← Back
Single or multiple dwelling with stores or offices
98-04 METROPOLITAN AVENUE
QUEENS · BIN 4095119
💬 Discuss this project
1930Year Built
2Stories
S9Building Class
R3-2Zoning
3,000 sfGross Floor Area
4Units
22 Open Violations 20 unresolved · 2 paperwork only ▸
Single or multiple dwelling with stores or offices · 1,967 sf lot · 1.53 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
2 jobs · most recent 01/24/2022
General Wiring
FiledStatusContractorScope
01/24/2022Permit IssuedWILLDAN ELECTRICAL OF NYGeneral Wiring
08/18/2021Permit IssuedRICHARD NEU—
Building Lifecycle
All (59)Filed (6)Permit Issued (5)Signed Off (5)Violation (36)Inspection (4)Special Inspection (3)
12/16/2025
Signed off — Alteration
CONNECT 2 RESIDENTIAL BOILERS TO EXISTING GAS PIPING.
Q01017878-I1
12/02/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/03/2025
Violation issued (ECB, open)
Construction
09/03/2025
Violation issued (ECB, open)
Construction
08/15/2025
Signed off — Alteration
Q01017914-I1
08/15/2025
Signed off — Alteration
Q01017914-S1
07/25/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/25/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/17/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/26/2025
Permit issued — Boiler Equipment
Q01017914-S1-BE
06/26/2025
Permit issued — Boiler Equipment
Q01017914-I1-BE
05/23/2025
Filed — Alteration
CONNECT 2 RESIDENTIAL BOILERS TO EXISTING GAS PIPING.
Q01017878-P1
05/13/2025
Permit issued — Plumbing
Q01017878-I1-PL
11/21/2024
Filed — Alteration
Q01017914-S1
11/20/2024
Filed — Alteration
CONNECT 2 RESIDENTIAL BOILERS TO EXISTING GAS PIPING.
Q01017878-I1
11/20/2024
Filed — Alteration
Q01017914-I1
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/10/2021
Signed off — Alteration
POINTING AND WINDOW LINTEL REPLACEMENT AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00578248-I1
11/05/2021
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00577746-I1
09/27/2021
Permit issued — General Construction
Q00578248-I1-GC
09/14/2021
Filed — Alteration
POINTING AND WINDOW LINTEL REPLACEMENT AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00578248-I1
08/26/2021
Permit issued — Sidewalk Shed
Q00577746-I1-SH
08/17/2021
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00577746-I1
08/17/2021
Special inspection requirement — Masonry
BRIAN T. O'CONNOR
08/17/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
BRIAN T. O'CONNOR
08/17/2021
Special inspection requirement — Final
Vicente Varela
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/09/2019
Violation issued (HPD, open)
A
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/10/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/12/2016
Violation issued (ECB, closed)
Construction
05/12/2016
Violation issued (ECB, closed)
Boilers
05/12/2016
Violation issued (ECB, closed)
Boilers
10/01/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/03/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/15/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/01/2013
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/13/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/01/2011
Violation issued (ECB, open)
Construction
01/13/2011
Violation issued (ECB, closed)
Unknown
10/12/2010
Violation issued (ECB, closed)
Unknown
05/13/2010
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/22/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/28/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JASCO407/08/2026
CLYDE HOOVER TRUST303/22/2026
11 POETA103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
G. PEROTTO ASSOCIATES405/23/2025
ARQUITECTURA VARELA109/14/2021
SYED ENGINEERING, P.C.108/17/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
G PEROTTO ASSOCIATES803/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JERRY'S PLBG & HVAC INCPlumbing307/08/2026
H AND J NY CONSTRUCTIONGeneral Contractor107/08/2026
JASCO, INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUTTERFIELD & O'CONNOR4189109/14/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offJERRY'S PLBG & HVAC INC06/26/2025
DOB NOWBoiler EquipmentSigned-offJERRY'S PLBG & HVAC INC06/26/2025
DOB NOWPlumbingSigned-offJERRY'S PLBG & HVAC INC05/13/2025
DOB NOWGeneral ConstructionSigned-offH AND J NY CONSTRUCTION09/27/2021
DOB NOWSidewalk ShedSigned-offJASCO, INC08/26/2021
BISPLISSUEDATLAS PLBG AND METER WKS05/01/2018
BISPLISSUEDATLAS PLBG AND METER WKS03/07/2017
BISMHISSUEDGRAND DEVELOPMENT LLC03/07/2017
BISEQISSUEDKNOWLTECH CONTRACTING INC06/16/2009
BISFPISSUEDFIRE COMMAND CO, INC12/17/2008
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/02/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/25/2025Pass-Final Boiler Equipment InspectionPassView ↗
07/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
08/17/2021MasonryBRIAN T. O'CONNORspecial
08/17/2021Structural Stability – Alterations of existing buildingsBRIAN T. O'CONNORspecial
08/17/2021FinalVicente Varelaprogress
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026Q00577746-I1Request digital key ↗
08/27/2026Q00578248-I1Request digital key ↗
08/21/2026Q01017914-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION7
08/22/2019421418932Open ↗
08/20/2019421418932Open ↗
03/10/2017421418932Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION5
05/08/2018421418932Open ↗
03/15/2017421418932Open ↗
03/15/2017421418932Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications18
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
10/03/2019421418932Open ↗
10/03/2019421418932Open ↗
08/05/2019421418932Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026Q00577746-I1Open ↗
08/20/2026Q01017878-I1Open ↗
08/13/2026Q00578248-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026Q00578248-I1Open ↗
09/02/2026Q00578248-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/02/2026Q00578248-I1Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
03/30/2018421418932Open ↗
03/10/2017421418932Open ↗
01/12/2017421418932Open ↗
▸BISEQUIPMENT USE PERMITS1
10/22/2019421418932Open ↗
▸BISSCHEDULE B - PLUMBING1
12/08/2008410201197Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
10/22/2019421418932Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
06/01/2009420023600Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/01/2009420023600Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/12/2017421418932Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/08/2008410201197Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q00578248-I1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/12/2017421418932Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/22/2019421418932Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
10/22/2019421418932Open ↗
08/05/2019421418932Open ↗
07/22/2009420023600Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
06/01/2009420023600Open ↗
12/08/2008410201197Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
10/22/2019421418932Open ↗
08/05/2019421418932Open ↗
01/12/2017421418932Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET2
01/12/2017421418932Open ↗
06/01/2009420023600Open ↗
▸BISADDITIONAL INFORMATION2
03/28/2018421418932Open ↗
02/18/2017421418932Open ↗
▸BISBOROUGH INTAKE FORM1
08/05/2019421418932Open ↗