← Back
Factory, industrial, semi-fireproof
26-15 123 STREET
QUEENS · BIN 4100658
💬 Discuss this project
1955Year Built
2Stories
F4Building Class
M1-1Zoning
8,208 sfGross Floor Area
1Units
16 Open Violations 15 unresolved · 1 paperwork only ▸FDNY Report ↗
Factory, industrial, semi-fireproof · Owner of record: S & S PROPELLER CO INC · 10,210 sf lot · 0.8 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 6 docs
Nothing on file for this building.
Building Lifecycle
All (23)Filed (2)Permit Issued (1)Signed Off (1)Violation (17)Inspection (2)
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/19/2024
Signed off — Alteration
OIL TO GAS CONVERSION BY INSTALLING 4 GAS FIRED UNIT HEATERS CONNECTED TO 2 NEW GAS METERS AND REMOVE EXISTING OIL FIRED BOILER AND ONE 275 GALLON FUEL OIL TANKS
Q00996704-I1
07/11/2024
Filed — Alteration
OIL TO GAS CONVERSION BY INSTALLING 4 GAS FIRED UNIT HEATERS CONNECTED TO 2 NEW GAS METERS AND REMOVE EXISTING OIL FIRED BOILER AND ONE 275 GALLON FUEL OIL TANKS
Q00996704-P1
06/17/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/04/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/28/2024
Permit issued — Plumbing
Q00996704-I1-PL
03/15/2024
Filed — Alteration
OIL TO GAS CONVERSION BY INSTALLING 4 GAS FIRED UNIT HEATERS CONNECTED TO 2 NEW GAS METERS AND REMOVE EXISTING OIL FIRED BOILER AND ONE 275 GALLON FUEL OIL TANKS
Q00996704-I1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/16/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/16/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/03/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/04/2008
Violation issued (ECB, open)
Construction
06/29/2001
Violation issued (ECB, closed)
Boilers
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
G. PEROTTO ASSOCIATES207/11/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
G PEROTTO ASSOCIATES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UNLIMITED PLG SOLUTIONSPlumbing107/08/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCENTA PLBG & HTG INC05/28/2024
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/04/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026Q00996704-P1Request digital key ↗
08/23/2026Q00996704-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/23/2026Q00996704-P1Open ↗
08/23/2026Q00996704-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026Q00996704-P1Open ↗
08/23/2026Q00996704-I1Open ↗