One family attached or semi-detached
66-35 BOOTH STREET
QUEENS · BIN 4074766
💬 Discuss this project
1945Year Built
2Stories
A5Building Class
R4BZoning
1,280 sfGross Floor Area
1Units
0 Open Violations
One family attached or semi-detached · 1,996 sf lot · 0.64 FAR built · Flood zone X
Locations of Work
StructuralElectrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 1 filing · 6 docs
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1 filing · 20 docs
1 job · most recent 04/02/2025
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
04/02/2025Permit IssuedGENESIS NYC CONSTRUCTIONHeating Systems
Heating
A.O. Smith GPVL-50 40,000 BTU · Boiler ×4
Williamson GWI-090-N-T 67,000 BTU · Water Heater ×4
1 job · most recent 04/02/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/02/2025Signed-offS & L PLUMBING INCGas, Storm, Water/Sanitary
2 jobs · most recent 04/22/2026
General Wiring
FiledStatusContractorScope
04/22/2026CompleteI.P. ELECTRIC INC—
04/10/2025CompleteINTELOGIC ELECTRIC, INC.General Wiring
1 job · most recent 04/02/2025
Wood
FiledStatusContractorScope
04/02/2025Permit IssuedGENESIS NYC CONSTRUCTIONWood
1 job · most recent 04/02/2025
Fence
FiledStatusContractorScope
04/02/2025Permit IssuedGENESIS NYC CONSTRUCTIONFence
Building Lifecycle
All (64)Filed (5)Permit Issued (4)Signed Off (2)Violation (1)Inspection (4)Objection (18)Special Inspection (30)
04/29/2026
Permit issued — Solar
Q01379932-I1-SL
04/22/2026
Filed — Alteration
Q01379932-I1
03/30/2026
Special inspection requirement — Air barrier - visual inspection
Chun Feng
03/30/2026
Special inspection requirement — Final
Chun Feng
03/30/2026
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
03/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chun Feng
11/10/2025
Signed off — Alteration CO
INSTALL 8' TEMP. CONSTRUCTION FENCE AT THE ABOVE ADDRESS.
Q00928726-S2
11/10/2025
Signed off — Alteration CO
INSTALL 8' TEMP. CONSTRUCTION FENCE AT THE ABOVE ADDRESS.
Q00928726-S1
07/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/17/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/22/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/24/2025
Permit issued — Foundation
Q00928726-I1-GC-CX
04/24/2025
Special inspection requirement — Masonry
XIAOHONG ZHAO
04/24/2025
Special inspection requirement — Heating Systems
XIAOHONG ZHAO
04/24/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
XIAOHONG ZHAO
04/24/2025
Special inspection requirement — Concrete - Cast-In-Place
XIAOHONG ZHAO
04/24/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
TONY ONYEAGORO
04/24/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIAOHONG ZHAO
04/24/2025
Special inspection requirement — Subgrade Inspections
XIAOHONG ZHAO
04/24/2025
Special inspection requirement — Mechanical Systems
XIAOHONG ZHAO
04/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
XIAOHONG ZHAO
04/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
04/24/2025
Special inspection requirement — Footing and Foundation
XIAOHONG ZHAO
04/24/2025
Special inspection requirement — Structural Wood Frame
XIAOHONG ZHAO
04/24/2025
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
04/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
04/24/2025
Special inspection requirement — Permanent certificate
XIAOHONG ZHAO
04/24/2025
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
04/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
04/24/2025
Special inspection requirement — Interior lighting power
XIAOHONG ZHAO
04/24/2025
Special inspection requirement — Final
XIAOHONG ZHAO
04/24/2025
Special inspection requirement — Insulation placement and R values
XIAOHONG ZHAO
04/24/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
XIAOHONG ZHAO
04/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
04/02/2025
Filed — Alteration CO
INSTALL 8' TEMP. CONSTRUCTION FENCE AT THE ABOVE ADDRESS.
Q00928726-P1
04/01/2025
Special inspection requirement — Permanent certificate
XIAOHONG ZHAO
04/01/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
XIAOHONG ZHAO
04/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
04/01/2025
Special inspection requirement — Heating Systems
XIAOHONG ZHAO
03/28/2025
Permit issued — Plumbing
Q00928726-S2-PL
03/25/2025
Filed — Alteration CO
INSTALL 8' TEMP. CONSTRUCTION FENCE AT THE ABOVE ADDRESS.
Q00928726-S2
03/25/2025
Permit issued — Construction Fence
Q00928726-S1-FN
02/16/2025
Filed — Alteration CO
INSTALL 8' TEMP. CONSTRUCTION FENCE AT THE ABOVE ADDRESS.
