← Back
Four families
1726 SUMMERFIELD STREET
QUEENS · BIN 4086056
💬 Discuss this project
1931Year Built
2Stories
C3Building Class
R5BZoning
3,100 sfGross Floor Area
4Units
Rent Stabilized0 Open Violations
Four families · Owner of record: CRYSTAL STREAM PROPERTY LLC · 2,500 sf lot · 1.24 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
Floor 2Under Construction3p · 2 filings · 20 docs
Floor 1Under Construction4p · 2 filings · 20 docs
CellarUnder Construction4p · 2 filings · 20 docs
1 job · most recent 02/06/2025
General Wiring
FiledStatusContractorScope
02/06/2025CompleteR & T ELECTRICAL CORPGeneral Wiring
Building Lifecycle
All (87)Filed (4)Permit Issued (4)Signed Off (2)Violation (14)Inspection (11)Objection (22)Special Inspection (30)
07/01/2026
Signed off — Alteration CO
PROPOSE INTERIOR RENOVATION FOR EXISTING 4-DWELLING BUILDING AS PER PLAN FILED HEREWITH. CHANGE OF C/O.
Q01190254-I1
06/15/2026
Special inspection requirement — Fenestration air leakage
YAN GAO
06/15/2026
Special inspection requirement — Interior lighting power
YAN GAO
06/15/2026
Special inspection requirement — Air barrier — testing
YAN GAO
06/15/2026
Special inspection requirement — Air barrier - visual inspection
YAN GAO
06/15/2026
Special inspection requirement — Fenestration areas
YAN GAO
06/15/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
YAN GAO
06/15/2026
Special inspection requirement — Permanent certificate
YAN GAO
06/15/2026
Special inspection requirement — Insulation placement and R values
YAN GAO
06/15/2026
Special inspection requirement — Metering
YAN GAO
06/15/2026
Special inspection requirement — Fire-Resistance Rated Construction
YAN GAO
06/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
YAN GAO
06/15/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
YAN GAO
06/15/2026
Special inspection requirement — Energy Code Compliance Inspections
YAN GAO
06/01/2026
Filed — Alteration CO
PROPOSE INTERIOR RENOVATION FOR EXISTING 4-DWELLING BUILDING AS PER PLAN FILED HEREWITH. CHANGE OF C/O.
Q01190254-P1
06/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
YAN GAO
06/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
YAN GAO
06/01/2026
Special inspection requirement — Energy Code Compliance Inspections
YAN GAO
06/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
YAN GAO
06/01/2026
Special inspection requirement — Fenestration air leakage
YAN GAO
06/01/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
YAN GAO
06/01/2026
Special inspection requirement — Air barrier — testing
YAN GAO
06/01/2026
Special inspection requirement — Fenestration areas
YAN GAO
06/01/2026
Special inspection requirement — Metering
YAN GAO
06/01/2026
Special inspection requirement — Permanent certificate
YAN GAO
06/01/2026
Special inspection requirement — Interior lighting power
YAN GAO
06/01/2026
Special inspection requirement — Insulation placement and R values
YAN GAO
06/01/2026
Special inspection requirement — Air barrier - visual inspection
YAN GAO
05/15/2026
Signed off — Alteration
PLUMBING WORK OF EXISTING 4-FAMILY BUILDING AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01041986-S1
04/27/2026
Inspection — Fail-Final Construction Permit Withdrawal
Fail
View inspection ↗
04/15/2026
Inspection — Fail-Final Construction Permit Withdrawal
Fail
View inspection ↗
04/15/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/07/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/07/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/10/2026
Permit issued — Plumbing
Q01041986-S1-PL
03/10/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/29/2026
Permit issued — General Construction
Q01190254-I1-GC
11/12/2025
Objection resolved — Addressed
10/14/2025
Objection resolved — Addressed
10/14/2025
Objection resolved — Addressed
08/11/2025
Objection resolved — Addressed
08/11/2025
Objection resolved — Addressed
06/18/2025
Objection resolved — Addressed
06/12/2025
Violation issued (HPD, closed)
A
05/28/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/12/2025
Objection resolved — Addressed
05/02/2025
Objection resolved — Addressed
05/02/2025
Objection resolved — Addressed
04/28/2025
Objection raised — Admin
04/28/2025
Objection raised — Fire_Protection
04/28/2025
Objection raised — Scope
04/28/2025
Objection raised — Plumbing
04/28/2025
Objection raised — Structural
04/28/2025
