← Back
Factory, light manufacturing
88-16 77 AVENUE
QUEENS · BIN 4094434
💬 Discuss this project
1960Year Built
1Stories
F5Building Class
M1-1Zoning
2,600 sfGross Floor Area
1Units
0 Open Violations
Factory, light manufacturing · Owner of record: HAROLD & CHRISTINE RASTETTER TRUST, DATE D 7/27/15 · 6,000 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HIGH POINT ENGINEERING507/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HIGH POINT ENGINEERING212/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIGH POINT ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JD MASTERS PLUMBING & HEAGeneral Contractor104/09/2026
JD MASTERS PLBG & HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HIGH POINT ENGINEERING1151112/10/2025
Building Lifecycle
All (19)Filed (2)Permit Issued (2)Signed Off (2)Violation (3)Inspection (4)Special Inspection (6)
05/07/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/15/2026
Signed off — Alteration
MH/GC work scope associated with the decommissioning of the existing gas boiler and abandoning in place. Installation of (5 HVAC Split ductless condenser and air handling units. Secure Certificate of Compliance. No change in use, egress or occupancy.
Q01319278-S1
04/14/2026
Signed off — Alteration
MH/GC work scope associated with the decommissioning of the existing gas boiler and abandoning in place. Installation of (5 HVAC Split ductless condenser and air handling units. Secure Certificate of Compliance. No change in use, egress or occupancy.
Q01319278-I1
04/07/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/07/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/30/2025
Permit issued — Mechanical Systems
Q01319278-I1-GC-CX
12/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/16/2025
Permit issued — Plumbing
Q01319278-S1-PL
12/10/2025
Filed — Alteration
MH/GC work scope associated with the decommissioning of the existing gas boiler and abandoning in place. Installation of (5 HVAC Split ductless condenser and air handling units. Secure Certificate of Compliance. No change in use, egress or occupancy.
Q01319278-S1
12/10/2025
Filed — Alteration
MH/GC work scope associated with the decommissioning of the existing gas boiler and abandoning in place. Installation of (5 HVAC Split ductless condenser and air handling units. Secure Certificate of Compliance. No change in use, egress or occupancy.
Q01319278-I1
12/08/2025
Special inspection requirement — Heating Systems
Christopher Tartaglia
12/08/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher Tartaglia
12/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Tartaglia
12/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Tartaglia
11/14/2025
Special inspection requirement — Mechanical Systems
Christopher Tartaglia
11/14/2025
Special inspection requirement — Final
Christopher Tartaglia
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offJD MASTERS PLUMBING HEA12/30/2025
DOB NOWPlumbingSigned-offJD MASTERS PLBG & HTG12/16/2025
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/07/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/07/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/07/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
12/08/2025Heating SystemsChristopher Tartagliaspecial
12/08/2025Energy Code Compliance InspectionsChristopher Tartagliaprogress
12/08/2025HVAC-R and service water heating equipmentChristopher Tartagliaenergy_progress
12/08/2025HVAC-R and service water heating system controlsChristopher Tartagliaenergy_progress
11/14/2025Mechanical SystemsChristopher Tartagliaspecial
11/14/2025FinalChristopher Tartagliaprogress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/18/2026Q01319278-S1Request digital key ↗
08/18/2026Q01319278-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026Q01319278-I1Open ↗
09/02/2026Q01319278-I1Open ↗
09/02/2026Q01319278-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026Q01319278-I1Open ↗
08/13/2026Q01319278-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026Q01319278-I1Open ↗
09/02/2026Q01319278-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q01319278-I1Open ↗
08/13/2026Q01319278-S1Open ↗