← Back
Single or multiple dwelling with stores or offices
675 SENECA AVENUE
QUEENS · BIN 4082542
💬 Discuss this project
1930Year Built
3Stories
S9Building Class
R6BZoning
5,350 sfGross Floor Area
6Units
Rent Stabilized9 Open Violations ▸
Single or multiple dwelling with stores or offices · Owner of record: 675 LOGAN CORP. · 2,213 sf lot · 2.42 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof2p · 2 filings · 20 docs
Floor 16p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
675 LOGAN3504/09/2026
OWNER OF 675 SENECA AVE203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOHAIL HUMAYUN P E INC511/11/2022
JOSE LOCKHART, P.E.105/18/2022
G. PEROTTO ASSOCIATES308/06/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
G PEROTTO ASSOCIATES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DIRNO CORPORATIONGeneral Contractor504/09/2026
GLOBAL LUXURY SRVCS INCGeneral Contractor203/21/2026
UNLIMITED PLG SOLUTIONSPlumbing207/08/2026
LUVER PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD TESTING & INSPECTION S7010111/11/2022
TECNICO SPECIAL INSPECTIO5939105/18/2022
ASHRAF CORPORATION1973205/12/2022
DUCTILE CONSULTING INC.9349103/02/2022
Building Lifecycle
All (58)Filed (9)Permit Issued (7)Signed Off (7)Violation (35)
12/18/2025
Violation issued (HPD, closed)
C
12/18/2025
Violation issued (HPD, closed)
C
12/18/2025
Violation issued (HPD, open)
B
12/18/2025
Violation issued (HPD, closed)
B
12/13/2025
Violation issued (HPD, closed)
B
12/13/2025
Violation issued (HPD, closed)
C
12/13/2025
Violation issued (HPD, closed)
C
12/13/2025
Violation issued (HPD, open)
B
12/13/2025
Violation issued (HPD, open)
C
12/13/2025
Violation issued (HPD, open)
B
12/13/2025
Violation issued (HPD, open)
C
12/10/2025
Violation issued (HPD, closed)
C
12/10/2025
Violation issued (HPD, closed)
C
12/10/2025
Violation issued (HPD, closed)
C
12/10/2025
Violation issued (HPD, open)
C
12/10/2025
Violation issued (HPD, open)
B
12/10/2025
Violation issued (HPD, open)
B
12/10/2025
Violation issued (HPD, closed)
B
11/25/2025
Signed off — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION TO COMBINE TWO EXISTING EATING & DRINKING ESTABLISHMENTS (NON-PA). GENERAL CONSTRUCTIONWORK ON 1ST FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
Q00672243-S1
11/19/2025
Signed off — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION TO COMBINE TWO EXISTING EATING & DRINKING ESTABLISHMENTS (NON-PA). GENERAL CONSTRUCTIONWORK ON 1ST FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
Q00672243-I1
08/20/2025
Violation issued (ECB, open)
Construction
03/29/2023
Violation issued (HPD, closed)
A
12/05/2022
Signed off — Alteration
APPLICATION FILED TO INSTALL NEW PLUMBING FIXTURES AND PIPING INCONJUNCTION WITH ALT 2 JOB #Q00672243. NO GAS WORK. NO CHANGE TOUSE, EGRESS, OR OCCUPANCY.
Q00700347-I1
11/21/2022
Permit issued — Mechanical Systems
Q00672243-S1-MS
11/11/2022
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION TO COMBINE TWO EXISTING EATING & DRINKING ESTABLISHMENTS (NON-PA). GENERAL CONSTRUCTIONWORK ON 1ST FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
Q00672243-S1
09/08/2022
Signed off — Alteration
Q00739235-I1
09/07/2022
Permit issued — General Construction
Q00672243-I1-GC
05/18/2022
Filed — Alteration
Q00739235-I1
05/12/2022
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION TO COMBINE TWO EXISTING EATING & DRINKING ESTABLISHMENTS (NON-PA). GENERAL CONSTRUCTIONWORK ON 1ST FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
Q00672243-P1
05/09/2022
Permit issued — Plumbing
Q00700347-I1-PL
04/13/2022
Filed — Alteration
APPLICATION FILED TO INSTALL NEW PLUMBING FIXTURES AND PIPING INCONJUNCTION WITH ALT 2 JOB #Q00672243. NO GAS WORK. NO CHANGE TOUSE, EGRESS, OR OCCUPANCY.
