoraitis
08/24/2023
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
08/24/2023
Special inspection requirement — Final
Steven Bendoraitis
08/24/2023
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
08/24/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
08/24/2023
Special inspection requirement — Permanent certificate
Steven Bendoraitis
08/24/2023
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
08/24/2023
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
08/21/2023
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
08/21/2023
Special inspection requirement — Final
Steven Bendoraitis
08/21/2023
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
08/14/2023
Filed — No Work
Q00873789-I1
08/03/2023
Permit issued — General Construction
Q00873479-I1-GC
06/15/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/02/2023
Filed — Alteration
Interior renovation of an existing 1st floor cafeteria as per plans filed herewith. No change to occupancy, use or egress.
Q00873479-I1
04/17/2023
Permit issued — Mechanical Systems
Q00852311-I1-MS
04/14/2023
Permit issued — Plumbing
Q00854968-I1-PL
04/13/2023
Filed — Alteration
Gas Connection only for Direct Replacement of Package Rooftop HVAC Unit above the Cafeteria
Q00854968-I1
04/12/2023
Filed — Alteration
Direct replacement of package rooftop HVAC Unit above the Cafeteria. Replacement of Ducts and return Grilles in Cafeteria
Q00852311-I1
03/18/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/02/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/02/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/02/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/01/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/02/1989
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCAMBRIDGE HVAC CORP05/12/2026
DOB NOWGeneral ConstructionSigned-offON-TRAC CONSTRUCTION ASSO08/03/2023
DOB NOWMechanical SystemsSigned-offCRAINE AIR CONDITIONING I04/17/2023
DOB NOWPlumbingSigned-offF1 MECHANICAL INC04/14/2023
BISOTISSUEDJADS PRODUCTIONS, INC10/29/2020
BISPLISSUEDJOS, MAROTTA & SONS07/08/1999
BISOTISSUEDBOLTIC INSDUSTRIES INC04/06/1999
BISFPISSUEDLUND FIRE PRODUCTS CO., INC.01/27/1999
3 projects · most recent 05/06/2026
HVAC Wiring General Wiring
FiledStatusContractorScope
05/06/2026CompleteG.E.O. ELECTRIC CORPHVAC Wiring
04/11/2022CompleteWILLDAN ELECTRICAL OF NY—
08/27/2020CompleteWILLDAN ELECTRICAL OF NYGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
06/15/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
05/10/2026Mechanical SystemsNORMAN LOKspecial
05/10/2026FinalGHANENDRA MISHRAprogress
01/05/2024Energy Code Compliance InspectionsSteven Bendoraitisprogress
01/03/2024Energy Code Compliance InspectionsSteven Bendoraitisprogress
12/07/2023Fire-Resistant Penetrations and JointsJOHN SEMIOLIspecial
12/07/2023Fire-Resistance Rated ConstructionJOHN SEMIOLIprogress
12/07/2023FinalJOHN SEMIOLIprogress
10/20/2023FinalJOHN SEMIOLIprogress
10/20/2023Fire-Resistant Penetrations and JointsJOHN SEMIOLIspecial
10/20/2023Fire-Resistance Rated ConstructionJOHN SEMIOLIprogress
08/24/2023Maintenance informationSteven Bendoraitisenergy_progress
08/24/2023HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
08/24/2023FinalSteven Bendoraitisprogress
08/24/2023HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
08/24/2023HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
08/24/2023Permanent certificateSteven Bendoraitisenergy_progress
08/24/2023Energy Code Compliance InspectionsSteven Bendoraitisprogress
08/24/2023Mechanical SystemsCHRISTIAN LOZADAspecial
08/21/2023Mechanical SystemsCHRISTIAN LOZADAspecial
08/21/2023FinalSteven Bendoraitisprogress
08/21/2023Energy Code Compliance InspectionsSteven Bendoraitisprogress
▾Documents — 63 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch7
08/24/2026Q00852311-P1Request digital key ↗
08/24/2026Q00852311-I1Request digital key ↗
08/24/2026Q00873479-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/24/2026Q00873789-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
10/28/2020440642388Open ↗
▸BISWORK PERMIT APPLICATION1
10/29/2020440642388Open ↗
▸Seals & Professional Certifications32
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026Q01399925-I1Open ↗
08/31/2026Q00852311-I1Open ↗
08/31/2026Q00852311-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/24/2026Q00852311-I1Open ↗
08/24/2026Q00852311-P1Open ↗
08/24/2026Q00873479-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026Q01399925-I1Open ↗
08/31/2026Q00852311-I1Open ↗
08/28/2026Q00873479-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/28/2020440642388Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/28/2020440642388Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/28/2020440642388Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026Q00852311-P1Open ↗
08/24/2026Q00852311-I1Open ↗
08/23/2026Q00854968-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026Q00873479-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
11/18/2020440642388Open ↗
10/28/2020440642388Open ↗
▸Approvals, Objections & Sign-offs9
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/24/2026Q00852311-P1Open ↗
08/24/2026Q00852311-I1Open ↗
08/24/2026Q00873479-I1Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/01/2020440642388Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/18/2020440642388Open ↗
10/28/2020440642388Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
10/28/2020440642388Open ↗
▸Other Documents2
▸DOB NOWAlternate Plan 21
08/24/2026Q00873789-I1Open ↗
▸DOB NOWAlternate Plan 11
08/24/2026Q00873789-I1Open ↗