← Back
Walk-up apt, over six families with stores
72-22 AUSTIN STREET
QUEENS · BIN 4077929
💬 Discuss this project
1929Year Built
4Stories
C7Building Class
R5DZoning
28,500 sfGross Floor Area
42Units
LL97 CoveredRent Stabilized2 Open Violations ▸
Walk-up apt, over six families with stores · 12,045 sf lot · 2.37 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KRA REALTY2707/08/2026
RELIABLE ENTERPRISES707/08/2026
OWNER OF 72-22 AUSTIN ST103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MJE PROFESSIONAL SERVICES207/25/2025
BAZINI ENGINEERING, P.C.106/16/2022
NEW YORK ENGINEERING ASSOC., P.C.505/09/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SNR EXPEDITING DESIGN403/21/2026
NEW YORK ENGINEERING ASSOCIATES P1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACE-ATLAS PLBING & HTGPlumbing307/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor207/08/2026
BIONDO, PHILIPElectrical103/21/2026
PAUL CILLIKElectrical103/21/2026
GUARANTEED HOME IMPROVEMEGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851305/09/2022
Building Lifecycle
All (84)Filed (8)Permit Issued (7)Signed Off (4)Violation (60)Inspection (3)Special Inspection (2)
05/07/2026
Violation issued (HPD, open)
A
11/21/2025
Violation issued (HPD, closed)
C
11/21/2025
Violation issued (HPD, closed)
C
11/21/2025
Violation issued (HPD, closed)
B
11/21/2025
Violation issued (HPD, closed)
C
11/21/2025
Violation issued (HPD, closed)
B
11/21/2025
Violation issued (HPD, closed)
B
11/21/2025
Violation issued (HPD, closed)
B
11/21/2025
Violation issued (HPD, closed)
C
11/16/2025
Violation issued (HPD, closed)
B
11/16/2025
Violation issued (HPD, closed)
C
11/16/2025
Violation issued (HPD, closed)
B
07/25/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01261332-I1
07/25/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01261314-I1
07/25/2025
Permit issued — Sidewalk Shed
Q01261314-I1-SH
07/25/2025
Permit issued — Supported Scaffold
Q01261332-I1-SF
06/12/2025
Violation issued (HPD, open)
A
12/02/2024
Violation issued (HPD, closed)
I
05/30/2024
Violation issued (ECB, closed)
Construction
04/16/2024
Violation issued (HPD, closed)
A
11/24/2023
Violation issued (HPD, closed)
I
06/14/2023
Violation issued (HPD, closed)
C
06/14/2023
Violation issued (HPD, closed)
C
06/14/2023
Violation issued (HPD, closed)
A
06/14/2023
Violation issued (HPD, closed)
A
06/14/2023
Violation issued (HPD, closed)
A
03/30/2023
Violation issued (HPD, closed)
A
12/22/2022
Signed off — Alteration
REMOVE EXISTING FUEL STORAGE TANK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00747011-I1
12/20/2022
Signed off — Alteration
REPLACE BOILER AND GAS BURNER.
Q00607351-I1
12/20/2022
Signed off — Alteration
CONNECT REPLACEMENT BURNER TO EXISTING GAS PIPING.
Q00607320-I1
12/13/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/08/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/02/2022
Permit issued — Plumbing
Q00607320-I1-PL
08/19/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/21/2022
Permit issued — Boiler Equipment
Q00747011-I1-BE
06/16/2022
Filed — Alteration
REMOVE EXISTING FUEL STORAGE TANK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00747011-I1
05/10/2022
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
05/09/2022
Filed — Alteration
REPLACE BOILER AND GAS BURNER.
Q00607351-P1
05/09/2022
Filed — Alteration
CONNECT REPLACEMENT BURNER TO EXISTING GAS PIPING.
Q00607320-P1
04/08/2022
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
03/08/2022
Violation issued (HPD, closed)
A
12/22/2021
Signed off — Alteration
INSTALL CHIMNEY LINER PER PLANS.
