Miscellaneous one family
69-14 67 STREET
QUEENS · BIN 4088554
💬 Discuss this project
1925Year Built
2Stories
A9Building Class
R4-1Zoning
1,296 sfGross Floor Area
1Units
Miscellaneous one family · 1,924 sf lot · 0.67 FAR built · Flood zone X
Locations of Work
Architecture
Cellar2p · 1 filing · 13 docs
Nothing on file for this building.
Building Lifecycle
All (17)Filed (2)Permit Issued (1)Signed Off (1)Inspection (3)Special Inspection (10)
01/10/2022
Signed off — Alteration
REMOVE EXISTING OIL TANK, REPLACE EXISTING BOILER, AND INSTALL NEW H.W.H. IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q00606086-I1
11/12/2021
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/12/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/08/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
HO YIN LAW
11/08/2021
Special inspection requirement — Energy Code Compliance Inspections
HO YIN LAW
11/08/2021
Special inspection requirement — HVAC-R and service water heating equipment
HO YIN LAW
11/08/2021
Special inspection requirement — HVAC-R and service water heating system controls
HO YIN LAW
11/08/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
HO YIN LAW
11/05/2021
Filed — Alteration
REMOVE EXISTING OIL TANK, REPLACE EXISTING BOILER, AND INSTALL NEW H.W.H. IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q00606086-P1
11/05/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
HO YIN LAW
11/05/2021
Special inspection requirement — Energy Code Compliance Inspections
HO YIN LAW
11/05/2021
Special inspection requirement — HVAC-R and service water heating equipment
HO YIN LAW
11/05/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
HO YIN LAW
11/05/2021
Special inspection requirement — HVAC-R and service water heating system controls
HO YIN LAW
11/04/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/07/2021
Permit issued — Plumbing
Q00606086-I1-PL
10/05/2021
Filed — Alteration
REMOVE EXISTING OIL TANK, REPLACE EXISTING BOILER, AND INSTALL NEW H.W.H. IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q00606086-I1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BASIC GROUPS CORP703/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/15/2016$498K—— → —$384/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KL INNOVATIVE DESIGN INC211/05/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KL INNOVATIVE DESIGN INC7225211/05/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offT & T PLUMBING INC10/07/2021
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/12/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/12/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/04/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
11/08/2021Fire-Resistant Penetrations and JointsHO YIN LAWspecial
11/08/2021Energy Code Compliance InspectionsHO YIN LAWprogress
11/08/2021HVAC-R and service water heating equipmentHO YIN LAWenergy_progress
11/08/2021HVAC-R and service water heating system controlsHO YIN LAWenergy_progress
11/08/2021HVAC-R and service water piping design and insulationHO YIN LAWenergy_progress
11/05/2021Fire-Resistant Penetrations and JointsHO YIN LAWspecial
11/05/2021Energy Code Compliance InspectionsHO YIN LAWprogress
11/05/2021HVAC-R and service water heating equipmentHO YIN LAWenergy_progress
11/05/2021HVAC-R and service water piping design and insulationHO YIN LAWenergy_progress
11/05/2021HVAC-R and service water heating system controlsHO YIN LAWenergy_progress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/27/2026Q00606086-P1Request digital key ↗
08/27/2026Q00606086-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature4
09/28/2026Q00606086-I1Open ↗
09/28/2026Q00606086-I1Open ↗
08/25/2026Q00606086-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/27/2026Q00606086-I1Open ↗
08/27/2026Q00606086-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/28/2026Q00606086-I1Open ↗
08/25/2026Q00606086-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/27/2026Q00606086-I1Open ↗
08/27/2026Q00606086-P1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00606086-I1Open ↗