← Back
One story - permanent living quarter
147-03 7 AVENUE
QUEENS · BIN 4101889
💬 Discuss this project
1950Year Built
1Stories
A2Building Class
R2AZoning
1,150 sfGross Floor Area
1Units
One story - permanent living quarter · 4,121 sf lot · 0.28 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 12p · 1 filing · 11 docs
Cellar3p · 1 filing · 11 docs
1 job · most recent 03/14/2022
General Wiring
FiledStatusContractorScope
03/14/2022CompleteQEC ELECTRICAL SVCE CORPGeneral Wiring
Building Lifecycle
All (47)Filed (4)Permit Issued (3)Signed Off (2)Inspection (8)Special Inspection (30)
04/07/2022
Signed off — Alteration
CELLAR & 1ST FLOOR RENOVATION. EXISTING FRONT PORCH ENCLOSURE. NEW WINDOWS & NEW OPEN PORCHES.
Q00539800-I1
04/05/2022
Signed off — Alteration
NEW CELLAR BATHROOM. REPLACE 1ST FLOOR BATHROOM. REPLACE BOILER. REPLACE KITCHEN FIXTURE & APPLIANCES. NEW GAS BBQ. NEW WASHER/DRYER.
Q00539919-I1
04/05/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/10/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/04/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/25/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/13/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/13/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Patrizia Cimino
12/13/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Patrizia Cimino
12/13/2021
Special inspection requirement — Masonry
Patrizia Cimino
12/13/2021
Special inspection requirement — Concrete - Cast-In-Place
Patrizia Cimino
12/13/2021
Special inspection requirement — Fire-Resistance Rated Construction
Patrizia Cimino
12/13/2021
Special inspection requirement — Energy Code Compliance Inspections
Patrizia Cimino
12/13/2021
Special inspection requirement — Interior lighting power
Patrizia Cimino
12/13/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Patrizia Cimino
12/13/2021
Special inspection requirement — Insulation placement and R values
Patrizia Cimino
12/13/2021
Special inspection requirement — Air barrier - visual inspection
Patrizia Cimino
12/13/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
Patrizia Cimino
12/13/2021
Special inspection requirement — Fenestration air leakage
Patrizia Cimino
12/13/2021
Special inspection requirement — Fenestration areas
Patrizia Cimino
12/13/2021
Special inspection requirement — Energy Code Compliance Inspections
Patrizia Cimino
12/13/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Patrizia Cimino
12/13/2021
Special inspection requirement — HVAC-R and service water heating equipment
Patrizia Cimino
12/13/2021
Special inspection requirement — HVAC-R and service water heating system controls
Patrizia Cimino
12/10/2021
Filed — Alteration
NEW CELLAR BATHROOM. REPLACE 1ST FLOOR BATHROOM. REPLACE BOILER. REPLACE KITCHEN FIXTURE & APPLIANCES. NEW GAS BBQ. NEW WASHER/DRYER.
Q00539919-P1
12/10/2021
Filed — Alteration
CELLAR & 1ST FLOOR RENOVATION. EXISTING FRONT PORCH ENCLOSURE. NEW WINDOWS & NEW OPEN PORCHES.
Q00539800-P1
12/09/2021
Special inspection requirement — Energy Code Compliance Inspections
Patrizia Cimino
12/09/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Patrizia Cimino
12/09/2021
Special inspection requirement — HVAC-R and service water heating system controls
Patrizia Cimino
12/09/2021
Special inspection requirement — HVAC-R and service water heating equipment
Patrizia Cimino
12/09/2021
Special inspection requirement — Concrete - Cast-In-Place
Patrizia Cimino
12/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Patrizia Cimino
12/09/2021
Special inspection requirement — Masonry
Patrizia Cimino
12/09/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Patrizia Cimino
12/09/2021
Special inspection requirement — Energy Code Compliance Inspections
Patrizia Cimino
12/09/2021
Special inspection requirement — Fire-Resistance Rated Construction
Patrizia Cimino
12/09/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
Patrizia Cimino
12/09/2021
Special inspection requirement — Air barrier - visual inspection
Patrizia Cimino
12/09/2021
Special inspection requirement — Fenestration areas
Patrizia Cimino
08/30/2021
Permit issued — General Construction
Q00539800-I1-GC
08/06/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/06/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/06/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/19/2021
Permit issued — Plumbing
Q00539919-I1-PL
06/23/2021
Permit issued — General Construction
Q00539800-I1-GC
06/15/2021
Filed — Alteration
CELLAR & 1ST FLOOR RENOVATION. EXISTING FRONT PORCH ENCLOSURE. NEW WINDOWS & NEW OPEN PORCHES.
