← Back
Two family frame
62-63 60 STREET
QUEENS · BIN 4083553
💬 Discuss this project
1920Year Built
2Stories
B2Building Class
R5BZoning
1,650 sfGross Floor Area
2Units
Two family frame · 2,500 sf lot · 0.66 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 1 filing · 10 docs
Floor 2Under Construction1p · 1 filing · 10 docs
Floor 1Under Construction1p · 1 filing · 10 docs
BasementUnder Construction1p · 1 filing · 10 docs
1 job · most recent 07/09/2026
Fence
FiledStatusContractorScope
07/09/2026Permit IssuedYAFE MEOD CORPFence
Building Lifecycle
All (32)Filed (3)Permit Issued (1)Objection (10)Special Inspection (18)
07/21/2026
Objection resolved — Open
07/21/2026
Objection resolved — Addressed
07/09/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED TO CONSTRUCT A VERTICAL AND HORIZONTAL ENLARGEMENT TO EXISTING BUILDING; CONVERT TO THREE STORIES WITH A CELLAR; SIX-FAMILY RESIDENTIAL DWELLING. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01413719-P1
07/06/2026
Permit issued — Construction Fence
Q01413719-S2-FN
07/01/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED TO CONSTRUCT A VERTICAL AND HORIZONTAL ENLARGEMENT TO EXISTING BUILDING; CONVERT TO THREE STORIES WITH A CELLAR; SIX-FAMILY RESIDENTIAL DWELLING. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01413719-S2
06/25/2026
Objection resolved — Resolved
06/25/2026
Objection resolved — Resolved
06/25/2026
Objection resolved — Open
06/18/2026
Objection raised — Other
06/18/2026
Objection raised — Structural
06/18/2026
Objection raised — Structural
06/18/2026
Objection raised — Other
06/18/2026
Objection raised — Zoning
06/09/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED TO CONSTRUCT A VERTICAL AND HORIZONTAL ENLARGEMENT TO EXISTING BUILDING; CONVERT TO THREE STORIES WITH A CELLAR; SIX-FAMILY RESIDENTIAL DWELLING. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01413719-I1
06/09/2026
Special inspection requirement — Concrete - Cast-In-Place
06/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/09/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
06/09/2026
Special inspection requirement — Energy Code Compliance Inspections
06/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/09/2026
Special inspection requirement — Lighting in dwelling units
06/09/2026
Special inspection requirement — Permanent certificate
06/09/2026
Special inspection requirement — Insulation placement and R values
06/09/2026
Special inspection requirement — Air barrier - visual inspection
06/09/2026
Special inspection requirement — Fenestration air leakage
06/09/2026
Special inspection requirement — Interior lighting power
06/09/2026
Special inspection requirement — Maintenance information
06/09/2026
Special inspection requirement — Air barrier — testing
06/09/2026
Special inspection requirement — Lighting controls
06/09/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
06/09/2026
Special inspection requirement — Fenestration areas
06/09/2026
Special inspection requirement — Metering
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOHAMMAD AHEAD, PE307/09/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YAFE MEOD CORPGeneral Contractor107/08/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedYAFE MEOD CORP07/06/2026
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
06/09/2026Concrete - Cast-In-Place—special
06/09/2026Fire-Resistant Penetrations and Joints—special
06/09/2026Structural Stability – Alterations of existing buildings—special
06/09/2026Exterior Insulation and Finish Systems (EIFS)—special
06/09/2026Energy Code Compliance Inspections—progress
06/09/2026Fire-Resistance Rated Construction—progress
06/09/2026Lighting in dwelling units—energy_progress
06/09/2026Permanent certificate—energy_progress
06/09/2026Insulation placement and R values—energy_progress
06/09/2026Air barrier - visual inspection—energy_progress
06/09/2026Fenestration air leakage—energy_progress
06/09/2026Interior lighting power—energy_progress
06/09/2026Maintenance information—energy_progress
06/09/2026Air barrier — testing —energy_progress
06/09/2026Lighting controls—energy_progress
06/09/2026Fenestration and door U-factor and product ratings—energy_progress
06/09/2026Fenestration areas—energy_progress
06/09/2026Metering—energy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/16/2026Q01413719-P1Request digital key ↗
08/16/2026Q01413719-S2Request digital key ↗
08/15/2026Q01413719-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026Q01413719-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/16/2026Q01413719-I1Open ↗
08/16/2026Q01413719-P1Open ↗
08/16/2026Q01413719-S2Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/15/2026Q01413719-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026Q01413719-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/15/2026Q01413719-I1Open ↗