Five to six families
69-79 75 STREET
QUEENS · BIN 4092114
💬 Discuss this project
1920Year Built
2Stories
C2Building Class
M1-1Zoning
3,700 sfGross Floor Area
5Units
8 Open Violations 1 unresolved · 7 paperwork only ▸FDNY Report ↗
Five to six families · 2,500 sf lot · 1.48 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/06/2025$999K—— → —$270/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRANK J QUATELA ARCHITECT P.C303/03/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Manetta architecture design pllc603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KNS BUILDING REST. INCGeneral Contractor104/09/2026
Building Lifecycle
All (89)Filed (3)Permit Issued (1)Violation (16)Objection (41)Special Inspection (28)
08/25/2026
Objection resolved — Resolved
08/25/2026
Objection resolved — Resolved
08/25/2026
Objection resolved — Resolved
08/25/2026
Objection resolved — Resolved
08/13/2026
Objection resolved — Resolved
08/13/2026
Objection resolved — Resolved
08/12/2026
Objection raised — Inspections
08/12/2026
Objection raised — Zoning
07/10/2026
Objection resolved — Addressed
07/10/2026
Objection resolved — Addressed
04/20/2026
Objection resolved — Addressed
04/20/2026
Objection resolved — Addressed
04/20/2026
Objection resolved — Resolved
04/20/2026
Objection resolved — Addressed
04/20/2026
Objection resolved — Addressed
04/20/2026
Objection resolved — Open
04/20/2026
Objection resolved — Addressed
04/20/2026
Objection resolved — Resolved
04/20/2026
Objection resolved — Addressed
04/20/2026
Objection resolved — Resolved
04/20/2026
Objection resolved — Resolved
04/20/2026
Objection resolved — Addressed
04/19/2026
Objection raised — Plumbing
04/19/2026
Objection raised — Plumbing
04/19/2026
Objection raised — Zoning
04/19/2026
Objection raised — Admin
04/17/2026
Objection raised — Structural
04/17/2026
Objection raised — Structural
04/17/2026
Objection raised — Structural
04/17/2026
Objection raised — Structural
04/17/2026
Objection raised — Zoning
04/17/2026
Objection raised — Zoning
04/17/2026
Objection raised — Zoning
04/17/2026
Objection raised — Zoning
04/17/2026
Objection raised — Fire_Protection
04/17/2026
Objection raised — Zoning
04/17/2026
Objection raised — Admin
04/17/2026
Objection raised — Scope
04/17/2026
Objection raised — Structural
04/17/2026
Objection raised — Energy
04/17/2026
Objection raised — Plumbing
03/03/2026
Filed — Alteration CO
CAP AND REMOVE EXISTING PLUMBING FIXTURES AND INSTALL NEW FIXTURES AS PER PLANS. FILED IN CONJUNCTION WITH GC #Q01364800-I1. RESOLVE ECB VIOLATIONS 39110417X, 39025806N ADDITIONAL LISTED ON PW1
Q01364800-I1
03/03/2026
Filed — Alteration CO
CAP AND REMOVE EXISTING PLUMBING FIXTURES AND INSTALL NEW FIXTURES AS PER PLANS. FILED IN CONJUNCTION WITH GC #Q01364800-I1. RESOLVE ECB VIOLATIONS 39110417X, 39025806N ADDITIONAL LISTED ON PW1
Q01364800-S1
02/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/27/2026
Special inspection requirement — Energy Code Compliance Inspections
02/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
02/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
02/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
02/27/2026
Special inspection requirement — Maintenance information
02/27/2026
Special inspection requirement — Permanent certificate
02/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
02/26/2026
Special inspection requirement — Fenestration air leakage
02/26/2026
Special inspection requirement — Metering
02/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
02/26/2026
Special inspection requirement — Insulation placement and R values
02/26/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
02/26/2026
Special inspection requirement — Permanent certificate
02/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/26/2026
Special inspection requirement — Fenestration areas
02/26/2026
Special inspection requirement — Air barrier - visual inspection
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedKNS BUILDING REST10/31/2025
1 project · most recent 03/03/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/03/2026——Heating and Air Conditioning Systems
Heat / Cool
Fujitsu AOU36RLXFZH 3 tons · Condensing Unit ×3
1 project · most recent 03/03/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/03/2026——Gas, Water/Sanitary
1 project · most recent 03/03/2026
Wood
FiledStatusContractorScope
03/03/2026——Wood
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
02/27/2026Fire-Resistant Penetrations and Joints—special
02/27/2026Energy Code Compliance Inspections—progress
02/27/2026HVAC-R and service water piping design and insulation—energy_progress
02/27/2026HVAC-R and service water heating system controls—energy_progress
02/27/2026HVAC-R and service water heating equipment—energy_progress
02/27/2026Maintenance information—energy_progress
02/27/2026Permanent certificate—energy_progress
02/26/2026Fire-Resistance Rated Construction—progress
02/26/2026Fenestration air leakage—energy_progress
02/26/2026Metering—energy_progress
02/26/2026HVAC-R and service water heating equipment—energy_progress
02/26/2026Insulation placement and R values—energy_progress
02/26/2026Fenestration and door U-factor and product ratings—energy_progress
02/26/2026Permanent certificate—energy_progress
02/26/2026Structural Stability – Alterations of existing buildings—special
02/26/2026Fenestration areas—energy_progress
02/26/2026Air barrier - visual inspection—energy_progress
02/26/2026HVAC-R and service water heating system controls—energy_progress
02/26/2026Maintenance information—energy_progress
02/26/2026Ventilation and air distribution system—energy_progress
02/26/2026HVAC-R and service water piping design and insulation—energy_progress
02/26/2026Interior lighting power—energy_progress
02/26/2026Mechanical Systems—special
02/26/2026Concrete - Cast-In-Place—special
02/26/2026Fire-Resistant Penetrations and Joints—special
Latest 25 of 28.
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/18/2026Q01304707-I1Request digital key ↗
08/17/2026Q01364800-S1Request digital key ↗
08/15/2026Q01364800-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/15/2026Q01364800-I1Open ↗
08/13/2026Q01364800-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026Q01364800-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/18/2026Q01304707-I1Open ↗
08/13/2026Q01364800-S1Open ↗
08/13/2026Q01364800-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01364800-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026Q01364800-S1Open ↗
08/15/2026Q01364800-I1Open ↗
▸Other Documents5
▸DOB NOWPlot Diagram2
08/15/2026Q01364800-I1Open ↗
08/13/2026Q01364800-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01364800-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01364800-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026Q01364800-I1Open ↗