Q00539800-I1
06/15/2021
Filed — Alteration
NEW CELLAR BATHROOM. REPLACE 1ST FLOOR BATHROOM. REPLACE BOILER. REPLACE KITCHEN FIXTURE & APPLIANCES. NEW GAS BBQ. NEW WASHER/DRYER.
Q00539919-I1
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/28/2021$760K—Private party → Private party$661/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STOA DESIGN STUDIO LTD412/10/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOANNE'S CONSTRUCTION COGeneral Contractor403/21/2026
T.N.T. PLBG & HTG, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STOA DESIGN STUDIO LTD4501212/10/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJOANNE'S CONSTRUCTION CO08/30/2021
DOB NOWPlumbingSigned-offT.N.T. PLBG & HTG, INC07/19/2021
DOB NOWGeneral ConstructionSigned-offJOANNE'S CONSTRUCTION CO06/23/2021
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/05/2022Pass-Final General Construction Non-Directive 14PassView ↗
03/10/2022Fail-Final General Construction Non-Directive 14FailView ↗
03/04/2022Fail-Final General Construction Non-Directive 14FailView ↗
01/25/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/13/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/06/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/06/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/06/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
12/13/2021Structural Stability – Alterations of existing buildingsPatrizia Ciminospecial
12/13/2021Fire-Resistant Penetrations and JointsPatrizia Ciminospecial
12/13/2021MasonryPatrizia Ciminospecial
12/13/2021Concrete - Cast-In-PlacePatrizia Ciminospecial
12/13/2021Fire-Resistance Rated ConstructionPatrizia Ciminoprogress
12/13/2021Energy Code Compliance InspectionsPatrizia Ciminoprogress
12/13/2021Interior lighting powerPatrizia Ciminoenergy_progress
12/13/2021HVAC-R and service water piping design and insulationPatrizia Ciminoenergy_progress
12/13/2021Insulation placement and R valuesPatrizia Ciminoenergy_progress
12/13/2021Air barrier - visual inspectionPatrizia Ciminoenergy_progress
12/13/2021Fenestration and door U-factor and product ratingsPatrizia Ciminoenergy_progress
12/13/2021Fenestration air leakagePatrizia Ciminoenergy_progress
12/13/2021Fenestration areasPatrizia Ciminoenergy_progress
12/13/2021Energy Code Compliance InspectionsPatrizia Ciminoprogress
12/13/2021HVAC-R and service water piping design and insulationPatrizia Ciminoenergy_progress
12/13/2021HVAC-R and service water heating equipmentPatrizia Ciminoenergy_progress
12/13/2021HVAC-R and service water heating system controlsPatrizia Ciminoenergy_progress
12/09/2021Energy Code Compliance InspectionsPatrizia Ciminoprogress
12/09/2021HVAC-R and service water piping design and insulationPatrizia Ciminoenergy_progress
12/09/2021HVAC-R and service water heating system controlsPatrizia Ciminoenergy_progress
12/09/2021HVAC-R and service water heating equipmentPatrizia Ciminoenergy_progress
12/09/2021Concrete - Cast-In-PlacePatrizia Ciminospecial
12/09/2021Fire-Resistant Penetrations and JointsPatrizia Ciminospecial
12/09/2021MasonryPatrizia Ciminospecial
12/09/2021Structural Stability – Alterations of existing buildingsPatrizia Ciminospecial
Latest 25 of 34.
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026Q00539919-P1Request digital key ↗
08/26/2026Q00539919-I1Request digital key ↗
08/26/2026Q00539800-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature10
08/28/2026Q00539800-I1Open ↗
08/28/2026Q00539800-I1Open ↗
08/28/2026Q00539800-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026Q00539919-P1Open ↗
08/26/2026Q00539919-I1Open ↗
08/26/2026Q00539800-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/28/2026Q00539800-I1Open ↗
08/28/2026Q00539800-I1Open ↗
08/28/2026Q00539800-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026Q00539919-P1Open ↗
08/26/2026Q00539919-I1Open ↗
08/26/2026Q00539800-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00539800-I1Open ↗
08/13/2026Q00539919-I1Open ↗