← Back
Primarily 2 family with 1 store or office
63-08 WOODHAVEN BOULEVARD
QUEENS · BIN 4069585
💬 Discuss this project
1930Year Built
2Stories
S2Building Class
R5DZoning
2,356 sfGross Floor Area
3Units
Rent Stabilized0 Open Violations
Primarily 2 family with 1 store or office · Owner of record: UMB LLC · 2,020 sf lot · 1.17 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/11/2016$500K—— → —$212/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VMT DESIGN WORKSHOP INC.207/31/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HOFFMANN BDC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ISTATS MAINTENANCE CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738207/31/2025
Building Lifecycle
All (41)Filed (2)Permit Issued (1)Violation (11)Inspection (5)Special Inspection (22)
09/12/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/25/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/25/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/14/2025
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
08/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
08/14/2025
Special inspection requirement — Mechanical Systems
anthony santoro
08/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/14/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
08/14/2025
Special inspection requirement — Final
anthony santoro
08/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
08/14/2025
Special inspection requirement — Lighting controls
anthony santoro
08/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
08/14/2025
Special inspection requirement — Interior lighting power
anthony santoro
08/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
07/31/2025
Filed — Alteration
APPLICATION IS FILED FOR THE INTERIOR ALTERATION OF EXISTING RETAIL SPACE AT GROUND FLOOR OF EXISTING 2 STORY MIXED USE BUILDING.NO CHANGE IN USE EGRESS OR OCCUPANCY.
Q01219373-P2
07/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
07/27/2025
Special inspection requirement — Mechanical Systems
anthony santoro
07/27/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
07/27/2025
Special inspection requirement — Final
anthony santoro
07/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
07/27/2025
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
07/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
07/27/2025
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
07/27/2025
Special inspection requirement — Interior lighting power
anthony santoro
07/27/2025
Special inspection requirement — Lighting controls
anthony santoro
07/14/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/27/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/27/2025
Permit issued — Mechanical Systems
Q01219373-I1-GC-CX
05/12/2025
Filed — Alteration
APPLICATION IS FILED FOR THE INTERIOR ALTERATION OF EXISTING RETAIL SPACE AT GROUND FLOOR OF EXISTING 2 STORY MIXED USE BUILDING.NO CHANGE IN USE EGRESS OR OCCUPANCY.
Q01219373-I1
03/18/2022
Violation issued (HPD, closed)
I
11/08/2019
Violation issued (HPD, closed)
I
01/11/2018
Violation issued (HPD, closed)
I
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedISTATS MAINTENANCE CORP05/27/2025
BISPLISSUEDRAYMOND'S PLBG & HTG LLC03/22/2018
BISBLISSUEDRAYMOND'S PLBG & HTG LLC01/26/2017
BISPLISSUEDRAYMOND'S PLBG & HTG LLC01/19/2017
1 project · most recent 07/31/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/31/2025Permit IssuedISTATS MAINTENANCE CORPHeating and Air Conditioning Systems
Heat / Cool
Fujitsu AIRSTAGE ASUH09LPAS 9,000 BTU · Fan Coil Indoor ×2
AIRSTAGE AOU45RLXFZ 45,000 BTU · Vrf Outdoor ×1
AIRSTAGE ASUH24LPAS 24,000 BTU · Fan Coil Indoor ×1
1 project · most recent 08/18/2025
General Wiring
FiledStatusContractorScope
08/18/2025CompleteATMOS ELECTRIC SVCE CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/12/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/25/2025Fail-Final General Construction Non-Directive 14FailView ↗
08/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/27/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
08/14/2025HVAC-R and service water heating system controlsanthony santoroenergy_progress
08/14/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
08/14/2025Mechanical Systemsanthony santorospecial
08/14/2025Tenant Protection Plan Compliance—special
08/14/2025Energy Code Compliance Inspectionsanthony santoroprogress
08/14/2025Finalanthony santoroprogress
08/14/2025Fire-Resistance Rated Constructionanthony santoroprogress
08/14/2025Lighting controlsanthony santoroenergy_progress
08/14/2025HVAC-R and service water heating equipmentanthony santoroenergy_progress
08/14/2025Interior lighting poweranthony santoroenergy_progress
08/14/2025HVAC-R and service water piping design and insulationanthony santoroenergy_progress
07/27/2025Tenant Protection Plan Compliance—special
07/27/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
07/27/2025Mechanical Systemsanthony santorospecial
07/27/2025Energy Code Compliance Inspectionsanthony santoroprogress
07/27/2025Finalanthony santoroprogress
07/27/2025Fire-Resistance Rated Constructionanthony santoroprogress
07/27/2025HVAC-R and service water heating system controlsanthony santoroenergy_progress
07/27/2025HVAC-R and service water piping design and insulationanthony santoroenergy_progress
07/27/2025HVAC-R and service water heating equipmentanthony santoroenergy_progress
07/27/2025Interior lighting poweranthony santoroenergy_progress
07/27/2025Lighting controlsanthony santoroenergy_progress
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/19/2026Q01219373-P2Request digital key ↗
08/19/2026Q01219373-I1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION7
09/08/2017440344815Open ↗
07/27/2017440344815Open ↗
07/14/2017440344815Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION3
03/23/2018440344815Open ↗
01/26/2017440344815Open ↗
01/19/2017440344815Open ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature4
08/28/2026Q01219373-I1Open ↗
08/28/2026Q01219373-I1Open ↗
08/26/2026Q01219373-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/19/2026Q01219373-P2Open ↗
08/19/2026Q01219373-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026Q01219373-I1Open ↗
08/26/2026Q01219373-P2Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
05/17/2018440344815Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/20/2016440344815Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/20/2016440344815Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/20/2016440344815Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
10/24/2017440344815Open ↗
08/04/2017440344815Open ↗
07/14/2017440344815Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
09/20/2016440344815Open ↗
▸BISSCHEDULE B - PLUMBING1
09/20/2016440344815Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
09/20/2016440344815Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/20/2016440344815Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
05/17/2018440344815Open ↗
12/22/2016440344815Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/20/2016440344815Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/17/2018440344815Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/19/2017440344815Open ↗
09/20/2016440344815Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/17/2018440344815Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
05/17/2018440344815Open ↗
09/20/2016440344815Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
03/27/2017440344815Open ↗
12/22/2016440344815Open ↗
12/22/2016440344815Open ↗
▸BISBOROUGH INTAKE FORM1
09/08/2017440344815Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/20/2016440344815Open ↗