← Back
Over six families without stores
60-52 MADISON STREET
QUEENS · BIN 4084962
💬 Discuss this project
1920Year Built
5Stories
C1Building Class
R5BZoning
50,460 sfGross Floor Area
48Units
LL97 CoveredRent Stabilized3 Open Violations 2 unresolved · 1 paperwork only ▸
Over six families without stores · Owner of record: 60-52 MADISON STREETASSOCIATES · 11,600 sf lot · 4.35 FAR built · Flood zone X
Locations of Work
Mechanical
Cellar2p · 2 filings · 19 docs
3 jobs · most recent 06/24/2026
Boiler Controls
FiledStatusContractorScope
06/24/2026Permit IssuedRICHARD NEU—
04/29/2021CompleteABILENE ELECTRIC INC—
04/29/2021CompleteABILENE ELECTRIC INCBoiler Controls
Building Lifecycle
All (88)Filed (5)Permit Issued (6)Signed Off (2)Violation (60)Objection (4)Special Inspection (11)
09/22/2026
Permit issued — Sidewalk Shed
Q01421309-I1-SH
09/16/2026
Permit issued — General Construction
Q01448763-I1-GC
09/11/2026
Objection resolved — Addressed
09/11/2026
Objection resolved — Addressed
09/11/2026
Special inspection requirement — Masonry
Younes Abouyaala
09/11/2026
Special inspection requirement — Energy Code Compliance Inspections
JEFFREY BELL
09/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
09/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
09/01/2026
Objection raised — Other
09/01/2026
Objection raised — Other
08/21/2026
Filed — Alteration
FILING TO SHOW WINDOW REPLACEMENT AS PER PLANS. NO CHANGE TO USE, EGRESS, AND/OR OCCUPANCY
Q01448763-I1
08/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
06/25/2026
Permit issued — Sidewalk Shed
Q01421309-I1-SH
06/24/2026
Filed — Alteration
Q01421309-I1
06/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/10/2022
Violation issued (HPD, closed)
C
12/10/2022
Violation issued (HPD, closed)
B
11/16/2022
Violation issued (HPD, closed)
I
11/16/2022
Violation issued (ECB, open)
Boilers
03/04/2022
Violation issued (HPD, closed)
I
03/04/2022
Violation issued (HPD, closed)
A
03/03/2022
Violation issued (HPD, closed)
C
03/03/2022
Violation issued (HPD, closed)
B
03/03/2022
Violation issued (HPD, closed)
B
03/03/2022
Violation issued (HPD, closed)
C
03/03/2022
Violation issued (HPD, closed)
C
03/03/2022
Violation issued (HPD, closed)
C
03/03/2022
Violation issued (HPD, closed)
C
01/26/2021
Signed off — Alteration
Q00226608-I1
08/26/2020
Filed — Alteration
Q00226608-P1
08/26/2020
Special inspection requirement — HVAC and service water heating equipment
Joseph Bazini
08/26/2020
Special inspection requirement — Heating Systems
Joseph Bazini
08/26/2020
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Joseph Bazini
08/03/2020
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Joseph Bazini
08/03/2020
Special inspection requirement — HVAC and service water heating equipment
Joseph Bazini
08/03/2020
Special inspection requirement — Heating Systems
Joseph Bazini
07/01/2020
Permit issued — Boiler Equipment
Q00226608-I1-BE
02/24/2020
Signed off — Alteration
INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00224692-I1
01/07/2020
Violation issued (HPD, closed)
A
01/07/2020
Violation issued (HPD, closed)
B
01/07/2020
Violation issued (HPD, closed)
C
01/07/2020
Violation issued (HPD, closed)
C
01/07/2020
Violation issued (HPD, closed)
C
01/07/2020
Violation issued (HPD, closed)
A
12/31/2019
Violation issued (HPD, closed)
C
12/31/2019
Violation issued (HPD, closed)
B
10/17/2019
Permit issued — Boiler Equipment
Q00226608-I1-BE
10/16/2019
Filed — Alteration
Q00226608-I1
09/17/2019
Filed — Alteration
INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00224692-I1
09/17/2019
Permit issued — Mechanical Systems
Q00224692-I1-MS
05/31/2019
Violation issued (HPD, closed)
C
04/03/2019
Violation issued (HPD, closed)
A
04/03/2019
Violation issued (HPD, closed)
C
03/01/2019
Violation issued (HPD, closed)
A
03/01/2019
Violation issued (HPD, closed)
B
03/01/2019
Violation issued (HPD, closed)
A
03/01/2019
Violation issued (HPD, closed)
A
02/12/2018
Violation issued (HPD, closed)
C
01/10/2018
Violation issued (HPD, closed)
A
Latest 60 of 88 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RELIABLE ENTERPRISES309/23/2026
BENENSON REAL ESTATE809/17/2026
60-52 MADISON STREETASSOCIATES503/22/2026
TWIN CONTRACTORS503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JBA108/21/2026
MCHENERY TESTING LAB106/24/2026
BAZINI ENGINEERING, P.C.308/26/2020
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GUARANTEED HOME IMPROVEMEGeneral Contractor303/21/2026