Q00700347-I1
03/25/2022
Permit issued — General Construction
Q00672243-I1-GC
03/02/2022
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION TO COMBINE TWO EXISTING EATING & DRINKING ESTABLISHMENTS (NON-PA). GENERAL CONSTRUCTIONWORK ON 1ST FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
Q00672243-I1
01/13/2022
Signed off — Alteration
INSTALL NEW KITCHEN HOOD, EXHAUST FAN AND ASSOCIATED DUCT WORK AS PER PLAN. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00540964-I1
08/30/2021
Signed off — Alteration
REPLACE ALL EXISTING GAS PIPING AND CONNECT TO REPLACEMENT BOILER FILED UNDER SEPARATE APPLICATION, EXISTING 2nd RESIDENTIAL BOILER, TWO EXISTING HOT WATER HEATERS AND 4 DOMESTIC RANGES.
Q00518053-I1
08/23/2021
Signed off — Alteration
129/21 REPLACE EXISTING COMMERCIAL BOILER
Q00523243-I1
08/06/2021
Filed — Alteration
129/21 REPLACE EXISTING COMMERCIAL BOILER
Q00523243-P2
07/29/2021
Permit issued — Mechanical Systems
Q00540964-I1-MS
07/08/2021
Filed — Alteration
INSTALL NEW KITCHEN HOOD, EXHAUST FAN AND ASSOCIATED DUCT WORK AS PER PLAN. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00540964-I1
07/06/2021
Permit issued — Boiler Equipment
Q00523243-I1-BE
07/06/2021
Permit issued — Plumbing
Q00518053-I1-PL
06/27/2021
Filed — Alteration
REPLACE ALL EXISTING GAS PIPING AND CONNECT TO REPLACEMENT BOILER FILED UNDER SEPARATE APPLICATION, EXISTING 2nd RESIDENTIAL BOILER, TWO EXISTING HOT WATER HEATERS AND 4 DOMESTIC RANGES.
Q00518053-I1
06/27/2021
Filed — Alteration
129/21 REPLACE EXISTING COMMERCIAL BOILER
Q00523243-I1
10/17/2015
Violation issued (ECB, closed)
Construction
09/03/2013
Violation issued (HPD, closed)
B
08/19/2009
Violation issued (HPD, closed)
B
08/19/2009
Violation issued (HPD, closed)
B
08/19/2009
Violation issued (HPD, closed)
B
08/19/2009
Violation issued (HPD, closed)
B
08/19/2009
Violation issued (HPD, closed)
B
08/19/2009
Violation issued (HPD, closed)
B
06/10/2001
Violation issued (ECB, closed)
Quality of Life
06/10/2001
Violation issued (ECB, closed)
Quality of Life
06/10/2001
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/08/1991
Violation issued (ECB, closed)
Boilers
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offDIRNO CORPORATION11/21/2022
DOB NOWGeneral ConstructionSigned-offDIRNO CORPORATION09/07/2022
DOB NOWPlumbingSigned-offLUVER PLBG & HTG INC05/09/2022
DOB NOWGeneral ConstructionSigned-offDIRNO CORPORATION03/25/2022
DOB NOWMechanical SystemsSigned-offGLOBAL LUXURY SRVCS07/29/2021
DOB NOWBoiler EquipmentSigned-offCENTA PLBG & HTG INC07/06/2021
DOB NOWPlumbingSigned-offCENTA PLBG & HTG INC07/06/2021
BISOTISSUEDANANDA GENERAL CONSTRUCT10/31/2016
BISOTISSUEDANANDA GENERAL CONSTRUCT11/30/2015
BISOTISSUEDOWNER11/24/1997
1 project · most recent 06/07/2023
General Wiring
FiledStatusContractorScope
06/07/2023Permit IssuedAPPROVED ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
08/27/2025Pass-Final General Construction Non-Directive 14PassView ↗
11/14/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/13/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/13/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/23/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/06/2021Pass-Final Boiler Equipment InspectionPassView ↗
08/02/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/26/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
11/11/2022Maintenance informationSOHAIL HUMAYUNenergy_progress
