DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
DOB09/06/2019VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
DOB01/26/2018VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
DOB10/31/2014VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
DOB03/31/2014VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
DOB10/01/2012VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2011 INSPECTION/TEST
DOB10/01/2005V-DOB VIOLATION - ACTIVE
DOB05/06/2002V-DOB VIOLATION - ACTIVE
DOB02/19/2002V-DOB VIOLATION - ACTIVE
ECB07/29/200550A/50B 50C FULTON V.T. BOILER, 15HP, NB48362, GAS, 1983 50A) IMPROPERARRANGEMENT OF THE BLOWDOWN VALVES. INSTALL A SCREW-TYPE (SLOW) VALVE AT THE OUTLET END OF THE BLOWDOWN LINE. 50B) NO DISCHARGE PIPE ON THENothing owed — awaiting certificate of correction
ECB07/29/200550A/50B 48AB FULTON V.T. BOILER, 15HP, NB42698, GAS, 1983 50A) IMPROPER ARRANGEMENT OF THE BLOWDOWN VALVES. INSTALL A SCREW-TYPE (SLOW) VALVE AT THE OUTLET END OF THE BLOWDOWN LINE. SEPARATE BLOWDOWN PIPINGNothing owed — awaiting certificate of correction
Factory, light manufacturing · Owner of record: KIYBAR REALTY CORP · 17,800 sf lot · 1.34 FAR built · Flood zone X