← Back
Two stories - detached, small or mid-size
12-12 148 STREET
QUEENS · BIN 4102101
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R2AZoning
1,350 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,500 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
Architecture
Floor 21p · 1 filing · 8 docs
Floor 1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRANK J QUATELA ARCHITECT P.C308/07/2026
Building Lifecycle
All (29)Filed (3)Objection (2)Special Inspection (24)
08/13/2026
Objection resolved — Resolved
08/11/2026
Objection raised — Other
08/07/2026
Filed — Alteration
INTERIOR RENOVATION & HORIZONTAL ADDITION @ REAR OF 2ND STORY. NEW KITCHEN & BATH FINISHES AT 1ST FLOOR. NEW PARTITIONS, DOORS, WINDOWS, FINISHES, KITCHEN CABINETRY, & HVAC AS PER PLANS. NO CHANGE TO THE USE, EGRESS, OR OCCUPANCY OF THE EXISTING BUILDING.
Q01417285-S1
08/05/2026
Filed — Alteration
INTERIOR RENOVATION & HORIZONTAL ADDITION @ REAR OF 2ND STORY. NEW KITCHEN & BATH FINISHES AT 1ST FLOOR. NEW PARTITIONS, DOORS, WINDOWS, FINISHES, KITCHEN CABINETRY, & HVAC AS PER PLANS. NO CHANGE TO THE USE, EGRESS, OR OCCUPANCY OF THE EXISTING BUILDING.
Q01417285-I1
07/29/2026
Filed — Alteration
ERECT CONSTRUCTION FENCE TO SAFE GUARD PROPERTY AT FRONT. IN CONJUNCTION WITH GC APPLICATION Q01417285. NO CHANGE TO THE USE, EGRESS, AND OCCUPANCY
Q01417726-I1
07/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/27/2026
Special inspection requirement — Energy Code Compliance Inspections
07/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/15/2026
Special inspection requirement — Mechanical Systems
06/15/2026
Special inspection requirement — Final
06/15/2026
Special inspection requirement — Footing and Foundation
06/15/2026
Special inspection requirement — Energy Code Compliance Inspections
06/15/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/15/2026
Special inspection requirement — Structural Wood Frame
06/15/2026
Special inspection requirement — Duct leakage testing, insulation and design
06/15/2026
Special inspection requirement — Fenestration areas
06/15/2026
Special inspection requirement — Fenestration air leakage
06/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/15/2026
Special inspection requirement — Maintenance information
06/15/2026
Special inspection requirement — Insulation placement and R values
06/15/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/15/2026
Special inspection requirement — Interior lighting power
06/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/15/2026
Special inspection requirement — Permanent certificate
06/15/2026
Special inspection requirement — Air barrier - visual inspection
06/15/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
06/15/2026
Special inspection requirement — Heating Systems
06/15/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nothing on file for this building.
1 project · most recent 08/07/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/07/2026——Heating and Air Conditioning Systems
Heat / Cool
Goodman GSZB404810 48,000 BTU · Condensing Unit ×2
1 project · most recent 08/07/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/07/2026——Gas, Water/Sanitary
1 project · most recent 08/07/2026
Wood
FiledStatusContractorScope
08/07/2026——Wood
1 project · most recent 07/29/2026
Fence
FiledStatusContractorScope
07/29/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
07/27/2026Fire-Resistant Penetrations and Joints—special
07/27/2026Energy Code Compliance Inspections—progress
07/27/2026HVAC-R and service water piping design and insulation—energy_progress
06/15/2026Mechanical Systems—special
06/15/2026Final—progress
06/15/2026Footing and Foundation—progress
06/15/2026Energy Code Compliance Inspections—progress
06/15/2026Fire-Resistance Rated Construction—progress
06/15/2026Structural Wood Frame—progress
06/15/2026Duct leakage testing, insulation and design—energy_progress
06/15/2026Fenestration areas—energy_progress
06/15/2026Fenestration air leakage—energy_progress
06/15/2026Fire-Resistant Penetrations and Joints—special
06/15/2026HVAC-R and service water heating equipment—energy_progress
06/15/2026Maintenance information—energy_progress
06/15/2026Insulation placement and R values—energy_progress
06/15/2026HVAC-R and service water heating system controls—energy_progress
06/15/2026Interior lighting power—energy_progress
06/15/2026HVAC-R and service water piping design and insulation—energy_progress
06/15/2026Permanent certificate—energy_progress
06/15/2026Air barrier - visual inspection—energy_progress
06/15/2026Fenestration and door U-factor and product ratings—energy_progress
06/15/2026Heating Systems—special
06/15/2026Structural Stability – Alterations of existing buildings—special
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/16/2026Q01417726-I1Request digital key ↗
08/16/2026Q01417285-I1Request digital key ↗
08/15/2026Q01417285-S1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026Q01417285-I1Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/16/2026Q01417726-I1Open ↗
08/16/2026Q01417285-S1Open ↗
08/16/2026Q01417285-S1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/16/2026Q01417285-S1Open ↗
08/16/2026Q01417285-I1Open ↗
08/15/2026Q01417285-S1Open ↗
▸Other Documents1
▸DOB NOWSite Survey: Initial1
08/16/2026Q01417285-I1Open ↗