11/11/2022HVAC-R and service water heating equipmentSOHAIL HUMAYUNenergy_progress
11/11/2022HVAC-R and service water heating system controlsSOHAIL HUMAYUNenergy_progress
11/11/2022Tenant Protection Plan ComplianceXIUCHENG LIspecial
11/11/2022Energy Code Compliance InspectionsSOHAIL HUMAYUNprogress
11/11/2022HVAC-R and service water piping design and insulationSOHAIL HUMAYUNenergy_progress
05/19/2022Fenestration air leakageSOHAIL HUMAYUNenergy_progress
05/19/2022Interior lighting powerSOHAIL HUMAYUNenergy_progress
05/19/2022Lighting controlsSOHAIL HUMAYUNenergy_progress
05/19/2022Fenestration and door U-factor and product ratingsSOHAIL HUMAYUNenergy_progress
05/19/2022Structural Stability – Alterations of existing buildingsMANSUR AHMEDspecial
05/19/2022Energy Code Compliance InspectionsSOHAIL HUMAYUNprogress
05/19/2022Fire-Resistance Rated ConstructionSOHAIL HUMAYUNprogress
05/17/2022Structural Steel - DetailsJose Lockhartspecial
05/16/2022FinalJose Lockhartprogress
04/30/2022FinalSOHAIL HUMAYUNprogress
04/30/2022Mechanical SystemsXIUCHENG LIspecial
08/09/2021Maintenance informationGeorge Perottoenergy_progress
08/09/2021HVAC-R and service water heating system controlsGeorge Perottoenergy_progress
08/09/2021HVAC-R and service water heating equipmentGeorge Perottoenergy_progress
08/06/2021Maintenance informationGeorge Perottoenergy_progress
08/06/2021HVAC-R and service water heating system controlsGeorge Perottoenergy_progress
08/06/2021HVAC-R and service water heating equipmentGeorge Perottoenergy_progress
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/27/2026Q00518053-I1Request digital key ↗
08/27/2026Q00540964-I1Request digital key ↗
08/27/2026Q00523243-P2Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION2
11/02/2016421242499Open ↗
12/02/2015421242499Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
12/01/2016421242499Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
12/02/2015421242499Open ↗
▸Seals & Professional Certifications35
▸DOB NOWProgress Inspector Seal & Signature19
09/02/2026Q00672243-S1Open ↗
09/02/2026Q00672243-S1Open ↗
09/02/2026Q00672243-S1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/27/2026Q00518053-I1Open ↗
08/27/2026Q00523243-P2Open ↗
08/27/2026Q00523243-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026Q00672243-S1Open ↗
09/02/2026Q00672243-S1Open ↗
08/30/2026Q00672243-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/02/2015421242499Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/02/2015421242499Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
12/02/2015421242499Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/27/2026Q00518053-I1Open ↗
08/27/2026Q00523243-P2Open ↗
08/27/2026Q00523243-I1Open ↗
Showing 3 of 9 on file for this type
▸Energy Compliance5
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026Q00523243-I1Open ↗
08/13/2026Q00540964-I1Open ↗
08/13/2026Q00672243-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/02/2015421242499Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/01/2016421242499Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
12/02/2015421242499Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/01/2016421242499Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/01/2016421242499Open ↗
12/02/2015421242499Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
12/02/2015421242499Open ↗
12/02/2015421242499Open ↗