Q00928726-S1
02/05/2025
Objection resolved — Addressed
02/05/2025
Objection resolved — Addressed
02/05/2025
Objection resolved — Addressed
01/22/2025
Objection resolved — Addressed
01/22/2025
Objection resolved — Addressed
01/22/2025
Objection resolved — Addressed
01/22/2025
Objection resolved — Addressed
01/22/2025
Objection resolved — Addressed
01/22/2025
Objection resolved — Addressed
01/13/2025
Objection raised — Zoning
01/13/2025
Objection raised — Structural
01/13/2025
Objection raised — Scope
01/13/2025
Objection raised — Structural
01/13/2025
Objection raised — Plumbing
01/13/2025
Objection raised — Zoning
01/13/2025
Objection raised — Mechanical
Latest 60 of 64 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/04/2015$650K—Private party → Private party$508/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN FENG, ARCHITECT104/22/2026
AMERILAND BROOK LLC204/02/2025
BRIAN ILL DEVELOPMENT LLC203/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMERILAND BROOK LLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GENESIS NYC CONSTRUCTIONGeneral Contractor204/09/2026
AMERGY SOLAR INCGeneral Contractor107/08/2026
S & L PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SQ. ARCH, LLC4802104/22/2026
AMERILAND BROOK LLC1506204/02/2025
BRIAN ILL DEVELOPMENT LLC1402103/25/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedAMERGY SOLAR INC04/29/2026
DOB NOWFoundationPermit IssuedGENESIS NYC CONSTRUCTION04/24/2025
DOB NOWPlumbingSigned-offS & L PLUMBING INC03/28/2025
DOB NOWConstruction FenceSigned-offGENESIS NYC CONSTRUCTION03/25/2025
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/17/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/22/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
03/30/2026Air barrier - visual inspectionChun Fengenergy_progress
03/30/2026FinalChun Fengprogress
03/30/2026Energy Code Compliance InspectionsChun Fengprogress
03/30/2026Fire-Resistant Penetrations and JointsChun Fengspecial
04/24/2025MasonryXIAOHONG ZHAOspecial
04/24/2025Heating SystemsXIAOHONG ZHAOspecial
04/24/2025Excavations - Sheeting, Shoring, and BracingXIAOHONG ZHAOspecial
04/24/2025Concrete - Cast-In-PlaceXIAOHONG ZHAOspecial
04/24/2025Subsurface Investigations (Borings/Test Pits)TONY ONYEAGOROspecial
04/24/2025Structural Stability – Alterations of existing buildingsXIAOHONG ZHAOspecial
04/24/2025Subgrade InspectionsXIAOHONG ZHAOspecial
04/24/2025Mechanical SystemsXIAOHONG ZHAOspecial
04/24/2025Fire-Resistance Rated ConstructionXIAOHONG ZHAOprogress
04/24/2025HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
04/24/2025Footing and FoundationXIAOHONG ZHAOprogress
04/24/2025Structural Wood FrameXIAOHONG ZHAOprogress
04/24/2025Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
04/24/2025HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
04/24/2025Permanent certificateXIAOHONG ZHAOenergy_progress
04/24/2025Maintenance informationXIAOHONG ZHAOenergy_progress
04/24/2025HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
04/24/2025Interior lighting powerXIAOHONG ZHAOenergy_progress
04/24/2025FinalXIAOHONG ZHAOprogress
04/24/2025Insulation placement and R valuesXIAOHONG ZHAOenergy_progress
04/24/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationXIAOHONG ZHAOspecial
Latest 25 of 54.
▾Documents — 90 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026Q00928726-P1Request digital key ↗
08/20/2026Q00928726-S2Request digital key ↗
08/20/2026Q00928726-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWRestrictive Declaration/Easement 14
08/13/2026Q00928726-P1Open ↗
08/13/2026Q00928726-S2Open ↗
08/13/2026Q00928726-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026Q00928726-I1Open ↗
08/13/2026Q00928726-P1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00928726-P1Open ↗
08/13/2026Q00928726-I1Open ↗
▸Seals & Professional Certifications59
▸DOB NOWProgress Inspector Seal & Signature32
08/30/2026Q00928726-I1Open ↗
08/30/2026Q00928726-I1Open ↗
08/30/2026Q00928726-I1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
08/30/2026Q00928726-I1Open ↗
08/30/2026Q00928726-I1Open ↗
08/30/2026Q00928726-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/20/2026Q00928726-S1Open ↗
08/20/2026Q00928726-P1Open ↗
08/20/2026Q00928726-S2Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00928726-I1Open ↗
08/13/2026Q00928726-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026Q00928726-P1Open ↗
08/20/2026Q00928726-S2Open ↗
08/20/2026Q00928726-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026Q00928726-P1Open ↗
08/13/2026Q00928726-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00928726-I1Open ↗
▸Other Documents10
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00928726-I1Open ↗
08/13/2026Q00928726-P1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q00928726-P1Open ↗
08/13/2026Q00928726-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/20/2026Q00928726-P1Open ↗
08/20/2026Q00928726-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q00928726-I1Open ↗
08/13/2026Q00928726-P1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00928726-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00928726-I1Open ↗