← Back
Factory, industrial, miscellaneous
88-43 76 AVENUE
QUEENS · BIN 4094430
💬 Discuss this project
1983Year Built
2Stories
F9Building Class
M1-2Zoning
13,654 sfGross Floor Area
2Units
0 Open Violations
Factory, industrial, miscellaneous · Owner of record: MULLOUK LLC · 22,000 sf lot · 0.62 FAR built · Flood zone X
Locations of Work
Architecture
Roof2p · 1 filing · 8 docs
4 jobs · most recent 04/18/2026
General Wiring
FiledStatusContractorScope
04/18/2026CompleteASKO ELEC CONST & MAIN IN—
09/13/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
03/25/2022CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
03/17/2021CompleteGEORGE HOLNESSGeneral Wiring
Building Lifecycle
All (20)Filed (6)Permit Issued (3)Signed Off (2)Violation (4)Inspection (5)
07/06/2026
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
06/11/2026
Inspection — Fail-Final Sign Permit Inspection
Fail
View inspection ↗
05/28/2026
Permit issued — Sign
Q01396172-I1-SG
05/02/2026
Filed — Alteration
Q01396172-I1
07/18/2024
Signed off — Alteration
INSTALLATION OF A PREFABRICATED SPRAY BOOTH AND MIXING ROOM. NO CHANGE IN EGRESS, OCCUPANCY, OR USE. PLUMBING WORK FILED SEPARATELY UNDER Q00479512-I1. DRY CHEMICAL FIRE SUPPRESSION SYSTEM FILED SEPARATELY BY OTHERS.
Q00478715-I1
07/15/2024
Signed off — Alteration
INSTALLATION OF NEW GAS METER AND GAS PIPING CONNECTING TO DIRECT-FIRED GAS BURNER INCLUDED IN NEW SPRAY PAINT BOOTH FILED UNDER DOB NOW JOB NO.Q00478715-I1. NO CHANGE IN EGRESS, OCCUPANCY, OR USE.
Q00479512-I1
10/21/2022
Violation issued (ECB, closed)
Construction
07/19/2022
Violation issued (ECB, closed)
Construction
03/04/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/01/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/07/2022
Filed — Alteration
INSTALLATION OF NEW GAS METER AND GAS PIPING CONNECTING TO DIRECT-FIRED GAS BURNER INCLUDED IN NEW SPRAY PAINT BOOTH FILED UNDER DOB NOW JOB NO.Q00478715-I1. NO CHANGE IN EGRESS, OCCUPANCY, OR USE.
Q00479512-P2
12/15/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/23/2021
Filed — Alteration
INSTALLATION OF NEW GAS METER AND GAS PIPING CONNECTING TO DIRECT-FIRED GAS BURNER INCLUDED IN NEW SPRAY PAINT BOOTH FILED UNDER DOB NOW JOB NO.Q00478715-I1. NO CHANGE IN EGRESS, OCCUPANCY, OR USE.
Q00479512-P1
08/23/2021
Filed — Alteration
INSTALLATION OF A PREFABRICATED SPRAY BOOTH AND MIXING ROOM. NO CHANGE IN EGRESS, OCCUPANCY, OR USE. PLUMBING WORK FILED SEPARATELY UNDER Q00479512-I1. DRY CHEMICAL FIRE SUPPRESSION SYSTEM FILED SEPARATELY BY OTHERS.
Q00478715-P1
08/13/2021
Permit issued — Plumbing
Q00479512-I1-PL
08/11/2021
Permit issued — Mechanical Systems
Q00478715-I1-GC-CX
04/20/2021
Filed — Alteration
INSTALLATION OF A PREFABRICATED SPRAY BOOTH AND MIXING ROOM. NO CHANGE IN EGRESS, OCCUPANCY, OR USE. PLUMBING WORK FILED SEPARATELY UNDER Q00479512-I1. DRY CHEMICAL FIRE SUPPRESSION SYSTEM FILED SEPARATELY BY OTHERS.
Q00478715-I1
04/20/2021
Filed — Alteration
INSTALLATION OF NEW GAS METER AND GAS PIPING CONNECTING TO DIRECT-FIRED GAS BURNER INCLUDED IN NEW SPRAY PAINT BOOTH FILED UNDER DOB NOW JOB NO.Q00478715-I1. NO CHANGE IN EGRESS, OCCUPANCY, OR USE.
Q00479512-I1
12/29/1992
Violation issued (ECB, closed)
Construction
01/30/1991
Violation issued (ECB, closed)
Construction
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AFC ENTERPRISES103/22/2026
ANDREW CATAPANO CO INC103/22/2026
EAST COAST AUTO PLAZA INC.103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/18/2024$6.2M—C FIVE NEW YORK LLC → MULLOUK LLC$456/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YOUN DESIGN CORP.105/02/2026
AMC ENGINEERING PLLC501/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FAVIO MARIA BARRIONUEVO1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CENTRAL SPRAY BOOTHS INCGeneral Contractor303/21/2026
JOSEPH WEINSTEIN ELECTRICElectrical103/22/2026
RAYMOND'S PLBG & HTG LLCPlumbing107/08/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMC ENGINEERING PLLC3716208/23/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC05/28/2026
DOB NOWPlumbingSigned-offRAYMOND'S PLBG & HTG LLC08/13/2021
DOB NOWMechanical SystemsSigned-offCENTRAL SPRAY BOOTHS INC08/11/2021
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/06/2026Pass-Final Sign Permit InspectionPassView ↗
06/11/2026Fail-Final Sign Permit InspectionFailView ↗
03/04/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/01/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/15/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026Q00479512-I1Request digital key ↗
08/27/2026Q00479512-P2Request digital key ↗
08/27/2026Q00479512-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026Q00478715-I1Open ↗
08/17/2026Q01396172-I1Open ↗
08/13/2026Q00478715-P1Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWFDNY Approval Letter1
08/13/2026Q00478715-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026Q00478715-I1Open ↗
08/13/2026Q00479512-I1Open ↗
08/13/2026Q00479512-P2Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00478715-I1Open ↗