← Back
Two stories - detached, small or mid-size
13-47 136 STREET
QUEENS · College Point · BIN 4097338
💬 Discuss this project
1955Year Built
2Stories
A1Building Class
R2AZoning
2,604 sfGross Floor Area
1Units
4 Open Violations ▸
Two stories - detached, small or mid-size · Owner of record: HOXHA LLC · 4,997 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalGeneral
Roof1p · 1 filing · 12 docs
Floor 225p · 2 filings · 20 docs
Floor 125p · 2 filings · 20 docs
Cellar24p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ALSS CONSTRUCTION403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/09/2023$900K—Private party → HOXHA LLC$346/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SERDAR CEYLAN ARCHITECT, PC711/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LLOYD NOEL BUILDING CONSULTANT103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALSS CONSTRUCTION INCGeneral Contractor1107/08/2026
AQUEDUCT MECHANICAL CORPPlumbing107/08/2026
G&B PLUMBING&HEATING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CEYLAN DESIGN AND CONSULT8422411/17/2025
WELLDONE INSPECTION INC.8628411/17/2025
Building Lifecycle
All (64)Filed (7)Permit Issued (11)Signed Off (2)Violation (4)Inspection (6)Objection (4)Special Inspection (30)
08/10/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/28/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
05/06/2026
Permit issued — Mechanical Systems
Q00965117-I1-GC-CX
01/09/2026
Signed off — Alteration
THE PLUMBING WORK TYPE IS FILED IN CONJUCTION WITH THE AS PER PLANS SUBMITTED.
Q00961378-I1
12/29/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
SERDAR CEYLAN
12/29/2025
Special inspection requirement — Insulation placement and R values
SERDAR CEYLAN
12/29/2025
Special inspection requirement — Maintenance information
SERDAR CEYLAN
12/29/2025
Special inspection requirement — Interior lighting power
SERDAR CEYLAN
12/29/2025
Special inspection requirement — Metering
SERDAR CEYLAN
12/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
SERDAR CEYLAN
12/29/2025
Special inspection requirement — Duct leakage testing, insulation and design
SERDAR CEYLAN
12/29/2025
Special inspection requirement — Air barrier - visual inspection
SERDAR CEYLAN
12/29/2025
Special inspection requirement — Fenestration areas
SERDAR CEYLAN
12/29/2025
Special inspection requirement — Air barrier — testing
QIUFAN JIANG
12/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
12/29/2025
Special inspection requirement — Lighting controls
SERDAR CEYLAN
12/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
SERDAR CEYLAN
12/29/2025
Special inspection requirement — Fenestration air leakage
SERDAR CEYLAN
12/29/2025
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
12/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERDAR CEYLAN
12/29/2025
Special inspection requirement — Heating Systems
SERDAR CEYLAN
12/29/2025
Special inspection requirement — Mechanical Systems
SERDAR CEYLAN
12/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
SERDAR CEYLAN
12/29/2025
Special inspection requirement — Masonry
SERDAR CEYLAN
12/29/2025
Special inspection requirement — Concrete - Cast-In-Place
SERDAR CEYLAN
12/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
QIUFAN JIANG
12/29/2025
Special inspection requirement — Shutoff dampers
SERDAR CEYLAN
12/29/2025
Special inspection requirement — Lowest Floor Elevation
QIUFAN JIANG
12/29/2025
Special inspection requirement — Permanent certificate
SERDAR CEYLAN
12/29/2025
Special inspection requirement — Final
SERDAR CEYLAN
12/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERDAR CEYLAN
12/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
12/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
SERDAR CEYLAN
12/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
SERDAR CEYLAN
12/09/2025
Signed off — Alteration
Q01006125-I1
12/05/2025
Objection resolved — Addressed
12/04/2025
Objection resolved — Addressed
12/03/2025
Objection raised — Other
11/28/2025
Objection raised — Other
11/17/2025
Filed — Alteration CO
PROPOSED A VERTICAL & HORIZONTAL ENLARGEMENT OF A 1 - FAMILY DWELLING BUILDING AS PER PLANS SUBMITTED AND OBTAIN A CERTIFICATE OF OCCUPANCY.
Q00965117-P1
11/14/2025
Filed — Alteration
THE PLUMBING WORK TYPE IS FILED IN CONJUCTION WITH THE AS PER PLANS SUBMITTED.
Q00961378-P3
07/23/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/27/2025
Permit issued — Plumbing
Q00961378-I1-PL
01/06/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/07/2024
Violation issued (ECB, open)
Construction
11/07/2024
Violation issued (ECB, open)
Unknown
11/07/2024
Violation issued (ECB, open)
Construction
11/07/2024
Violation issued (ECB, open)
Unknown
08/12/2024
Permit issued — Construction Fence
Q01006125-I1-FN
08/12/2024
Permit issued — General Construction
Q00965117-I1-GC-CX
08/12/2024
Permit issued — Foundation
Q00965117-S1-FO
08/12/2024
Permit issued — Structural
Q00965117-S2-ST
07/30/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/08/2024
Permit issued — Plumbing
Q00961378-I1-PL
05/06/2024
Permit issued — Foundation
Q00965117-S1-FO
05/06/2024
Permit issued — Structural
Q00965117-S2-ST
04/10/2024
Permit issued — Mechanical Systems
Q00965117-I1-GC-CX
03/29/2024
Filed — Alteration CO
PROPOSED A VERTICAL & HORIZONTAL ENLARGEMENT OF A 1 - FAMILY DWELLING BUILDING AS PER PLANS SUBMITTED AND OBTAIN A CERTIFICATE OF OCCUPANCY.