Q00607388-I1
10/26/2021
Permit issued — Mechanical Systems
Q00607388-I1-MS
10/26/2021
Permit issued — Boiler Equipment
Q00607351-I1-BE
10/25/2021
Permit issued — Plumbing
Q00607320-I1-PL
10/12/2021
Filed — Alteration
REPLACE BOILER AND GAS BURNER.
Q00607351-I1
10/12/2021
Filed — Alteration
CONNECT REPLACEMENT BURNER TO EXISTING GAS PIPING.
Q00607320-I1
10/12/2021
Filed — Alteration
INSTALL CHIMNEY LINER PER PLANS.
Q00607388-I1
04/30/2021
Violation issued (ECB, closed)
Boilers
04/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/16/2021
Violation issued (HPD, closed)
A
08/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/10/2017
Violation issued (HPD, closed)
B
11/23/2016
Violation issued (HPD, closed)
I
05/06/2016
Violation issued (HPD, closed)
B
10/19/2015
Violation issued (HPD, closed)
I
04/14/2015
Violation issued (ECB, closed)
Boilers
10/08/2014
Violation issued (HPD, closed)
A
08/22/2014
Violation issued (HPD, closed)
A
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC07/25/2025
DOB NOWSupported ScaffoldPermit IssuedRELIABLE ENTERPRISES INC07/25/2025
DOB NOWPlumbingSigned-offACE-ATLAS PLBING & HTG12/02/2022
DOB NOWBoiler EquipmentSigned-offSTUART N SCHWARTZ07/21/2022
DOB NOWMechanical SystemsSigned-offGUARANTEED HOME IMPROVEME10/26/2021
DOB NOWBoiler EquipmentSigned-offACE-ATLAS PLBING & HTG10/26/2021
DOB NOWPlumbingSigned-offACE-ATLAS PLBING & HTG10/25/2021
BISPLISSUEDTOP PLUMBING GROUP,INC05/23/2016
BISOTISSUEDZITAN BILT INC05/20/2016
BISPLISSUEDGEORGE BASSOLINO INC01/24/1991
3 projects · most recent 07/25/2025
General Wiring Boiler Controls
FiledStatusContractorScope
07/25/2025Permit IssuedRICHARD NEU—
05/16/2023Permit IssuedJUBILEE ELEC'L SERVICE COGeneral Wiring
12/15/2022CompleteSTX ELECTRICAL CORPBoiler Controls
2 projects · most recent 07/25/2025
Sidewalk Shed Scaffold
FiledStatusContractorScope
07/25/2025Permit IssuedRELIABLE ENTERPRISES INCSidewalk Shed
07/25/2025Permit IssuedRELIABLE ENTERPRISES INCScaffold
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/13/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/08/2022Pass-Final Boiler Equipment InspectionPassView ↗
08/19/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
05/10/2022Energy Code Compliance InspectionsLOUIS ARENAprogress
04/08/2022Energy Code Compliance InspectionsLOUIS ARENAprogress
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/27/2026Q00607351-I1Request digital key ↗
08/27/2026Q00607351-P1Request digital key ↗
08/27/2026Q00607320-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
06/14/2016440312494Open ↗
05/19/2016440312494Open ↗
▸BISWORK PERMIT APPLICATION2
05/23/2016440312494Open ↗
05/19/2016440312494Open ↗
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/27/2026Q00607351-P1Open ↗
08/27/2026Q00607351-I1Open ↗
08/27/2026Q00607320-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026Q00607320-I1Open ↗
08/24/2026Q00607320-P1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/19/2016440312494Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/19/2016440312494Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/19/2016440312494Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
07/12/2016440312494Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
05/19/2016440312494Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/14/2016440312494Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/27/2026Q00607351-I1Open ↗
08/27/2026Q00607351-P1Open ↗
08/27/2026Q00607320-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/19/2016440312494Open ↗
▸Energy Compliance7
▸BISAS-BUILT ENERGY ANALYSIS1
07/12/2016440312494Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/19/2016440312494Open ↗
▸BISNYCECC ANALYSIS1
05/19/2016440312494Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/12/2016440312494Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/19/2016440312494Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00607351-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00607351-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
05/19/2016440312494Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/12/2016440312494Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
07/12/2016440312494Open ↗
05/19/2016440312494Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
06/14/2016440312494Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/19/2016440312494Open ↗