Objection raised — Structural
04/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/10/2025
Objection resolved — Addressed
04/09/2025
Objection raised — Cost
03/21/2025
Objection resolved — Addressed
03/20/2025
Objection raised — Admin
03/20/2025
Objection raised — Admin
Latest 60 of 87 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CRYSTAL STREAM PROPERTY LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/01/2023$932K—— → —$301/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALPHA HOME DESIGN LLC406/01/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INDESIGN STUDIO603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GREAT ONE CONSTRUCTION LLGeneral Contractor307/08/2026
XH&RC PLBG AND HTG INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YAN GAO6619406/01/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC03/10/2026
DOB NOWGeneral ConstructionPermit IssuedGREAT ONE CONSTRUCTION LL01/29/2026
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC06/07/2024
DOB NOWGeneral ConstructionPermit IssuedGREAT ONE CONSTRUCTION LL05/22/2024
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
04/27/2026Fail-Final Construction Permit WithdrawalFailView ↗
04/15/2026Fail-Final Construction Permit WithdrawalFailView ↗
04/15/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/07/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/07/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/28/2025Fail-Final General Construction Non-Directive 14FailView ↗
04/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/17/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/17/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
06/15/2026Fenestration air leakageYAN GAOenergy_progress
06/15/2026Interior lighting powerYAN GAOenergy_progress
06/15/2026Air barrier — testing YAN GAOenergy_progress
06/15/2026Air barrier - visual inspectionYAN GAOenergy_progress
06/15/2026Fenestration areasYAN GAOenergy_progress
06/15/2026Fenestration and door U-factor and product ratingsYAN GAOenergy_progress
06/15/2026Permanent certificateYAN GAOenergy_progress
06/15/2026Insulation placement and R valuesYAN GAOenergy_progress
06/15/2026MeteringYAN GAOenergy_progress
06/15/2026Fire-Resistance Rated ConstructionYAN GAOprogress
06/15/2026Fire-Resistant Penetrations and JointsYAN GAOspecial
06/15/2026Structural Stability – Alterations of existing buildingsYAN GAOspecial
06/15/2026Energy Code Compliance InspectionsYAN GAOprogress
06/01/2026Fire-Resistant Penetrations and JointsYAN GAOspecial
06/01/2026Structural Stability – Alterations of existing buildingsYAN GAOspecial
06/01/2026Energy Code Compliance InspectionsYAN GAOprogress
06/01/2026Fire-Resistance Rated ConstructionYAN GAOprogress
06/01/2026Fenestration air leakageYAN GAOenergy_progress
06/01/2026Fenestration and door U-factor and product ratingsYAN GAOenergy_progress
06/01/2026Air barrier — testing YAN GAOenergy_progress
06/01/2026Fenestration areasYAN GAOenergy_progress
06/01/2026MeteringYAN GAOenergy_progress
06/01/2026Permanent certificateYAN GAOenergy_progress
06/01/2026Interior lighting powerYAN GAOenergy_progress
06/01/2026Insulation placement and R valuesYAN GAOenergy_progress
Latest 25 of 36.
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/22/2026Q01041986-S1Request digital key ↗
08/22/2026Q01041986-I1Request digital key ↗
08/16/2026Q01190254-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZoning Exhibit form (1-5)2
08/16/2026Q01190254-P1Open ↗
08/13/2026Q01190254-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01190254-I1Open ↗
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature8
08/31/2026Q01190254-P1Open ↗
08/31/2026Q01190254-P1Open ↗
08/26/2026Q01041986-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/22/2026Q01041986-S1Open ↗
08/22/2026Q01041986-I1Open ↗
08/16/2026Q01190254-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026Q01190254-P1Open ↗
08/26/2026Q01041986-S1Open ↗
08/23/2026Q01190254-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/16/2026Q01190254-P1Open ↗
08/13/2026Q01190254-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/22/2026Q01041986-I1Open ↗
08/22/2026Q01041986-S1Open ↗
08/16/2026Q01190254-P1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/16/2026Q01190254-P1Open ↗
08/16/2026Q01190254-I1Open ↗
▸DOB NOWFinal Survey1
08/16/2026Q01190254-I1Open ↗