Q00965117-S2
03/29/2024
Filed — Alteration CO
PROPOSED A VERTICAL & HORIZONTAL ENLARGEMENT OF A 1 - FAMILY DWELLING BUILDING AS PER PLANS SUBMITTED AND OBTAIN A CERTIFICATE OF OCCUPANCY.
Q00965117-S1
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedALSS CONSTRUCTION INC05/06/2026
DOB NOWPlumbingSigned-offAQUEDUCT MECHANICAL CORP03/27/2025
DOB NOWConstruction FenceSigned-offALSS CONSTRUCTION INC08/12/2024
DOB NOWGeneral ConstructionPermit IssuedALSS CONSTRUCTION INC08/12/2024
DOB NOWFoundationPermit IssuedALSS CONSTRUCTION INC08/12/2024
DOB NOWStructuralPermit IssuedALSS CONSTRUCTION INC08/12/2024
DOB NOWPlumbingSigned-offDARINKO PLUMBING CO05/08/2024
DOB NOWFoundationPermit IssuedALSS CONSTRUCTION INC05/06/2024
DOB NOWStructuralPermit IssuedALSS CONSTRUCTION INC05/06/2024
DOB NOWMechanical SystemsPermit IssuedALSS CONSTRUCTION INC04/10/2024
DOB NOWConstruction FenceSigned-offALSS CONSTRUCTION INC03/20/2024
BISOTISSUEDD & A STRUCTURAL CONTRACTORS07/14/2006
1 project · most recent 11/17/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/17/2025Permit IssuedALSS CONSTRUCTION INCHeating and Air Conditioning Systems
Heat / Cool
Senville SENDC-36HF 36,000 BTU · Heat Pump Outdoor ×2
1 project · most recent 05/08/2024
General Wiring
FiledStatusContractorScope
05/08/2024CompleteATTRACTIVE LIGHTING ELECLGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/10/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/28/2026Fail-Final CND-Occupancy InspectionFailView ↗
07/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/06/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/30/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
12/29/2025Mechanical SystemsSERDAR CEYLANspecial
12/29/2025Heating SystemsSERDAR CEYLANspecial
12/29/2025Fire-Resistant Penetrations and JointsSERDAR CEYLANspecial
12/29/2025MasonrySERDAR CEYLANspecial
12/29/2025Structural Stability – Alterations of existing buildingsQIUFAN JIANGspecial
12/29/2025Concrete - Cast-In-PlaceSERDAR CEYLANspecial
12/29/2025Fire-Resistance Rated ConstructionSERDAR CEYLANprogress
12/29/2025Energy Code Compliance InspectionsSERDAR CEYLANprogress
12/29/2025Lowest Floor ElevationQIUFAN JIANGprogress
12/29/2025FinalSERDAR CEYLANprogress
12/29/2025Permanent certificateSERDAR CEYLANenergy_progress
12/29/2025Shutoff dampersSERDAR CEYLANenergy_progress
12/29/2025HVAC-R and service water heating equipmentSERDAR CEYLANenergy_progress
12/29/2025Insulation placement and R valuesSERDAR CEYLANenergy_progress
12/29/2025Fenestration and door U-factor and product ratingsSERDAR CEYLANenergy_progress
12/29/2025Fenestration air leakageSERDAR CEYLANenergy_progress
12/29/2025Lighting controlsSERDAR CEYLANenergy_progress
12/29/2025Duct leakage testing, insulation and designSERDAR CEYLANenergy_progress
12/29/2025Fenestration areasSERDAR CEYLANenergy_progress
12/29/2025Air barrier - visual inspectionSERDAR CEYLANenergy_progress
12/29/2025HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
12/29/2025HVAC-R and service water heating system controlsSERDAR CEYLANenergy_progress
12/29/2025MeteringSERDAR CEYLANenergy_progress
12/29/2025Maintenance informationSERDAR CEYLANenergy_progress
12/29/2025Air barrier — testing QIUFAN JIANGenergy_progress
Latest 25 of 74.
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026Q00961378-I1Request digital key ↗
08/23/2026Q01006125-I1Request digital key ↗
08/23/2026Q00965117-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00965117-P1Open ↗
08/13/2026Q00965117-I1Open ↗
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature17
09/01/2026Q00961378-P3Open ↗
09/01/2026Q00961378-P3Open ↗
09/01/2026Q00965117-S2Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/01/2026Q00961378-P3Open ↗
09/01/2026Q00965117-S2Open ↗
09/01/2026Q00965117-S2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/23/2026Q00961378-I1Open ↗
08/23/2026Q00961378-P3Open ↗
08/23/2026Q01006125-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/23/2026Q00961378-I1Open ↗
08/23/2026Q00965117-S2Open ↗
08/23/2026Q00965117-S1Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q00965117-S1Open ↗
▸Other Documents9
▸DOB NOWPlot Diagram3
08/13/2026Q00965117-P1Open ↗
08/13/2026Q00965117-S1Open ↗
08/13/2026Q00965117-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q00965117-I1Open ↗
08/13/2026Q00965117-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00965117-P1Open ↗
08/13/2026Q00965117-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/23/2026Q00965117-I1Open ↗
08/15/2026Q00965117-P1Open ↗