RELIABLE ENTERPRISES INCGeneral Contractor209/23/2026
KC EXPEDITING INCGeneral Contractor109/17/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808308/26/2020
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC09/22/2026
DOB NOWGeneral ConstructionPermit IssuedKC EXPEDITING INC09/16/2026
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC06/25/2026
DOB NOWBoiler EquipmentSigned-offABILENE, INC07/01/2020
DOB NOWBoiler EquipmentSigned-offABILENE, INC10/17/2019
DOB NOWMechanical SystemsSigned-offGUARANTEED HOME IMPROVEME09/17/2019
BISOTISSUEDTWIN CONTRACTORS INC06/19/2012
BISOTISSUEDTWIN CONTRACTORS INC03/02/2012
BISEQISSUEDMSS CONSTRUCTION CORP01/12/2007
BISOTISSUEDALPHA RESTORATION & WATERPROOF11/03/2006
BISEQISSUEDMSS CONSTRUCTION CORP09/11/2006
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
09/11/2026MasonryYounes Abouyaalaspecial
09/11/2026Energy Code Compliance InspectionsJEFFREY BELLprogress
09/11/2026Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
09/11/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/20/2026Tenant Protection Plan ComplianceYounes Abouyaalaspecial
08/26/2020HVAC and service water heating equipment Joseph Bazinienergy_progress
08/26/2020Heating SystemsJoseph Bazinispecial
08/26/2020Fuel-Oil Storage and Fuel-Oil Piping SystemsJoseph Bazinispecial
08/03/2020Fuel-Oil Storage and Fuel-Oil Piping SystemsJoseph Bazinispecial
08/03/2020HVAC and service water heating equipment Joseph Bazinienergy_progress
08/03/2020Heating SystemsJoseph Bazinispecial
▾Documents — 56 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch2
08/22/2026Q01448763-I1Request digital key ↗
08/16/2026Q01421309-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment2
08/28/2026Q00226608-I1Request digital key ↗
08/15/2026Q00226608-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/28/2026Q00224692-I1Request digital key ↗
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION3
11/27/2013440116777Open ↗
07/11/2013420539714Open ↗
03/02/2012420539714Open ↗
▸BISWORK PERMIT APPLICATION3
11/27/2013440116777Open ↗
06/20/2012420539714Open ↗
03/05/2012420539714Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
12/30/2013420539714Open ↗
▸Seals & Professional Certifications21
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026Q00226608-I1Open ↗
09/23/2026Q00226608-I1Open ↗
09/23/2026Q01448763-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/22/2026Q01448763-I1Open ↗
08/16/2026Q01421309-I1Open ↗
08/13/2026Q00224692-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
12/30/2013420539714Open ↗
12/30/2013440116777Open ↗
03/02/2012420539714Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/23/2026Q00226608-I1Open ↗
09/23/2026Q01448763-I1Open ↗
09/02/2026Q00226608-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/27/2013440116777Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/02/2012420539714Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/27/2013440116777Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/02/2012420539714Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/27/2013440116777Open ↗
▸Safety & Tenant Protection3
▸DOB NOWTenant Protection Plan3
08/13/2026Q00224692-I1Open ↗
08/13/2026Q00226608-I1Open ↗
08/13/2026Q00226608-P1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/23/2026Q01448763-I1Open ↗
08/13/2026Q00224692-I1Open ↗
08/13/2026Q00226608-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/02/2012420539714Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY1
03/02/2012420539714Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/30/2013420539714Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/30/2013420539714Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00226608-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
11/27/2013440116777Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
12/30/2013420539714Open ↗
12/30/2013440116777Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/02/2012420539714Open ↗
▸BISSHED LETTER1
12/30/2013440116777Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/30/2013420539714Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/30/2013420539714Open ↗
03/02/2012420539714Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET1
03/02/2012420539714Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/27/2013440116777Open ↗
▸BISADDITIONAL INFORMATION1
08/26/2013420539714Open ↗