← Back
Two family converted from one family
10-27 147 STREET
QUEENS · BIN 4102032
💬 Discuss this project
1920Year Built
2.75Stories
B3Building Class
R2AZoning
1,942 sfGross Floor Area
2Units
Two family converted from one family · 4,871 sf lot · 0.4 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 12p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
2 BY 4 ARCHITECTURE PC309/04/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CK COOLING & HEATING INCGeneral Contractor107/08/2026
TRI STATE PLBG & HTG INCPlumbing107/08/2026
Building Lifecycle
All (11)Filed (3)Permit Issued (2)Signed Off (2)Inspection (2)Special Inspection (2)
09/17/2021
Signed off — Alteration
INSTALL A NEW BATHROOM WITH NEW SHOWER, TOILET AND LAV IN THE 1ST FLOOR OF AN EXISTING ONE FAMILY DWELLING UNIT AS PER PLAN. NO CHANGE IN USE, OCCUPANCY AND EGRESS. PLUMBING WORK FILED UNDER JOB# Q00543668
Q00543667-I1
09/16/2021
Signed off — Alteration
INSTALL A NEW BATHROOM WITH NEW SHOWER, TOILET , LAV AND F.D. IN CONJUNCTION WITH GC JOB# Q00543667.
Q00543668-I1
09/13/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/08/2021
Special inspection requirement — Energy Code Compliance Inspections
CHI WANG LEE
09/04/2021
Filed — Alteration
INSTALL A NEW BATHROOM WITH NEW SHOWER, TOILET , LAV AND F.D. IN CONJUNCTION WITH GC JOB# Q00543667.
Q00543668-P2
08/19/2021
Special inspection requirement — Energy Code Compliance Inspections
CHI WANG LEE
08/09/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/26/2021
Permit issued — Plumbing
Q00543668-I1-PL
07/22/2021
Filed — Alteration
INSTALL A NEW BATHROOM WITH NEW SHOWER, TOILET , LAV AND F.D. IN CONJUNCTION WITH GC JOB# Q00543667.
Q00543668-I1
07/22/2021
Permit issued — General Construction
Q00543667-I1-GC
07/07/2021
Filed — Alteration
INSTALL A NEW BATHROOM WITH NEW SHOWER, TOILET AND LAV IN THE 1ST FLOOR OF AN EXISTING ONE FAMILY DWELLING UNIT AS PER PLAN. NO CHANGE IN USE, OCCUPANCY AND EGRESS. PLUMBING WORK FILED UNDER JOB# Q00543668
Q00543667-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDW PLUMBING INC07/26/2021
DOB NOWGeneral ConstructionSigned-offCK COOLING HEATING07/22/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/13/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/09/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
09/08/2021Energy Code Compliance InspectionsCHI WANG LEEprogress
08/19/2021Energy Code Compliance InspectionsCHI WANG LEEprogress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/27/2026Q00543667-I1Request digital key ↗
08/27/2026Q00543668-I1Request digital key ↗
08/27/2026Q00543668-P2Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026Q00543668-P2Open ↗
08/27/2026Q00543668-I1Open ↗
08/13/2026Q00543667-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026Q00543668-P2Open ↗
09/01/2026Q00543668-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026Q00543668-I1Open ↗
08/27/2026Q00543668-P2Open ↗
08/13/2026Q00543667-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00543667-I1Open ↗